Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG11 : Reuni�n�2002-11-11�: Documentos Temporales� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG11� TD-WP2�(2002-11-11)�

UIT-T�SG11

Requisitos y protocolos de se�alizaci�n

Periodo de estudios 2001

Reuni�n� del 2002-11-11 al 2002-11-22

Lugar : Suiza [Ginebra]

Otras reuniones : 2004-03-012003-09-01� [ 2002-11-11 ]� 2002-02-18� 2001-07-02� 2001-05-14� 2001-03-21� 2000-11-27�

Resultados :45 documentos
Documentos Temporales �(WP2) ��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 45-WP2 ]
Draft Signalling Requirements to support IP Telephony � Q7/11 Rapporteur (K. Kenyoshi) Q7/11 2002-11-20
[ 44-WP2 ]
Report of the Q8/11 and joint Q 8 & 9/11 meetings � Rapporteur (R. Schumacher) Q8/11, Q9/11 2002-11-20
[ 43-WP2 ]
(Rev.1)
Draft Technical Report TRQ.- Signalling Requirements for IP-QoS � Editor (M. Dolly) Q8/11 2002-11-21
[ 42-WP2 ]
(Rev.1)
Liaison Statements Generated by Questions in WP2/11 � WP2/11 Vice Chairman (D. Knight) Q6/11, Q7/11, Q8/11, Q9/11 2002-11-20
[ 41-WP2 ]
Report of joint Qs6/11 and 9/11 and joint Qs 6/11 and 7/11 discussions � Q6/11 Rapporteur (K. Mainwaring) Q6/11, Q7/11, Q9/11 2002-11-19
[ 40-WP2 ]
(Rev.1)
Draft Supplement: Signalling Support for Emergency Telecommunications Service (ETS) and the International Emergency Preference Scheme (IEPS) � Editor (J. Trakinat) Q6/11 2002-11-21
[ 39-WP2 ]
(Rev.1)
Report of the Question 9/11 Meeting � Temporary Rapporteur (D. Knight) Q9/11 2002-11-20
[ 38-WP2 ]
Draft Supplement TRQ.amsir - Geneva, November 2002 � Editor (J. Leutchford) Q8/11 2002-11-18
[ 37-WP2 ]
(Rev.1)
Draft TRQ: RSVP for MPLS Resource Control Signalling � Editor (R. Kapoor) Q8/11 2002-11-21
[ 36-WP2 ]
Technical Report TRQ.NSIP Signalling Requirements for Carrying Narrowband Service Signalling Information within IP-Based Signalling Systems to Support Interworking of Services � Editor (T. Fu) Q6/11, Q9/11 2002-11-14
[ 35-WP2 ]
Agenda for the Question 9/11 Meeting � Temporary Rapporteur (D. Knight) Q9/11 2002-11-12
[ 34-WP2 ]
Agenda and work plan of the Q.7/11 meeting � Q7/11 Rapporteur (K. Kenyoshi) Q7/11 2002-11-12
[ 33-WP2 ]
Calculation method of B-ISDN Statistical Multiplexing Efficiency � SG11 Chairperson (Y. Hiramatsu) Q8/11 2002-11-11
[ 32-WP2 ]
(Rev.1)
Agenda of Q6/11 and joint Qs 6 & 9/11 � Q.6/11 Rapporteur (K.Mainwaring) Q6/11, Q9/11 2002-11-12
[ 31-WP2 ]
Draft Supplement: Application of RSVP-TE for MPLS Resource Control Signalling in Public Networks � Editor Q8/11 2002-11-11
[ 30-WP2 ]
"Narrowband Bearer Services over MPLS Signalling Requirements" baseline (TRQ.NBoMPLS) � Editor Q8/11 2002-11-11
[ 29-WP2 ]
"Multi-Service over MPLS Framework" baseline (TRQ.MSoMPLS) � Editor (R. Schumacher) Q8/11 2002-11-11
[ 28-WP2 ]
Proposed Agenda for Q.8/11 Discussions � Q.8/11 Rapporteur (R. Schumacher) Q8/11 2002-11-11
[ 27-WP2 ]
Liaison Statement - Voice Services over MPLS � SG13 (GVA 29 Oct - 8 Nov 2002) Q11/13, Q5/13, Q8/11 2002-11-08
[ 26-WP2 ]
Liaison Statement to SGs 12, 11 & 16 - Response to SG12 on Comments on the initial draft of Y.qosar � SG13 (GVA 29 Oct - 8 Nov 2002) Q15/12, Q16/13, Q8/11, QF/16 2002-11-08
[ 25-WP2 ]
ATM-MPLS network interworking � SG13 (GVA 29 Oct - 8 Nov 2002) Q5/13, Q8/11 2002-11-08
[ 24-WP2 ]
Liaison Statement - Response to Progress of the Discussion on Generic end-to-end QoS Service Requirements � SG13 (GVA 29 Oct - 8 Nov 2002) Q6/13, Q8/11 2002-11-08
[ 23-WP2 ]
Liaison Statement to SGs 11, 2 & 16 - Draft Recommendation Y.1530 (November 2002) � SG13 (GVA 29 Oct - 8 Nov 2002) Q5/2, Q6/11, Q6/2, Q7/11, Q8/11, Q9/11, Q9/13, QF/16 2002-11-08
[ 22-WP2 ]
