Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG11 : Reuni�n�2004-03-01�: Documentos Temporales� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG11� TD�(2004-03-01)�

UIT-T�SG11

Requisitos y protocolos de se�alizaci�n

Periodo de estudios 2001

Reuni�n� del 2004-03-01 al 2004-03-12

Lugar : Suiza [Ginebra]

Otras reuniones : [ 2004-03-01 ]� 2003-09-012002-11-11� 2002-02-18� 2001-07-02� 2001-05-14� 2001-03-21� 2000-11-27�

Documentos Temporales �(GEN) �[�AI/Cuesti�n:�Q8/11�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 73-GEN ]
Discussions of WP 2/11 plenary session � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-03-09
[ 62-GEN ]
(Rev.1)
Draft Discussion summary of Q8/11 meetings on 4-5 March 2004 � WP2/11 Chairman (G. Ratta) Q8/11 2004-03-08
[ 59-GEN ]
TRQ.IPQOS.SIG.CS1 (Editing Output) � Editor (T. Tsou) Q8/11 2004-03-05
[ 50-GEN ]
Editors proposal for TECHNICAL REPORT TRQ.BICC/ISUPSIP Set 2 of Requirements for Interworking BICC/ISUP Network with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol � Temporary Editor (R. Jesske) Q12/11, Q16/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11 2004-03-04
[ 49-GEN ]
TECHNICAL REPORT TRQ.DSS1SIP Requirements for Interworking DSS1 with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol � Temporary Editor (R. Jesske) Q16/11, Q12/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11 2004-03-04
Documentos presentados : 5 de un total de 14� relacionaron a este reuni�n (vea m�s...)

Documentos Temporales �(PLEN) �[�AI/Cuesti�n:�Q8/11�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 30-PLEN ]
WP2/11 Document Roadmap for SG 11 Plenary � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-03-10
[ 29-PLEN ]
(Rev.1-2)
WP2/11 PART I Report � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-03-10
[ 18-PLEN ]
(Rev.1-3)
Terms of Reference for Interim Meeting on IP QoS Signalling Requirements � WP2/11 Chairman (G. Ratta) Q8/11 2004-03-08
[ 8-PLEN ]
Roadmap for documents associated with discussions of Questions assigned to WP2/11 � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-02-29

Documentos Temporales �(WP2) �[�AI/Cuesti�n:�Q8/11�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 26-WP2 ]
Draft discussion summary of Q8/11 meetings on 4-5 March 2004 � WP 2/11 Chairman (G. Ratta) Q8/11 2004-03-05
[ 19-WP2 ]
Proposed Agenda for Q8/11 Discussions � WP2/11 Chairman (G. Ratta) Q8/11 2004-02-29
[ 15-WP2 ]
Reply to Proposal on control plane interworking between FR and MPLS � SG 17 (GVA, 10-19 Sept. 2003) Q5/17, Q8/11 2003-10-07
[ 14-WP2 ]
(Rev.1)
Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QoS � Editor pro tem (G. Ratta) Q9/11, Q8/11, Q7/11 2004-02-23
[ 13-WP2 ]
(Rev.1)
WP 2/11 Work Programme � WP2/11 Vice-Chairman (D. Knight) Q9/11, Q8/11, Q7/11, Q6/11 2004-02-21
Documentos presentados : 5 de un total de 11� relacionaron a este reuni�n (vea m�s...)

Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-2-4