Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP5B : Contribuciones : 62 Nuevo�-� Busque los documentos de la reuni�n
[62]� Report of the meeting of Working Party 5B (Geneva, 22 May - 1 June 2012)

Formato

Tama�o

Puesta a disposici�n

English

Word

70094 octetos 2012-06-05 [62]�Annex 32- List of documents issued - Documents 5B/810 - 5B/813 (carried forward from 2007-2012 study period) and Documents 5B/1 - 5B/60 (from the current 2012-2015 study period)

Word

51514 octetos 2012-07-02 [62]�Annex 31 Revision 1- List of output documents (Documents 5B/TEMP/1-5B/TEMP/44)

Word

3783593 octetos 2012-06-05 [62]�Annex 30- Liaison statement to the International Maritime Organization (IMO) - Revision of Recommendation ITU-R M.1371-4 - Technical characteristics for an automatic identification system using time-division multiple access in the VHF maritime mobile band

Word

2524068 octetos 2012-06-05 [62]�Annex 29- Liaison statement to International Maritime Organization (IMO) and International Association of Marine Aids to Navigation and Lighthouse Authorities (IALA) - World Radiocommunication Conference (WRC)-15 - Agenda item 1.16

Word

67912 octetos 2012-06-05 [62]�Annex 28- Liaison statement to ICAO - Use of satellite radio links for the control and non-payload communications of unmanned aircraft systems under WRC-15 Agenda item 1.5

Word

187016 octetos 2012-06-05 [62]�Annex 27- Work Plan and milestones for consideration of Recommendation ITU-R M.493 "Digital selective-calling system for use in the maritime mobile service"

Word

115698 octetos 2012-06-28 [62]�Annex 26 Revision 1- Working document toward a preliminary draft new Report ITU-R M.[MAR-UMS] - Characteristics of unmanned maritime systems

Word

1394747 octetos 2012-06-28 [62]�Annex 25 Revision 1- Working document toward a preliminary draft new Report ITU-R M.[COM-ENVIRO] - Worldwide maritime radiocommunication plan

Word

340196 octetos 2012-06-28 [62]�Annex 24 Revision 1- Working document toward a preliminary draft new Report ITU-R M.[MAN OVERBOARD SYSTEM] - Maritime survivor locating systems and devices (man overboard systems) - An overview of systems and their mode of operation

Word

690122 octetos 2012-06-28 [62]�Annex 23 Revision 1- Working document toward a preliminary draft new Report ITU-R M.[EXCHANGE-MARITIME-INFOS] - Near-real-time exchange of maritime domain information

Word

130360 octetos 2012-06-28 [62]�Annex 22 Revision 1- Working document towards a preliminary draft new Report ITU-R M.[WAIC BANDS] - Analysis of the aeronautical mobile (route), aeronautical mobile, and aeronautical radionavigation services to accommodate wireless avionics intra-communications

Word

4784613 octetos 2012-06-28 [62]�Annex 21 Revision 1- Working document towards a preliminary draft new Report ITU-R M.[WAIC_CHAR_SPEC] - Characteristics of WAIC systems and bandwidth requirements to support their safe operation

Word

655017 octetos 2012-06-05 [62]�Annex 20- Working document towards a preliminary draft new Report ITU-R M.[AUTOMOTIVE RADARS] - Systems characteristics and compatibility of automotive radars operating in the 77.5-78 GHz band for sharing studies

Word

80780 octetos 2012-06-28 [62]�Annex 19 Revision 1- Working document towards a preliminary draft new Report ITU-R M.[UAS-FSS] - Studies to support the beyond line-of-sight command and non-payload communications mobile links for unmanned aerial systems in certain frequency bands allocated to the fixed-satel

Word

4011380 octetos 2012-06-28 [62]�Annex 18 Revision 1- Preliminary draft new Report on compatibility of systems operating in the radionavigation-satellite service and radars in the frequency band 1 215-1 300 MHz

