|
Formato |
Tama�o |
Puesta a disposici�n |
|
|
|
English |
Word
�
|
1197936 octetos |
2024-11-20 |
[48]�Annex 6- Working document towards a preliminary draft revision of Report ITU-R SM.2353-0 - Challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands |
|
Word
�
|
1055010 octetos |
2024-11-19 |
[48]�Annex 5- Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems |
|
Word
�
|
476723 octetos |
2024-11-19 |
[48]�Annex 4- Working document towards a preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices |
|
Word
�
|
54488 octetos |
2024-11-19 |
[48]�Annex 3- Working document towards a preliminary draft revisions of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices |
|
Word
�
|
1233162 octetos |
2024-11-19 |
[48]�Annex 2- Preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability |
|
Word
�
|
1395040 octetos |
2024-11-27 |
[48]�Annex 1 Revision 1- Preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management |
|
Word
�
|
54235 octetos |
2024-11-21 |
[48]�- Report of the second 2023-2024 meeting of Working Party 1B (Geneva, 5-8 November 2024) |
|
|