Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 165 ]
�
� |
Liaison statement on request to provide the standardization status for metaverse-related technologies
�
� |
ITU-T FG-MV
� |
� |
2023-10-19 |
|
[ 164 ]
�
� |
Reply liaison statement to CISPR/H (copy for information or action to Working Parties 4A and 7D on Question 6) (copy for information to Study Group 1 and Working Parties 1A and 5A)
�
� |
WP 6A
� |
� |
2023-09-11 |
|
[ 163 ]
�
� |
Note to the Chairmen of Working Parties 4A and 7D (copy to the Chairmen of Study Group 1 and Working Party 1A)
�
� |
Chairman, WP 6A
� |
� |
2023-06-14 |
|
[ 162 ]
�
+Corr.1� |
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 5-6 June 2023)
�
� |
Chairman, SG 1
� |
� |
2023-06-06 |
|
[ 161 ]
�
� |
Final list of participants - Study Group 1 (Geneva, 5-6 June 2023)
�
� |
Director, BR
� |
� |
2023-06-06 |
|
[ 160 ]
�
� |
List of documents issued (Documents 1/112-1/160)
�
� |
BR, Study Groups Department
� |
� |
2023-06-05 |
|
[ 159 ]
�
� |
Preliminary draft of the Study Group 1 Chairman's Report to RA-23 - Spectrum management
�
� |
Chairman, SG 1
� |
� |
2023-06-05 |
|
[ 158 ]
�
(Rev.1)� |
Revision of Report ITU R SM.2048-0 - Use of the x dB bandwidth criterion for determination of spectral properties of a transmitter in the out-of-band domain
�
� |
WP 1A
� |
� |
2023-06-02 |
|
[ 157 ]
�
(Rev.1)� |
Editorial revision of Recommendations assigned to ITU-R Working Party 1A
�
� |
WP 1A
� |
� |
2023-06-02 |
|
[ 156 ]
�
(Rev.1)� |
Revision of Report ITU-R SM.2303-3 - Wireless power transmission using technologies other than radio frequency beam
�
� |
WP 1A
� |
� |
2023-06-02 |
|
[ 155 ]
�
� |
Executive Report on the May - June 2023 meeting of Working Party 1A (29 May - 2 June 2023)
�
� |
Chairman, WP 1A
� |
� |
2023-06-02 |
|
[ 154 ]
�
� |
Executive Report on Working Party 1B meeting (Meeting in Thessaloniki from 29 May to 2 June 2023)
�
� |
Chairman, WP 1B
� |
� |
2023-06-02 |
|
[ 153 ]
�
(Rev.1)� |
Revision of Report ITU-R SM.2179-1 - Short-range radiocommunication devices measurements
�
� |
WP 1C
� |
� |
2023-06-02 |
|
[ 152 ]
�
(Rev.1)� |
Editorial revision of one Report assigned to Working Party 1C
�
� |
WP 1C
� |
� |
2023-06-02 |
|
[ 151 ]
�
(Rev.1)� |
Revision of Report ITU-R SM.2454-0 - Spectrum monitoring techniques in the radionavigation-satellite service frequency bands
�
� |
WP 1C
� |
� |
2023-06-02 |
|
[ 150 ]
�
(Rev.1)� |
Editorial revision of eight Recommendations assigned to Working Party 1C
�
� |
WP 1C
� |
� |
2023-06-02 |
|
[ 149 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SM.1838-0 - Test procedure for measuring the noise figure of radio monitoring receivers
�
� |
WP 1C
� |
� |
2023-06-02 |
|
[ 148 ]
�
� |
Draft revision of Report ITU-R SM.2486-0 - Use of commercial drones for ITU-R spectrum monitoring tasks
�
� |
WP 1C
� |
� |
2023-06-02 |
|
[ 147 ]
�
(Rev.1)� |
Revision of Report ITU-R SM.2355-1 - Spectrum monitoring evolution
�
� |
WP 1C
� |
� |
2023-06-02 |
|
[ 146 ]
�
(Rev.1)� |
Revision of Report ITU-R SM.2257-6 - Spectrum management and monitoring during major events
�
� |
WP 1C
� |
� |
2023-06-02 |
|
[ 145 ]
�
(Rev.1)� |
Revision of Report ITU-R SM.2182-2 - Measurement facilities available for the measurement of emissions from both GSO and non-GSO space stations
�
� |
WP 1C
� |
� |
2023-06-02 |
|
[ 144 ]
�
� |
Preliminary draft revision of ITU-R Resolutions
�
� |
WP 1B
� |
� |
2023-06-02 |
|
[ 143 ]
�
(Rev.1)� |
Editorial revision of six Recommendations assigned to ITU-R Working Party 1B
�
� |
WP 1B
� |
� |
2023-06-02 |
|
[ 142 ]
�
� |
Liaison statement to ITU-R Study Group 1 - Further development of the Spectrum Management System for Developing Countries
�
� |
SG 3
� |
� |
2023-06-02 |
|
[ 141 ]
�
� |
Executive Report to Study Group 1 (Working Party 1C meeting in Thessaloniki, Greece, from 29 May to 2 June 2023)
�
� |
Chairman, WP 1C
� |
� |
2023-06-02 |
|
[ 140 ]
�
(Rev.1)� |
New Report ITU-R SM.2523-0 - Assessment of Spectrum efficiency and economic value
�
� |
WP 1B
� |
� |
2023-06-02 |
|
[ 139 ]
�
(Rev.1)� |
Editorial revision to Recommendation ITU-R SM.1756-0 - Framework for the introduction of devices using ultra-wideband technology
�
� |
WP 1B
� |
� |
2023-06-02 |
|
[ 138 ]
�
(Rev.1)� |
Editorial revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices
�
� |
WP 1B
� |
� |
2023-06-02 |
|
[ 137 ]
�
� |