Word

273752 octetos 2012-06-28 [62]�Annex 17 Revision 1- Preliminary draft new Recommendation - Operational and technical characteristics and protection criteria of radio altimeters utilizing the frequency band 4 200-4 400 MHz

Word

11710773 octetos 2012-06-28 [62]�Annex 16 Revision 1- Working document towards a preliminary draft revision of Recommendation ITU-R M.1874 - Technical and operational characteristics of oceanographic radars operating in sub-bands within the frequency range 3-50 MHz

Word

504767 octetos 2012-06-28 [62]�Annex 15 Revision 1- Preliminary draft revision of Recommendation ITU-R M.1841 - Compatibility between FM sound-broadcasting systems in the frequency band of about 87-108 MHz and the aeronautical ground-based augmentation system in the frequency band 108-117.975 MHz

Word

298793 octetos 2012-06-28 [62]�Annex 14 Revision 1- Preliminary draft revision of Recommendation ITU-R M.1796-1 - Characteristics of and protection criteria for terrestrial radars operating in the radiodetermination service in the frequency band 8 500-10 680 MHz

Word

57058 octetos 2012-06-28 [62]�Annex 13 Revision 1- Preliminary draft revision of Recommendation ITU-R M.1176 - Technical parameters of radar target enhancers

Word

55641 octetos 2012-06-27 [62]�Annex 12- This Annex is withdrawn - the draft revision of Recommendation ITU-R M.629 was sent to Study Group 5 (see Document 5/9)

Word

95373 octetos 2012-06-28 [62]�Annex 11 Revision 1- Preliminary draft revision of Recommendation ITU-R M.1463-1 - Characteristics of and protection criteria for radars operating in the radiodetermination service in the frequency band 1 215-1 400 MHz

Word

64761 octetos 2012-06-04 [62]�Annex 10- Work plan for WRC-15 Agenda item 1.18

Word

54941 octetos 2012-07-02 [62]�Annex 09 Revision 1- Working document towards draft CPM text - Chapter 3 - Agenda item 1.18

Word

62681 octetos 2012-06-04 [62]�Annex 08- Workplan and milestones for WRC-15 Agenda item 1.17

Word

43940 octetos 2012-07-02 [62]�Annex 07 Revision 1- Working document towards a draft CPM text - Chapter 3 - Aeronautical, Maritime and radiolocation issues - Agenda item 1.17

Word

67874 octetos 2012-06-04 [62]�Annex 06- Draft workplan - Agenda item 1.16

Word

64589 octetos 2012-07-02 [62]�Annex 05 Revision 1- Working document towards draft CPM text - Chapter 3 - Agenda item 1.16

Word

50211 octetos 2012-06-04 [62]�Annex 04- Draft workplan - Agenda item 1.15

Word

50123 octetos 2012-07-02 [62]�Annex 03 Revision 1- Working document towards draft CPM text - Chapter 3 - Aeronautical, Maritime and Radiolocalisation issues (Agenda items 1.5, 1.15, 1.16, 1.17, 1.18) - Agenda item 1.15

Word

65165 octetos 2012-06-01 [62]�Annex 02- Working document on the work plan for FSS/UAS studies under WRC-15 Agenda item 1.5

Word

44395 octetos 2012-07-02 [62]�Annex 01 Revision 1- Working document towards preliminary draft new CPM text - WRC-15 Agenda item 1.5 - Chapter 3

Word

101327 octetos 2012-06-28 [62]�- Report on the ninth meeting of Working Party 5B (Geneva, 22 May - 1st June 2012)

Documento :

UIT-R�WP5B� Contribuci�n� 62

T�tulo :

Report of the meeting of Working Party 5B (Geneva, 22 May - 1 June 2012)

Recibido en :

2012-06-01

Origen :

Chairman, WP 5B

Disponibilidad :

Restringido a usuarios de TIES�[UIT-R]

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2012-07-02