Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP1A : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP1A� C�

UIT-R�WP1A

T�cnicas de Ingenier�a

Resultados :11 documentos
Contribuciones �[�Origen:�WP 5D�]���Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 459 ]
Reply liaison statement to Working Party 1A - Characteristics of terrestrial IMT systems for studies on the impact of WPT-Beam on IMT systems � WP 5D 2019-07-22
[ 389 ]
Reply liaison statement to ITU-R Working Parties 1A and 1C (copy to 3GPPRAN4/RAN5 - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas � WP 5D 2019-03-05
[ 388 ]
Reply liaison statement to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on smart grid utility management systems � WP 5D 2019-03-05
[ 363 ]
Reply liaison statement to ITU-R Working Pary 1A (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart grid utility management systems � WP 5D 2018-10-23
[ 348 ]
Liaison statement to Working Parties 1A and 1C - Definition of and test methods for OTA unwanted emission of IMT radio equipment � WP 5D 2018-07-11
[ 265 ]
Response liaison statement to ITU-T Study Group 5 - Copy to ITU-R Study Group 1 - Considerations of EMC/EMI in relation to IMT � WP 5D 2018-02-13
[ 217 ]
Liaison statement to Working Party 1A on unwanted emissions of IMT-2020 systems utilizing active antenna systems (AAS) and total radiated power (copy to Working Party 1C for information) � WP 5D 2017-10-13
[ 151 ]
Reply liaison statement to ITU-R Working Party 1B (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means... � WP 5D 2017-02-24
[ 68 ]
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D Study period 2014-2017 (copied to ITU-R Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A for information) � WP 5D 2016-06-28
[ 67 ]
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7 � WP 5D AI1.7 2016-06-24
[ 10 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] � WP 5D 2016-03-09
Resultados :11 documentos
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2025-1-9