Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG06 : Reuni�n�2007-11-19�: Documentos Temporales� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG06� TD-GEN�(2007-11-19)�

UIT-T�SG06

Planta exterior e instalaciones interiores relacionadas

Periodo de estudios 2005

Reuni�n� del 2007-11-19 al 2007-11-23

Lugar : Suiza [Ginebra]

Otras reuniones : 2009-10-12� 2008-12-012008-04-14� [ 2007-11-19 ]� 2007-05-142006-09-192005-12-122005-01-31

Resultados :61 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Documentos Temporales �(GEN) ��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 322-GEN ]
Final list of participants � TSB QALL/6 2007-11-23
[ 321-GEN ]
OUTGOING LS - Draft LS to ITU-T SG4 on OSS requirements works � Rapporteur Q4/6 Q4/6 2007-11-22
[ 320-GEN ]
First revised draft for Qx/6 for next Study Period � Rapporteur Q4/6 Q4/6 2007-11-22
[ 319-GEN ]
(Rev.1)
Draft Report of the fourth meeting of Study Group 6 "Outside plant and related indoor installations" (Geneva, 19-23 November 2007) � TSB QALL/6 2007-11-23
[ 318-GEN ]
OUTGOING LS - Reply to Q1/15 onupdate on Access Network activities in SG6 � Liaison Officer to SG15 QALL/6 2007-11-22
[ 317-GEN ]
Draft new ITU-T Recommendation L.irud "Methods for inspecting and repairing underground PVC ducts" (for consent) � Editor Rec. L.irud Q2/6 2007-11-22
[ 316-GEN ]
Draft new ITU-T Recommendation L.35 Appendix II "Korean experience on access network installation procedures" (for agreement) � Editor Rec. L.35 Q2/6 2007-11-22
[ 315-GEN ]
Draft new ITU-T Recommendation L.mct "Maintenance of cable tunnels" (for consent) � Editor Rec. L.mct Q2/6 2007-11-22
[ 314-GEN ]
(Rev.1)
Draft WP 2/6 Report (Application of products) � Chairman WP2/6 Q9/6, Q8/6, Q7/6, Q6/6, Q5/6 2007-11-22
[ 313-GEN ]
(Rev.1)
Draft WP 1/6 Report (Infrastructures and Environment) � Chairman WP1/6 Q4/6, Q3/6, Q2/6, Q1/6 2007-11-22
[ 312-GEN ]
Study plan of Q5/6 for the next study period � Rapporteur Q5/6 Q5/6 2007-11-22
[ 311-GEN ]
(Rev.1)
Technical Paper LS.GUIDE "Guide on the use of ITU-T L-series Recommendations" - Version 0.2 � TSB QALL/6 2007-11-23
[ 310-GEN ]
First draft for Qx/6 for next Study Period � Rapporteur Q4/6 Q4/6 2007-11-22
[ 309-GEN ]
Invitation to hold the next SG6 meeting in China, 14-18 April 2008 � Chairman SG6 QALL/6 2007-11-22
[ 308-GEN ]
Creating a Regional Group: Brazil's response to ITU-T Study Groups and Proposal of an Action Plan � SG6 Focal Point - Regional Groups QALL/6 2007-11-22
[ 307-GEN ]
(Rev.1)
Study plan of Q7/6 for the next study period � Rapporteur Q7/6 Q7/6 2007-11-23
[ 306-GEN ]
Draft of Q8/6 for next Study Period � Rapporteur Q8/6 Q8/6 2007-11-21
[ 305-GEN ]
(Rev.1)
Study plan of Q6/6 for the next study period � Rapporteur Q6/6 Q6/6 2007-11-21
[ 304-GEN ]
ETSI TS 102 566 V1.1.1 (2007-09) - Common Requirements for Automated Distribution Frames (ADF) at the street cabinet � Chairman SG6 QALL/6 2007-11-21
[ 303-GEN ]
Draft new ITU-T Recommendation L.cis "Installation of optical fibre cables inside sewer ducts" � Editor Rec. L.cis Q7/6, Q2/6 N/A
[ 302-GEN ]
(Rev.1)
First draft of Q2/6 for next Study Period � Rapporteur Q2/6 Q2/6 2007-11-19
[ 301-GEN ]
(Rev.1)
Status of texts under WTSA-04 Resolution 1 Procedures � TSB QALL/6 2007-11-19
[ 300-GEN ]
LS - SG2, Lead Study Group on Service Definition, Numbering, and Routing; Lead Study Group for Telecommunication for Disaster Relief/Early Warning � ITU-T SG2 QALL/6 2007-11-13
[ 299-GEN ]
Liaison report of the October meeting of SC86A � Liaison Officer for IEC SC86A Q7/6, Q2/6 2007-11-09