Liaison Statement on SG 13 work on Y.qosar to ITU-T SGs 2,4,9 & 11, ITU-R WP8F � SG13 (GVA 29 0ct - 8 Nov 2002) Q16/13, Q8/11 2002-11-08
[ 21-WP2 ]
(Rev.1)
TRQ.IPBCP.CS2: Requirements for Capability Set 2 of the IP Bearer Control Protocol (Input) � Editor (D. Knight) Q9/11 2002-11-19
[ 20-WP2 ]
Report of the Newbury Interim Joint Q.6/11 & 9/11 Meeting (17-21 June 2002) � Rapporteur Q6/11 (K. Mainwaring) Q6/11, Q9/11 2002-11-05
[ 19-WP2 ]
Draft Signalling Requirements for AAL Type 2 to IP Interworking (TRQ.AAL2IP.iw), Editor's Input � Editor (B. Pfeil) Q9/11 2002-10-30
[ 18-WP2 ]
Agreed Ottawa output of Draft Signalling Requirements for AAL Type 2 to IP Interworking (TRQ.AAL2IP.iw) � Editor (B. Pfeil) Q9/11 2002-10-30
[ 17-WP2 ]
Liaison Statement to all ITU-T SGs - SG13 work on interworking with MPLS � SG13 (Chitose, Japan, 8 July 2002) Q5/13, Q8/11 2002-07-24
[ 16-WP2 ]
Draft Technical Report TRQ.IPC.CS1 (Signalling Requirements for IP Connection Control in Radio Access Networks Capability Set 1) � Editor (L. Graf) Q9/11 2002-10-18
[ 15-WP2 ]
Draft Technical Report TRQ.AAL2.CS3 (Signalling Requirements for AAL Type 2 Signalling Capability Set 3) � Editor (L. Graf) Q9/11 2002-10-18
[ 14-WP2 ]
Liaison Statement to SGs 2,11,12, &13 - Comments on Draft Recommendation E.QSC � QF Rapprtr. meeting (Bruges 24-28.06.02) Q8/11, Q9/11, QF/16 2002-07-19
[ 13-WP2 ]
Liaison Statement to SGs 11,12 & 13 - Comments on generic end-to-end QoS service requirements � Q.F Rapprt meeting, Bruges (24-28.6.02) Q8/11, Q9/11, QF/16 2002-07-19
[ 12-WP2 ]
Liaison reply to SG 13 and SG 11 concerning joint activity on generic requirements for end-to-end QoS including the appropriate protocol mechanism for service control and signalling � SG9 (GVA 3-7 JUNE 2002) Q13/9, Q8/11, Q9/11 2002-06-27
[ 11-WP2 ]
Liaison Statement - Comments on liaison on generic end-to-end QoS service requirements � SG12 (GVA 27-31 MAY 2002) Q13/12, Q8/11, Q9/11 2002-06-03
[ 10-WP2 ]
Liaison Statement to ITU-T SGs 2,9,11,12,13,15,16 & 17 and ITU-R WP9A - Consent on Draft New Recommendation M.2301 (ex-M-23ip) � SG 4 (GVA 8-19 APR. 2002) 6/11, 8/11, 9/11 2002-10-28
[ 9-WP2 ]
(Rev.2)
Liaison Statement to SGs 11,12,13,16 & SSG - Response to SG 11 on proposed joint activity on a generic protocol mechanism for end-to-end QoS service control and signalling protocol development based on IP transfer capabilities and IP QoS classes � SG9 (GVA 3-7 DEC. 2002) Q10/9, Q13/9, Q8/11, Q9/11 2002-04-09
[ 8-WP2 ]
Liaison Statement to SGs 11, 3 & 13 - Service Definition of "IP TELEPHONY" and "INTERNET TELEPHONY" � SG2 (GVA 7-16 MAY 2002) Q3/2, Q7/11 2002-05-20
[ 7-WP2 ]
Liaison Statement to ITU-T SGs 4, 6, 9, 11, 13, 16, 17 & ITU-R SGs 4, 8 &9 - New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan � SG15 (GVA 29.04.02 -10.05.02) Q9/11, QALL/15 2002-05-17
[ 6-WP2 ]
Liaison Statement to SGs 9,11,13,16 &17 - Transport of IPv6 Jumbo Frames � SG15 (GVA 29.04-10.05.02) Q11/15, Q8/11 2002-05-17
[ 5-WP2 ]
Liaison Statement- ATM-MPLS User Plane Interworking � SG13 WP2 (Chitose, Japan 8 July 2002) Q5/13, Q8/11 2002-07-24
[ 4-WP2 ]
Liaison Statement to SG11 - Voice Services over MPLS � SG13 (Chitose, Japan 8 July 2002) Q11/13, Q5/13, Q8/11 2002-09-30
[ 3-WP2 ]
Liaison Statement - An initial draft of Y.qosar (General QoS Reference Architecture for Packet Switched Network) � SG 13- WP2 (Chitose, Japan 8 July 2002) Q12/12, Q16/12, Q8/11, QF/16 2002-09-30
[ 2-WP2 ]
LIST OF WP2/11 SERIES TEMPORARY DOCUMENTS � TSB QALL/11 2002-10-28
[ 1-WP2 ]
Proposed Opening WP2/11 Plenary Agenda � WP2/11 Chairperson (G. Ratta) Q6/11, Q7/11, Q8/11, Q9/11 2002-11-07
Resultados :45 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-2-4