Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 53 ]
�
� |
Reply liaison statement to ITU-R Working Party 1B and ITU-T Study Groups 11, 17 and 20 (copy to ITU-R Working Party 1A) - Addition of the UWB abbreviation to the ITU Terms and Definitions database and request to provide a definition for this term
�
� |
CCT
� |
� |
2024-12-19 |
|
[ 52 ]
�
� |
Reply liaison statement to Working Party 1B (copy to Working Party 5B) - Studies related to revision on Recommendation ITU-R SM.1896-1 and Report ITU-R SM.2153-9
�
� |
WP 5A
� |
� |
2024-12-13 |
|
[ 51 ]
�
� |
Liaison statement to Working Parties 1B, 5C and 6A - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS]
�
� |
WP 5A
� |
� |
2024-12-11 |
|
[ 50 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI - ITU-D Study Group 1 Question 3/1 - The use of telecommunications/ICTs for disaster risk reduction and management
�
� |
ITU-D SG1 - Q3/1
� |
� |
2024-11-27 |
|
[ 49 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Working Party 1B on economic aspects of telecommunication/ICTs - ITU-D Study Group 1 Question 4/1: Economic aspects of national telecommunications/ICTs
�
� |
ITU-D SG1 Q4/1
� |
� |
2024-11-18 |
|
[ 48 ]
�
+Ann.2-6� |
Report on the second 2023-2027 meeting of Working Party 1B (Geneva, 5-8 November 2024)
�
� |
Chair, WP 1B
� |
� |
2024-11-08 |
|
[ 47 ]
�
� |
Final list of participants - Working Party 1B (Geneva, 5-8 November 2024)
�
� |
Director, BR
� |
� |
2024-11-08 |
|
[ 46 ]
�
� |
List of documents issued (Documents 1B/33 - 1B/46)
�
� |
BR, Study Groups Department
� |
� |
2024-11-04 |
|
[ 45 ]
�
� |
Spectrum utilization efficiency data collection (Information document)
�
� |
Brazil
� |
Q241/1
� |
2024-10-24 |
|
[ 44 ]
�
� |
Spectrum grid for determining spectrum availability and economy
�
� |
Indonesia
� |
� |
2024-10-23 |
|
[ 43 ]
�
� |
Proposed revision of Report ITU-R SM.2353-0 - The challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands
�
� |
Japan
� |
� |
2024-10-22 |
|
[ 42 ]
�
� |
Proposed draft liaison statement to CCT - UWB Abbreviation and Definition in the ITU-R recommendations and reports
�
� |
Korea (Rep. of)
� |
� |
2024-10-22 |
|
[ 41 ]
�
� |
Proposed draft new ITU-R Question - Guidance on the use of radio spectrum for new radio systems in the presence of incumbents
�
� |
Korea (Rep. of)
� |
� |
2024-10-22 |
|
[ 40 ]
�
� |
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability
�
� |
Korea (Rep. of)
� |
Q241/1
� |
2024-10-22 |
|
[ 39 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems
�
� |
Korea (Rep. of)
� |
� |
2024-10-22 |
|
[ 38 ]
�
� |
Working document towards a preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short-range devices
�
� |
United States
� |
� |
2024-10-21 |
|
[ 37 ]
�
(Rev.1)� |
Proposal for preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management
�
� |
China
� |
� |
2024-10-21 |
|
[ 36 ]
�
� |
Proposals for preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY]
�
� |
China
� |
� |
2024-10-21 |
|
[ 35 ]
�
� |
Liaison statement on creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators
�
� |
ITU-T SG3
� |
� |
2024-07-19 |
|
[ 34 ]
�
� |
Information on the preparation of texts for the draft CPM Report to WRC-27
�
� |
Chair, CPM-27
� |
� |
2024-07-09 |
|
[ 33 ]
�
+Ann.1-10� |
Report on the first 2023-2027 meeting of Working Party 1B (Geneva, 12-19 June 2024)
�
� |
Chair, WP 1B
� |
� |
2024-06-18 |
|
[ 32 ]
�
� |
Final list of participants - Working Party 1B (Geneva, 12-19 June 2024)
�
� |
Director, BR
� |
� |
2024-06-18 |
|
[ 31 ]
�
� |
List of documents issued (Documents 1B/1 - 1B/31)
�
� |
BR, Study Groups Department
� |
� |
2024-06-12 |
|
[ 30 ]
�
� |
Consideration of Document 1B/22 by Working Party 1A - Preliminary draft new Question ITU-R [UWB]/1
�
� |
Acting Chairs, WPs 1A and 1B
� |
� |
2024-06-12 |
|
[ 29 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15
�
� |
WP 3J
� |
AI1.15
� |
2024-06-12 |
|
[ 28 ]
�
� |