[ 298-GEN ]
LS - Cable construction and installation Recommendations � SC86A Liaison Officer Q7/6, Q2/6 2007-11-09
[ 297-GEN ]
Draft new Recommendation: "Operations support system requirements for infrastructure and network elements management using ID technology" � Rapporteur Q4/6 Q4/6 2007-11-09
[ 296-GEN ]
(Rev.1-2)
Draft revised Recommendation L.36, including comments by IEC 86A-B (for consent) � Rapporteur Q9/6 Q9/6 2007-11-09
[ 295-GEN ]
L.36: draft revised text, including comments by IEC 86A-B ; change log � Rapporteur Q9/6 Q9/6 2007-11-09
[ 294-GEN ]
(Rev.1)
Draft revised Recommendation L.12, including comments by IEC 86A-B (for consent) � Rapporteur Q9/6 Q9/6 2007-11-07
[ 293-GEN ]
L.12 : draft revised text, including comments by IEC 86A-B ; change log � Rapporteur Q9/6 Q9/6 2007-11-07
[ 292-GEN ]
(Rev.1)
Updated Draft new ITU-T Recommendation L.cobroa "Design, construction, and installation of copper networks for broadband access including copper networks connected to optical fibre networks" (for consent) � Rapporteur Q5/6 Q5/6 2007-11-07
[ 291-GEN ]
LS - Report on the 6th FG IPTV meeting � FG IPTV QALL/6 2007-11-02
[ 290-GEN ]
(Rev.1-3)
Revised draft for new Recommendation L.andb "Database for optical access network infrastructure" (for consent) � Editor Rec. L.andb Q8/6 2007-10-29
[ 289-GEN ]
Revised draft recommendation L.59 "Optical fibre cables for indoor application" (for consent) � Rapporteur Q7/6 Q7/6 2007-10-29
[ 288-GEN ]
(Rev.1)
Summary of replies to TSB Circular 156 � Rapporteur Q7/6 Q7/6 2007-10-29
[ 287-GEN ]
(Rev.1)
Summary of replies to TSB Circular 157 � Rapporteur Q7/6 Q7/6 2007-10-29
[ 286-GEN ]
LS - Report to TSAG on Achievements of SG 17 as the Lead Study Group on Telecommunication Security since its meeting on 6-18 December 2006 � ITU-T SG 17 QALL/6 2007-10-23
[ 285-GEN ]
LS - LS on Action plan of the QoS flagship Group � ITU-T Study Group 12 QALL/6 2007-10-19
[ 284-GEN ]
LS - LS on the Creation of a Focus Group on "From/In/To Cars Communications II" � ITU-T Study Group 12 QALL/6 2007-10-19
[ 283-GEN ]
LS - Reply LS to TSAG and ITU-T Restructuring Correspondence Group � ITU-T Study Group 12 QALL/6 2007-10-19
[ 282-GEN ]
LS - Technical Output of Focus Group on Identity Management (FG IdM) � ITU-T SG17 QALL/6 2007-10-03
[ 281-GEN ]
LS - Rechartering of the NGN Management Focus Group � ITU-T SG4 QALL/6 2007-09-20
[ 280-GEN ]
LS - Reply LS to TSAG on creation of ITU-T Restructuring Correspondence Group and request for inputs (TSAG-LS 23) � ITU-T SG4 QALL/6 2007-09-20
[ 279-GEN ]
LS - Report of FG IPTV progress and request for comment � FG IPTV QALL/6 2007-08-03
[ 278-GEN ]
LS - Report of the 3rd JCA-NID meeting held in Geneva on the 3rd of July 2007 � JCA-NID Convener QALL/6 2007-08-03
[ 277-GEN ]
LS - Aspects of common and critical interest to the satellite industry � ICG-SAT QALL/6 2007-08-03
[ 276-GEN ]
LS - Activities on standardization for Emergency Telecommunications � ICG SAT QALL/6 2007-08-03
[ 275-GEN ]
LS - New Questions on advanced multimedia systems and on multimedia application platforms and end systems for IPTV � ITU-T SG16 QALL/6 2007-07-13
[ 274-GEN ]
LS - ITU-T activities on bridging the standardization gap � TDAG QALL/6 2007-07-02
[ 273-GEN ]
LS - Reply to TSAG on creation of ITU-T Restructuring Correspondence Group and request for inputs (TSAG-LS 23) � ITU-T SG15 QALL/6 2007-07-02
Resultados :61 documentos
Resultados :� 1 - 2 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-2-4