Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP1C : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP1C� C�

UIT-R�WP1C

Comprobaci�n T�cnica del Espectro

Resultados :233 documentos
Resultados :� 1 - 2 - 3 - 4 - 5 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 233 ]
Liaison statement on work being carried out under study in ITU-T Q3/5 � ITU-T SG 5 2019-10-15
[ 232 ]
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Parties 1A, 1B and 1C on collaboration - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services � ITU-D SG 1 2019-10-02
[ 231 ]
Liaison statement to Working Party 1C - Development of a new Report ITU-R SM.2454-0 � WP 4C 2019-07-17
[ 230 ]
Reply liaison statement to Working Party 7C (copy to ITU-R Working Parties 1C, 4A, 4B and 7D) - Interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors � WP 1A 2019-06-18
[ 229 ]
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise � WP 1A 2019-06-18
[ 228 ]
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reported cases of interference � WP 1A 2019-06-18
[ 227 ]
Liaison statement on working being carried out under study in ITU-T Study Group 5 Question 3/5 � ITU-T SG 5 2019-06-14
[ 226 ]
+Ann.1-14
Report of the meeting of Working Party 1C (Geneva, 28 May - 5 June 2019) � Chairman, WP 1C 2019-06-05
[ 225 ]
Final list of participants - Working Party 1C (Geneva, 28 May - 5 June 2019) � Director, BR 2019-06-05
[ 224 ]
Reply liaison statement to Working Party 1A (copy to ITU-R WP 1C, 4A, 4B and 7D) - Interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors � WP 7C 2019-05-31
[ 223 ]
List of documents issued (Documents 1C/169 - 1C/223) � BR Study Groups Department 2019-05-27
[ 222 ]
Proposal for revisions to preliminary draft new Recommendation ITU-R SM.[TDOA-ACC] - Test procedure for measuring geolocation accuracy of TDOA emitter location systems � Rohde & Schwarz GmbH & Co. KG Q240/1 2019-05-21
[ 221 ]
(Rev.1)
Proposed new Annex 9 to include space radio monitoring station in Sultanate of Oman in the scope of Report ITU-R SM.2182 � Oman (Sultanate of) 2019-05-21
[ 220 ]
Report of Correspondence Group activities on the revision of Recommendation ITU-R SM.1392-2 on essential requirements for a spectrum monitoring system for developing countries � Chairman, CG on Rec. ITU-R SM.1392-2 2019-05-21
[ 219 ]
Revision of Report ITU-R SM.2257-4 - Addition of result for spectrum management and monitoring during 2018 PyeongChang Winter Olympic and Paralympic Games � Korea (Republic of) 2019-05-21
[ 218 ]
Method for the identification and the measurement of interference caused by indoor man-made noise in VHF band II and band III (contribution to ITU-R Working Party 1C with copy to Working Party 3L) � European Broadcasting Union 2019-05-21
[ 217 ]
Key parameters for FHSS signal monitoring � China (People's Republic of) 2019-05-21
[ 216 ]
Analysis of cuboid spectrum data of Internet based spectrum monitoring system � China (People's Republic of) 2019-05-21
[ 215 ]
Working document towards a preliminary draft new Report and Recommendation - Use of small satellites for Spectrum Monitoring � China (People's Republic of) 2019-05-21
[ 214 ] �
This document has been withdrawn � Chairman, CG on Spectrum Monitoring Evolution 2019-05-27
[ 213 ]
Activity Report of the Correspondence Group on preliminary draft new Recommendation on field strength measurement accuracy - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range � Chairman, CG on Field Strength Measurement Accu. 2019-05-21
[ 212 ]
Proposal for a new Recommendation on test procedures for measuring accuracy of TDOA-based emitter location systems - Test procedures for measuring geolocation accuracy � CG on Geolocation accuracy 2019-05-21
[ 211 ]
Working document towards a preliminary draft new Recommendation ITU-R SM.[APP10] - Reporting Harmful Interference in support of Appendix 10 of the Radio Regulations � China (People's Republic of) Q232/1 2019-05-21
[ 210 ]
Proposed working document regarding a possible modification of preliminary draft new Report ITU-R SM.[EMF-MON] - Methodology for measuring WiFi exposure levels and description of the procedure for establishing the optimal frequency domain configuration of the measuring equipment � Universidad Del Pa�s Vasco Q239/1 2019-05-21
[ 209 ]
Proposals towards developing new version of the ITU Spectrum Monitoring Handbook � Russian Federation 2019-05-20
[ 208 ]
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1875-2 - DVB T/T2 coverage measurements and comparison with coverage predictions � Russian Federation 2019-05-20
