Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP7B : Contribuciones : 330 Nuevo�-� Busque los documentos de la reuni�n
[330]� Report of the October 2014 meeting of Working Party 7B with a view to its next meeting (May 2015) (Geneva, 1-7 October 2014)

Formato

Tama�o

Puesta a disposici�n

English

Word

43327 octetos 2014-10-16 [330]�Annex 08- Status of SA-Series Recommendations

Word

99842 octetos 2014-10-16 [330]�Annex 07- Preliminary draft new Report ITU-R SA.[NANO/PICOSAT CURRENT PRACTICE] - Current practice and procedures for notifying space networks currently applicable to nanosatellites and picosatellites

Word

306489 octetos 2014-10-16 [330]�Annex 06- Proposed modifications to Question ITU-R 254/7

Word

53094 octetos 2014-10-16 [330]�Annex 05- Proposed preliminary draft new Recommendation ITU-R SA.[SRS/FSS 37GHz] - Frequency sharing between SRS and FSS (space-to-Earth) systems in the 37.5-38 GHz band

Word

39511 octetos 2014-10-08 [330]�Annex 04- A note to the Chairman of Study Group 7 - Protection of SRS earth stations from aircraft stations in the 2 200-2 290 MHz band

Word

92687 octetos 2014-10-08 [330]�Annex 03- Preliminary draft new Recommendation ITU-R SA.[SRS-AIRCRAFT 2 GHz] - Protection of SRS earth stations from mobile (aircraft) stations in the 2 200-2 290 MHz band

Word

308300 octetos 2020-12-17 [330]�Annex 02- Working document toward a preliminary draft new Report - Characteristics to be used for assessing interference to systems operating in the earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies

Word

508069 octetos 2014-10-09 [330]�Annex 01- Preliminary draft new Report ITU-R SA.[GSO EESS-SPACE-7GHZ] - Compatibility between GSO EESS (Earth-to-space), the fixed service, the mobile service, the space research service, or the space operation service in the band 7 190-7 235 MHz

Word

64545 octetos 2014-10-24 [330]�- Report on the October 2014 meeting of Working Party 7B with a view to its next meeting (May 2015)

Documento :

UIT-R�WP7B� Contribuci�n� 330

T�tulo :

Report of the October 2014 meeting of Working Party 7B with a view to its next meeting (May 2015) (Geneva, 1-7 October 2014)

Recibido en :

2014-10-07

Origen :

Chairman, WP 7B

Disponibilidad :

Restringido a usuarios de TIES�[UIT-R]

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2020-12-17