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C AND 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
�
� |
WPs 3K & 3M
� |
AI1.7
� |
2024-06-10 |
|
[ 27 ]
�
� |
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 4A, 4C, 5A, 5B and 5D for information) - WRC-27 agenda items 1.16
�
� |
WPs 3J & 3M
� |
AI1.16
� |
2024-06-10 |
|
[ 26 ]
�
� |
Report of the Correspondence Group to further work on the working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ]
�
� |
Co-Chairs, CG GPR/WPR
� |
� |
2024-06-05 |
|
[ 25 ]
�
� |
Proposed modification to the working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management
�
� |
India
� |
� |
2024-05-31 |
|
[ 24 ]
�
� |
Working document towards a preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices
�
� |
Netherlands (Kingdom of the)
� |
� |
2024-05-29 |
|
[ 23 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices
�
� |
Netherlands (Kingdom of the)
� |
� |
2024-05-29 |
|
[ 22 ]
�
� |
Preliminary draft new Question ITU-R [UWB]/1
�
� |
Germany
,
Austria
,
Finland
,
Hungary
,
Latvia
,
Netherlands (Kingdom of the)
,
Romania
,
Switzerland
� |
� |
2024-05-29 |
|
[ 21 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15
�
� |
WP 5C
� |
AI1.15
� |
2024-05-29 |
|
[ 20 ]
�
� |
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7
�
� |
WP 5C
� |
AI1.7
� |
2024-05-29 |
|
[ 19 ]
�
� |
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability
�
� |
Korea (Rep. of)
� |
Q241/1
� |
2024-05-29 |
|
[ 18 ]
�
� |
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5C, 7B, 7C, 7D and ICAO) - Relevant technical information for sharing studies under WRC-27 agenda item 1.7
�
� |
WP 5B
� |
AI1.7
� |
2024-05-28 |
|
[ 17 ]
�
� |
Editorial revision and update of Report ITU-R SM.2353 - The challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands
�
� |
United States
� |
� |
2024-05-24 |
|
[ 16 ]
�
� |
Liaison statement on implementation of WTDC Resolution 9 (Rev. Kigali, 2022) for digital skills and human hazards - ITU-D Study Group 2 Question 5/2: Adoption of telecommunications/ICTs and improving digital skills - ITU-D Study Group 2 Question 7/2: Strategies and policies concerning human exposure to electromagnetic fields
�
� |
ITU-D SG2
� |
� |
2024-05-24 |
|
[ 15 ]
�
� |
Proposal for working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management
�
� |
China
� |
� |
2024-05-23 |
|
[ 14 ]
�
� |
Liaison statement to Working Party 4C (copy to Working Party 1B for information) - Relevant technical and operational information to support studies under
WRC-27 agenda item 1.5
�
� |
WP 4A
� |
AI1.5
� |
2024-05-14 |
|
[ 13 ]
�
� |
Liaison statement to ITU-R Working Party 1B on mutual activities - Economic aspects of telecommunication/ICTs
�
� |
ITU-D SG1 Q4/1
� |
� |
2024-05-07 |
|
[ 12 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
�
� |
Chair, CCV
� |
� |
2024-04-22 |
|
[ 11 ]
�
� |
Liaison statement to Working Parties 4A, 4C and 5A (copy to Working Parties 1B, 3J, 3M, 5B and 5D for information) - WRC-27 agenda item 1.16
�
� |
WP 7D
� |
AI1.16
� |
2024-03-28 |
|
[ 10 ]
�
� |
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 1B, 4A, 4C, 5A, 5B, and 5D for information) on WRC-27 agenda items 1.16 and 1.18
�
� |
WP 7D
� |
AI1.18, AI1.16
� |
2024-03-28 |
|
[ 9 ]
�
� |
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15
�
� |
WP 7B
� |
AI1.15
� |
2024-03-27 |
|
[ 8 ]
�
� |
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7
�
� |
WP 7B
� |
AI1.7
� |
2024-03-27 |
|
[ 7 ]
�
� |
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7
�
� |
WP 7C
� |
AI1.7
� |
2024-03-25 |
|
[ 6 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6
�
� |
WP 6A
� |
AI1.6
� |
2024-03-18 |
|
[ 5 ]
�
� |
Preliminary position on WRC-27 agenda
�
� |
WMO
� |
� |
2024-03-06 |
|
[ 4 ]
�
� |
Liaison statement to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.7
�
� |
WP 5D
� |
AI1.7
� |
2024-02-13 |
Resultados :53 documentos Resultados :�
1 -
2
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):