|
Formato |
Tama�o |
Puesta a disposici�n |
|
|
|
English |
Word
�
|
53465 octetos |
2012-07-04 |
[61]�Annex 24- List of liaison statements to ITU-R Groups |
|
Word
�
|
57141 octetos |
2012-06-08 |
[61]�Annex 23- Working document - Work plan for WRC-15 Agenda item 9.1.2 |
|
Word
�
|
57483 octetos |
2012-06-08 |
[61]�Annex 22- Working document - Work plan for WRC-15 Agenda item 1.9.1 |
|
Word
�
|
55066 octetos |
2012-06-08 |
[61]�Annex 21- Working document - Work plan for WRC-15 Agenda item 1.8 |
|
Word
�
|
46003 octetos |
2012-06-08 |
[61]�Annex 20- Working document - Work plan for WRC-15 Agenda item 1.7 |
|
Word
�
|
57631 octetos |
2012-06-08 |
[61]�Annex 19- Working document - Work plan for WRC-15 Agenda item 1.6 |
|
Word
�
|
46503 octetos |
2012-06-08 |
[61]�Annex 18- Working document addressing issues which were not addressed in Report ITU-R S.2223 - Earth stations on mobile platforms operating in geostationary fixed-satellite service networks in the 17.3 to 30.0 GHz band |
|
Word
�
|
5471326 octetos |
2012-06-08 |
[61]�Annex 17- Working document - Technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7 |
|
Word
�
|
265598 octetos |
2012-06-08 |
[61]�Annex 16- Working document - Development of EPFD validation software in accordance with Recommendation ITU-R S.1503-1 |
|
Word
�
|
339326 octetos |
2012-06-08 |
[61]�Annex 15- Working document - Examination under � 2.2 of Annex 4 of RR Appendix 30B (Grid points at locations with low satellite antenna gain) |
|
Word
�
|
54683 octetos |
2012-06-08 |
[61]�Annex 14- Working document - Application of Article 2A to RR Appendices 30 and 30A |
|
Word
�
|
65853 octetos |
2012-06-07 |
[61]�Annex 13- Working document - Size of the coordination arc for triggering coordination under RR No. 9.7 between geostationary-satellite networks |
|
Word
�
|
503535 octetos |
2012-06-07 |
[61]�Annex 12- Working document towards a preliminary draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs) operating in fixed satellite service networks |
|
Word
�
|
255966 octetos |
2012-06-07 |
[61]�Annex 11- Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO) |
|
Word
�
|
652185 octetos |
2012-06-07 |
[61]�Annex 10- Working document towards a preliminary draft new Report ITU-R S.[ESV] on the interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on fixed service stations |
|
Word
�
|
242867 octetos |
2012-06-07 |
[61]�Annex 09- Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the fixed-satellite service in Regions 2 and 3 (GSO) |
|
Word
�
|
49573 octetos |
2012-06-07 |
[61]�Annex 08- Working document towards a preliminary draft new Report ITU-R S.[NGSO ESOMPS] - Technical and operational requirements for earth stations on mobile platforms operating in non-GSO FSS systems in the frequency bands... |
|
Word
�
|
98874 octetos |
2012-06-07 |
[61]�Annex 07- Working document towards a preliminary draft new Report ITU-R S.[SPECTRUM-ORBIT-RESOURCE] - Assessment of the orbital-radio-frequency spectrum resource used by a GSO satellite communication system |
|
Word
�
|
54691 octetos |
2012-06-07 |
[61]�Annex 06- Working document towards a preliminary draft new Report or Recommendation ITU-R S.[FSS-5GHZ ARNS COMPATIBILITY] - Compatibility between new systems of the aeronautical radionavigation service and the existing fixed-satellite service (FSS)... |
|
Word
�
|
44598 octetos |
2012-06-07 |
[61]�Annex 05- Working document towards a preliminary draft revision of Recommendation ITU-R S.1782 - Possibilities for global broadband Internet access by fixed-satellite service systems
|
|
Word
�
|
63741 octetos |
2012-06-07 |
[61]�Annex 04- Working document towards a preliminary draft revision of Recommendation ITU-R BO.1898 - Power flux-density value required for the protection of receiving earth stations in the broadcasting-satellite service in Regions 1 and 3 from emissions...
|
|
Word
�
|
3062631 octetos |
2012-06-11 |
[61]�Annex 03- [Working document towards a[ [preliminary] draft new Recommendation ITU-R S.[TIME_VAR_SMALL_E/S] - Statistical methodology to assess time-varying interference produced by a network of small earth stations operating with TDMA schemes... |
|
Word
�
|
57119 octetos |
2012-06-07 |
[61]�Annex 02- Preliminary draft revision of Recommendation ITU-R SF.674-2 - Determination of the impact on the fixed service operating in the 11.7-12.2 GHz band when geostationary fixed-satellite service networks in Region 2... |
|
Word
�
|
116400 octetos |
2012-06-07 |
[61]�Annex 01- Preliminary draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth-station antenna side-lobe peaks |
|
Word
�
|
133312 octetos |
2012-07-04 |
[61]�- Report on the meeting of Working Party 4A (Geneva, 30 May - 6 June 2012) |
|
|