[ 207 ]
Proposed modification to the working document towards a preliminary draft new Recommendation ITU R SM.[FS-MEAS-ACC] - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range � Japan 2019-05-20
[ 206 ]
Proposed editorial revision of thirty one Recommendations assigned to ITU-R Working Party 1C � Chairman, SG 1 CG on editorial review 2019-05-17
[ 205 ]
Comments for mandatory format to the ITU-R Recommendations assigned to ITU-R Working Party 1C � Chairman, SG 1 CG on editorial review 2019-05-17
[ 204 ]
Report of measurement results in support of the working document towards a preliminary draft new Recommendation ITU-R SM.[MOB DF PERF] - Performance evaluation of Mobile DF units in operational environment � Greece 2019-05-17
[ 203 ]
Proposal for revisions to preliminary draft new Recommendation ITU-R SM.[TDOA-ACC] - Test procedure for measuring geolocation accuracy of TDOA emitter location systems � United States of America Q210/1 2019-05-14
[ 202 ]
Working document towards a preliminary draft new Recommendation ITU-R SM.[MOB DF PERF] - Performance evaluation of mobile DF units in operational environment � Egypt (Arab Republic of) 2019-05-14
[ 201 ]
Activity Report - Electromagnetic field measurements to assess human exposure � Chairman, CG on Report ITU-R SM.[EMF-MON] Q239/1 2019-05-14
[ 200 ]
Draft new Report ITU-R SM.[EMF-MON] - Electromagnetic field measurements to assess human exposure � ATDI Q239/1 2019-05-14
[ 199 ]
Report of the CG work after the 2018 meeting of SG 1 on a preliminary draft revision of Report ITU-R SM.2355-0 � Chairman, CG on Spectrum Monitoring Evolution 2019-05-13
[ 198 ]
Working document towards a preliminary draft new Report ITU-R SM.[POPULATION_COVERAGE] - Population coverage measurement with public wireless networks � Chairman, CG on Population Coverage 2019-05-13
[ 197 ]
Activity report of the Correspondence Group on developing a draft new Report on population coverage - Population coverage measurement with public wireless networks � Chairman, CG on Population Coverage 2019-05-13
[ 196 ]
Activity Report of the Correspondence Group on preliminary draft new recommendation on field strength measurement accuracy - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range � Chairman, CG on Field Strength Measurement Accu. 2019-05-10
[ 195 ]
Proposed modifications to the working document towards a preliminary draft new Recommendation ITU-R SM.[APP10] - Reporting Harmful Interference in support of Appendix 10 of the Radio Regulations � World Broadcasting Unions - Technical Committee 2019-05-07
[ 194 ]
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1875-2 - DVB T/T2 coverage measurements and comparison with coverage predictions � CG DVB-T Coverage 2019-05-03
[ 193 ]
Report of Correspondence Group activities on preliminary draft revision of Recommendation ITU-R SM.1875-2 on DVB-T/T2 Coverage measurements and verification of planning criteria � Chairman, CGon DVB-T Coverage Measurements 2019-05-03
[ 192 ]
Proposed draft revision of Recommendation ITU-R SM.1268-4 - Method of measuring the maximum frequency deviation of FM broadcast emissions at monitoring stations � Germany (Federal Republic of) 2019-05-03
[ 191 ]
Report on the activities of the Correspondence Group on radiomonitoring in the GNSS bands � Chairman, CG Meas-GNSS 2019-04-30
[ 190 ]
Liaison statement on strategies and policies concerning human exposure to EMF � ITU-D SG 2 2019-04-11
[ 189 ]
Reply liaison statement to ITU-R Working Parties 1A and 1C (copy to 3GPPRAN4/RAN5) - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas � WP 5D 2019-03-05
[ 188 ]
Liaison statement on ITU inter-Sector coordination � ITU-T TSAG 2018-12-17
[ 187 ]
Liaison statement to Working Party 3L (copy for information to Working Parties 1A, 1C, 5A, 5B, 6A, and 7A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) (Question ITU-R 210-3/1) � WP 1B AI9.1 2018-11-29
[ 186 ]
Proposed draft revision of Recommendation ITU-R SM.1054-0 - Monitoring of radio emissions from spacecraft at monitoring stations � Germany (Federal Republic of) 2018-11-27
[ 185 ]
Draft new Report ITU-R SM.[SAT MON COOPERATION] � Germany (Federal Republic of) 2018-11-27
[ 184 ]
Liaison statement to Working Parties 1C and 3L - Working document towards a preliminary draft new Report ITU-R M.[HF NOISE AT SEA] � WP 5B 2018-11-16
Resultados :233 documentos
Resultados :� 1 - 2 - 3 - 4 - 5 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2019-10-18