Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG11 : Reuni�n�2004-03-01�: Documentos Temporales� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG11� TD�(2004-03-01)�

UIT-T�SG11

Requisitos y protocolos de se�alizaci�n

Periodo de estudios 2001

Reuni�n� del 2004-03-01 al 2004-03-12

Lugar : Suiza [Ginebra]

Otras reuniones : [ 2004-03-01 ]� 2003-09-012002-11-11� 2002-02-18� 2001-07-02� 2001-05-14� 2001-03-21� 2000-11-27�

Documentos Temporales �(GEN) �[�AI/Cuesti�n:�Q7/11�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 73-GEN ]
Discussions of WP 2/11 plenary session � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-03-09
[ 51-GEN ]
(Rev.1)
Q7/11 Meeting Minutes � Q7/11 Rapporteur (K. Kenyoshi) Q7/11 2004-03-04
[ 50-GEN ]
Editors proposal for TECHNICAL REPORT TRQ.BICC/ISUPSIP Set 2 of Requirements for Interworking BICC/ISUP Network with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol � Temporary Editor (R. Jesske) Q12/11, Q16/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11 2004-03-04
[ 49-GEN ]
TECHNICAL REPORT TRQ.DSS1SIP Requirements for Interworking DSS1 with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol � Temporary Editor (R. Jesske) Q16/11, Q12/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11 2004-03-04
[ 23-GEN ]
Liaison Statement on NGN studies � SG13 (GVA 3-12 February 2004) QALL/13, Q9/11, Q8/11, Q7/11, QN3/11, QN2/11, QN1/11 2004-02-17
Documentos presentados : 5 de un total de 7� relacionaron a este reuni�n (vea m�s...)

Documentos Temporales �(PLEN) �[�AI/Cuesti�n:�Q7/11�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 30-PLEN ]
WP2/11 Document Roadmap for SG 11 Plenary � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-03-10
[ 29-PLEN ]
(Rev.1-2)
WP2/11 PART I Report � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-03-10
[ 16-PLEN ]
+Corr.1
Draft TRQ 2840: Supplement 49, Signalling Requirements to Support IP Telephony � Q7/11 Rapporteur (K. Kenyoshi) Q7/11 2004-03-05
[ 8-PLEN ]
Roadmap for documents associated with discussions of Questions assigned to WP2/11 � WP2/11 Chairman (G. Ratta) Q9/11, Q8/11, Q7/11, Q6/11 2004-02-29

Documentos Temporales �(WP2) �[�AI/Cuesti�n:�Q7/11�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 21-WP2 ]
(Rev.1)
Draft Signalling Requirements to support IP telephony (INPUT) � Rapporteur (K. Kenyoshi) Q7/11 2004-03-01
[ 20-WP2 ]
Proposed Agenda of Q.7/11 (SWP2-2) � Rapporteur (K. Kenyoshi) Q7/11 2004-03-01
[ 14-WP2 ]
(Rev.1)
Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QoS � Editor pro tem (G. Ratta) Q9/11, Q8/11, Q7/11 2004-02-23
[ 13-WP2 ]
(Rev.1)
WP 2/11 Work Programme � WP2/11 Vice-Chairman (D. Knight) Q9/11, Q8/11, Q7/11, Q6/11 2004-02-21
[ 6-WP2 ]
Liaison Reply to ITU-T SG 11 on Signalling Requirements to support IP Telephony � SG 9 (Honolulu, 15-21 January 2004) Q13/9, Q12/9, Q10/9, Q7/11 2004-02-04
Documentos presentados : 5 de un total de 7� relacionaron a este reuni�n (vea m�s...)

Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-2-4