Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP-7D : Contribuciones : 244 Nuevo�-� Busque los documentos de la reuni�n
[244]� Report of the meeting of Working Party 7D (Geneva, 5-11 October 2023)

Formato

Tama�o

Puesta a disposici�n

English

Word

40042 octetos 2023-10-19 [244]�Annex 11- List of output (Temp) documents (Documents 7D/TEMP/79 - 7D/TEMP/93)

Word

2918718 octetos 2023-10-17 [244]�Annex 10- Preliminary draft new Report ITU-R RA.[HARMONICS] - Harmonics-related unwanted emissions in radio astronomy bands: measurement of impacts of harmonic emission at radio astronomy facilities

Word

5610688 octetos 2023-10-17 [244]�Annex 9- Preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ] - Methodology for the coordination of IMT systems and stations of the radio astronomy service operating in the frequency band 42.5-43.5 GHz

Word

51791 octetos 2023-10-17 [244]�Annex 8- Working document towards a preliminary draft revision of Report ITU-R RA.2188-1 - Power flux-density and e.i.r.p. levels potentially damaging to radio astronomy receivers

Word

56406 octetos 2023-10-17 [244]�Annex 7- Working document towards a preliminary draft new Recommendation ITU-R RA.[GEOVLBI] - Guidance to Administrations regarding Geodetic Very Long Baseline Interferometry Networks

Word

6154255 octetos 2023-10-16 [244]�Annex 6- Working document towards a preliminary draft new Report ITU-R RA.[UEMR] - Unintended electromagnetic radiation from space systems into RAS frequency bands

Word

116450 octetos 2023-10-16 [244]�Annex 5- Working document towards preliminary draft new Report ITU-R RA.[RECEIVER-RESILIENCE] - Resilience of Radio Astronomy Receivers

Word

332748 octetos 2023-10-16 [244]�Annex 4- Working document towards a preliminary draft new Report ITU-R RA.[SZM] - Radio astronomy facilities on the Moon

Word

31078 octetos 2023-10-16 [244]�Annex 3- Working document towards a preliminary draft new ITU-R Report: sharing above 71 GHz in response to Resolution 731 (Rev.WRC-19)

Word

31736 octetos 2023-10-13 [244]�Annex 2- Elements for use in studies between the radio astronomy service (RAS) and active services above 71 GHz, and meta-analysis of the studies�

Word

40616 octetos 2023-10-16 [244]�Annex 1- Working document towards a preliminary draft new Report ITU-R RA.[RAS 6-7 GHZ] - RAS in the band 6-7 GHz

Word

85073 octetos 2023-11-12 [244]�- Report on the October 2023 meeting of Working Party 7D (Geneva with Online Participation, 5-11 October 2023)

Documento :

UIT-R�WP-7D� Contribuci�n� 244

T�tulo :

Report of the meeting of Working Party 7D (Geneva, 5-11 October 2023)

Recibido en :

2023-10-11

Origen :

Chairman, WP 7D

Disponibilidad :

Restringido a usuarios de TIES�[UIT-R]

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2023-11-12