Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP5C : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP5C� C�

UIT-R�WP5C

Sistemas fijos inal�mbricos; sistemas por ondas decam�tricas y otros sistemas por debajo de 30 MHz en los servicios fijo y m�vil terrestre

Resultados :35 documentos
Contribuciones �[�Origen:�WP 5A�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 650 ]
Liaison statement to ITU-R Working Party 4A (copy for information to Working Party 5C) - Recommendation ITU-R M.[MS-RXCHAR-28] � WP 5A 2019-05-15
[ 649 ]
Reply liaison statemen to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems � WP 5A 2019-05-13
[ 619 ]
Reply liaison statement to ITU-R Working Party 1A and the Rapporteur Group on the coexistence of wired telecommunication with radiocommunication systems (copy to Working Parties 5C and 5D) (copy for information to Working Parties 5B, 6A, 7A, 7B, 7C, 7D and ITU-T SG 15) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility Management Systems � WP 5A 2018-11-20
[ 618 ]
Liaison statement to Working Parties 5B, 5C and 6A - Progress report on WRC-19 agenda item 1.1 sharing and compatibility studies � WP 5A 2018-11-20
[ 534 ]
Liaison statement to Working Party 6A (copied for information to Working Parties 3K, 3M, 5B and 5C) - Updated on work towards WRC-19 agenda item1.1 � WP 5A 2018-06-06
[ 532 ]
Reply liaison statement to ITU-R Working Party 4A (copy for information to Working Party 5C) - Studies relating to the use of the frequency bands 17.7-19.7 GHz (space-to-Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service under WRC-19 agenda item 1.5 � WP 5A 2018-06-01
[ 530 ]
Reply liaison statement to ITU-R Working Party 5C (copy for information to Working Parties 3M, 4A, 4C, 5B, 5D, 7B, 7C, 7D and Task Group 5/1) - WRC-19 agenda item 1.14 � WP 5A AI1.14 2018-05-25
[ 529 ]
Liaison statement to Working Party 5B (copy for information to Working Parties 5C, 7B and 7C) - Technical and operational characteristics of conventional and trunked land mobile systems operating in the mobile service allocations below 869 MHz to be used in sharing studies � WP 5A 2018-05-25
[ 527 ]
Reply liaison statement to Working Party 5C - Revision of Recommendation ITU-R F.1105-3 - Fixed wireless systems for disaster mitigation and relief operations � WP 5A 2018-05-25
[ 420 ]
Liaison statement to Working Parties 3K, 3M, 5B, 5C and 6A - Progress report on WRC-19 agenda item 1.1 sharing and compatibility studies � WP 5A AI1.1 2017-11-22
[ 418 ]
Reply liaison statement to Working Party 7C (copied to Working Parties 5B and 5C for information) - Technical and operational characteristics for the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2) � WP 5A AI2.2 2017-11-21
[ 413 ]
Reply liaison statement to Working Party 1A (copied to Working Parties 5B, 5C and 5D for information) - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services � WP 5A 2017-11-17
[ 412 ]
Reply liaison statement to ITU-R Working Party 1A (copy for information to Working Parties 5C, 7C and 7D) - WRC-19 agenda item 1.15 � WP 5A AI1.15 2017-11-17
[ 408 ]
Liaison statement to Working Party 5B (copied to Working Party 5C for information) - Interference criteria of conventional and trunked land mobile systems to be used in sharing studies for WRC-19 agenda item 1.9.2 � WP 5A AI1.9 2017-11-13
[ 407 ]
Liaison statement to Working Party 5C - Update receiver characteristics of systems in the land mobile service for use in sharing and compatibility studies for WRC-19 agenda item 1.14 (HAPS) � WP 5A AI1.14 2017-11-13
[ 297 ]
Liaison statement to Working Parties 1A and 7C (copy to Working Parties 5C and 7D for information) - WRC-19 agenda item 1.15 � WP 5A AI1.15 2017-06-05
[ 296 ]
Reply liaison statement to ITU-R Working Party 5C - Progress on WRC-19 agenda item 1.1 � WP 5A 2017-06-05
[ 295 ]
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copy to Working Parties 4A, 4C, 5C and 5D) - Regulatory tools to support enhanced shared use of the spectrum � WP 5A 2017-06-05
[ 294 ]
Liaison statement to Working Party 4C (copy for information to Working Party 5C) - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz � WP 5A 2017-06-05
[ 184 ]
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 agenda item 1.13 � WP 5A AI1.13 2016-11-23
[ 183 ]
Liaison statement to Working Party 5C - WRC-19 agenda item 1.14 � WP 5A AI1.14 2016-11-23
[ 182 ]
Liaison statement to Working Party 7C (copied to Working Parties 3L, 5B, 5C and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range � WP 5A 2016-11-23
[ 181 ]
Liaison statement to Working Party 4A (copy to Working Parties 5C and 5D for information) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA] � WP 5A 2016-11-23
[ 180 ]
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5C, 5D and 7D for information) - Operational requirements and technical characteristics of systems in the frequency band 51.4-52.4 GHz � WP 5A 2016-11-23
[ 176 ]
Liaison statement to BWA External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15 � WP 5A AI1.15 2016-11-18
[ 175 ]
Liaison statement to Working Parties 1A and 1B (copy for information to Working Parties 4A, 4C, 5B, 5C, 5D and 7C) - Sharing schemes in the land mobile service on the basis of geographical use � WP 5A 2016-11-18
[ 174 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15 � WP 5A AI1.15 2016-11-18
[ 71 ]
Liaison statement to Working Parties 4A, 4C, 5B and 5C (copied for information to Working parties 1B, 3J, 3K, 3M and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16 � WP 5A AI1.16 2016-05-25
[ 70 ]
Reply liaison statement to Working Party 6B on Global Platform for the Broadcasting Service (copy for information to ITU-R WPs 4A, 4B and 5B, 5C, 5D, ITU-T SGs 9 and 16) � WP 5A 2016-05-25
[ 69 ]
Liaison statement to Working Party 4A (copied to Working Parties 5B, 5C and 5D for information) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA] � WP 5A 2016-05-25
[ 68 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7 � WP 5A AI1.7 2016-05-25
[ 67 ]
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 4C, 5B, 5C, 5D and 6A) - Technical characteristics for WRC-19 agenda item 1.3 � WP 5A AI1.3 2016-05-25
[ 66 ]
Liaison statement to Working Parties 1A, 1B, 4A, 5B, 5C and 5D - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications � WP 5A 2016-05-25
[ 65 ]
Liaison statement to Working Party 6A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda 1.1 � WP 5A AI1.1 2016-05-25
[ 64 ]
Reply liaison statement to Working Party 1A (copy for information to Working Parties 1B, 5B 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 5A 2016-05-25
Resultados :35 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2025-1-9