Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG05 : Reuni�n�2008-02-25�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG05� C�(2008-02-25)�

UIT-T�SG05

Protecci�n contra los efectos del entorno electromagn�tico

Periodo de estudios 2005

Reuni�n� del 2008-02-25 al 2008-02-29

Lugar : Suiza [Ginebra]

Otras reuniones : 2008-11-242007-11-192007-05-142006-09-182006-05-222005-12-122005-06-132004-11-08

Resultados :16 documentos
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 66 ]
Suggestion of supplement for the earth resistance measurement method in the part of "Earthing and Bonding" Handbook � Korea (Republic of) Q6/5 2008-02-14
[ 65 ]
Proposal for the issue of revision of Recommendation K.61 � Korea (Republic of) Q3/5 2008-02-14
[ 64 ]
Comments on measurement points specified in K.61rev � NTT CoCoMo Inc. (Japan) , NICT (Japan) Q3/5 2008-02-14
[ 63 ]
Consideration of Measurements and Calculation Methods of The Electromagnetic Field Strength Radiated from Smart Antenna � China Mobile Communications Corporation Q3/5 2008-02-14
[ 62 ]
Proposal of draft K.low � Huawei Technologies Co. Ltd. (China) Q12/5 2008-02-14
[ 61 ]
Proposal for draft Recommendation K.var � Huawei Technologies Co. Ltd. (China) Q13/5 2008-02-14
[ 60 ]
Comments on Revision of Recommendation K.43 � Brazil Q12/5 2008-02-14
[ 59 ]
The outline of "The protection guideline of the telecommunication equipment to overvoltage due to lightning"(CIAJ CES-Q007-1) � CIAJ (Japan) Q6/5, Q4/5 2008-02-14
[ 58 ]
Working document toward draft new Recommendation K.guide � Telekomunikacja Polska, Poland Q3/5 2008-02-12
[ 57 ]
Harmonization between K.21 (AC port resistibility test) and IEC 60950-1 � CIAJ Q4/5 2008-02-11
[ 56 ]
Malfunction cases of the internal port for the optic communication customer premises due to lightning surge � NTT Q6/5, Q4/5 2008-02-11
[ 55 ]
A case study for EMC problem on NGN service � NTT Q12/5, Q10/5 2008-02-08
[ 54 ]
Continuous conducted RF test for VDSL system connected with premises cables � NTT Q8/5 2008-02-07
[ 53 ]
Proposal for adding the earthing and bonding requirement for metallic strength element and sheath � ZTE Corporation Q6/5 2008-02-04
[ 52 ]
Proposal for adding supplement explanation for DC-C/DC-I system � ZTE Corporation Q6/5 2008-02-04
[ 51 ]
Proposal for the conducted emissions limits below 150KHz for communications equipment � ZTE Corporation Q12/5 2008-02-04
Resultados :16 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-25