Liaison statement to the Coordination Committee for Terminology (CCT) (copy to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D, and Study Group 1 for information) - Proposed revision of Recommendation ITU-R V.431-8
�
� |
WPs 3J, 3K & 3M
� |
� |
2023-06-02 |
|
[ 136 ]
�
� |
Liaison statement to ITU-T Study Groups 16 and 20, ITU-R SG 1 and Working Parties 1B, 5A and 5D (copy to ITU-T SGs 2, 3, 5, 9, 13, and ITU-R WPs 1C, 4A, 5B, 5C, 6A, 7B) on question of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022) for e-services including e-health and e-education
�
� |
ITU-D SG2
� |
� |
2023-05-31 |
|
[ 135 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 and ITU-R Study Group 1 (copy to ITU-R Working Parties 1C, 4A, 5A, 5B, 5C, 5D and 6A) on questions of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022) - ITU-D Study Group 2 Question 7/2: Strategies and policies concerning human exposure to electromagnetic fields
�
� |
ITU-D SG2
� |
� |
2023-05-27 |
|
[ 134 ]
�
� |
Report of Correspondence group on editorial review and maintenance of ITU-R Recommendations, Reports and Questions assigned to the Study Group 1
�
� |
Chairman, SG 1 CG on editorial review
� |
� |
2023-05-26 |
|
[ 133 ]
�
(Rev.2)� |
Report on CISPR activities from June 2022 to May 2023 - On WPT and general issues
�
� |
SG 1 Rapp. to CISPR on WPT Issues
� |
� |
2023-05-26 |
|
[ 132 ]
�
� |
Draft reply liaison statement from Study Group 1 to the Coordination Committee for Terminology - Revising Recommendation ITU-R V.431-8
�
� |
ATDI
� |
� |
2023-05-25 |
|
[ 131 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Study Group 1 and Working Party 1B on the questions of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022)
�
� |
ITU-D SG1
� |
� |
2023-05-23 |
|
[ 130 ]
�
� |
Editorial revisions of ITU-R SM-series Recommendations that cite CISPR publications
�
� |
SG 1 Rapp. to CISPR
� |
� |
2023-05-22 |
|
[ 129 ]
�
� |
Liaison statement on the new version of the Home Network Transport (HNT) Standards Overview and Work plan
�
� |
ITU-T SG15
� |
� |
2023-05-04 |
|
[ 128 ]
�
� |
Liaison statement on the new version of the Access Network Transport (ANT) Standards Overview and Work plan
�
� |
ITU-T SG15
� |
� |
2023-05-04 |
|
[ 127 ]
�
� |
Liaison response from International Special Committee on Radio Interference - CISPR/H to ITU-R Working Party 6A (copy to ITU-R Study Group 1 and Working Party 1A for information)
�
� |
International Special Committee on Radio Interference
� |
� |
2023-04-28 |
|
[ 126 ]
�
� |
WTDC Resolution 9 (Rev. Kigali, 2022) implementation ITU-R and ITU-D collaboration - Participation of countries, particularly developing countries, in spectrum management
�
� |
Kenya (Republic of)
,
ATDI
� |
� |
2023-04-21 |
|
[ 125 ]
�
� |
Liaison statement to ITU-T Study Group 5, ITU-D Study Group 2 and ITU-R Study Group 1 - Revision of Recommendation ITU-R BS.1698
�
� |
WP 6A
� |
� |
2023-03-21 |
|
[ 124 ]
�
� |
Recommendation ITU-R M.1732-3 - Characteristics of systems operating in the amateur and amateur-satellite services for use in sharing studies
�
� |
SG 5
� |
� |
2023-02-23 |
|
[ 123 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 6/2 to ITU-T Study Groups 5 and 20, and ITU-R Study Groups 1, 4, 6 and 7 on new Question 6/2 and collaboration
�
� |
ITU-D SG2
� |
� |
2022-12-21 |
|
[ 122 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 6/1 to ITU-R Study Group 1 and Working Party 1B on consumer information, protection and rights
�
� |
ITU-D SG1
� |
� |
2022-12-20 |
|
[ 121 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 1 on collaboration
�
� |
ITU-D SG1
� |
� |
2022-12-20 |
|
[ 120 ]
�
� |
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol THF
�
� |
WP 5C
� |
� |
2022-11-30 |
|
[ 119 ]
�
� |
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5C, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations
�
� |
WP 5A
� |
� |
2022-11-28 |
|
[ 118 ]
�
� |
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5C, 6A and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations
�
� |
WP 5D
� |
� |
2022-10-28 |
|
[ 117 ]
�
� |
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan
�
� |
ITU-T SG15
� |
� |
2022-10-14 |
|
[ 116 ]
�
� |
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan
�
� |
ITU-T SG15
� |
� |
2022-10-14 |
Resultados :165 documentos Resultados :�
1 -
2 -
3 -
4
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):