Contribuciones
�[�Origen:�WP 7D�]� ��
�
N�mero �
T�tulo
Origen
AI/Cuesti�n
Filtro...
210-3/1
AI1.6
AI1.8
AI1.9
AI1.9.1
AI1.9.2
AI9.1
Borrar filtro
Fecha
�
[ 714 ]
�
�
Reply liaison statement to Working Party 5B - Completion towards a Preliminary Draft New Report ITU-R RA.[COEXISTENCE]
�
�
WP 7D
�
�
2019-05-31
�
[ 569 ]
�
�
Liaison statement to Working Party 5B - Proposal for modification of working document towards a preliminary draft new Recommendation ITU-R M.[AMRD] - WRC-19 agenda item 1.9.1
�
�
WP 7D
�
AI1.9.1
�
2018-09-25
�
[ 531 ]
�
(Rev.1) �
Reply liaison statement to Working Party 4A (copy to Working Parties 5B, 5C, 5D, 6A, 7B, 7C for information - Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz adjacent band studies] - Protection of EESS (passive) and RAS systems for non-GSO fixed satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands
�
�
WP 7D
�
�
2018-06-22
�
[ 529 ]
�
�
Reply liaison statement to Working Party 5B (copy to Working Parties 5A and 7C) Foreign Object Debris detection system operating in the band 92-100 GHz
�
�
WP 7D
�
�
2018-05-18
�
[ 528 ]
�
�
Reply liaison statement to Working Party 5A (copied to Working Parties 5B and 7C for information) - Coexistence between high-speed railway radiocommunication system between train and trackside operating in the frequency bands 92-94 GHz, 94.1-100 GHz and 102-109.5 GHz, and active and passive services
�
�
WP 7D
�
�
2018-05-18
�
[ 527 ]
�
�
Reply liaison statement to Working Party 5B on avoiding interference to the RAS by harmonics of satellite downlink emissions - WRC-19 agenda item 1.9.2
�
�
WP 7D
�
AI1.9.2
�
2018-05-18
�
[ 375 ]
�
�
Liaison statement to Working Party 4C and 5B - Unwanted emissions in the RAS band from space-to-Earth transmissions from MSS satellites
�
�
WP 7D
�
AI1.8
�
2017-10-30
�
[ 374 ]
�
�
Reply liaison statement to Working Party 5B (copy to Working Parties 5A, 7C) - Foreign Object Debris (FOD) detection system operating in the band 92-100 GHz
�
�
WP 7D
�
�
2017-10-30
�
[ 373 ]
�
�
Liaison statement to Working Party 5B on avoiding interference to the RAS by harmonics of satellite downlink emissions (copy for information to Working Party 4C) - WRC-19 agenda item 1.9.2
�
�
WP 7D
�
AI1.9.2
�
2017-10-30
�
[ 229 ]
�
�
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services
�
�
WP 7D
�
�
2017-04-07
�
[ 228 ]
�
�
Liaison statement to Working Party 1B (copy to Working Parties 1A, 5B, 5C, 6A and 7A for information) - Studies on "Wireless power transmission (WPT)"
�
�
WP 7D
�
AI1.9
�
2017-04-07
�
[ 177 ]
�
�
Reply liaison statement to Working Party 5B regarding technical characteristics for WRC-19 agenda item 1.9.2 (copy to Working Party 1A for information)
�
�
WP 7D
�
�
2016-11-01
�
[ 176 ]
�
�
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 5C, 5D, 6A and 7C) - WRC-19 agenda items 1.6 and 9.1, issue 9.1.9
�
�
WP 7D
�
AI9.1 , AI1.6
�
2016-11-01
�
[ 175 ]
�
�
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
�
�
WP 7D
�
210-3/1
�
2016-11-01
�
[ 174 ]
�
�
Liaison statement to Working Party 5D (copy to Working Parties 5A, 5B, 5C for information) - IMT co-existence and adjacent studies in the frequency bands 3 300-3 400 MHz and 4 800-4 990 MHz - Technical characteristics and compatibility study results for the radio astronomy service
�
�
WP 7D
�
�
2016-11-01
�
[ 25 ]
�
�
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
�
�
WP 7D
�
210-3/1
�
2016-04-13
�
[ 19 ]
�
�
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information)
�
�
WP 7D
�
�
2016-04-11
�
[ 18 ]
�
�
Liaison statement to Working Parties 4C and 5B (copy to the Joint IMO/ITU Experts Group) - Compatibility of the radio astronomy service with satellite-provided global maritime distress and safety systems (WRC-19 AI 1.8)
�
�
WP 7D
�
AI1.8
�
2016-04-08
Resultados :18 documentos
�
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):