|
Formato |
Tama�o |
Puesta a disposici�n |
|
|
|
English |
Word
�
|
51759 octetos |
2014-06-24 |
[166]�Annex 23- Liaison statement to CISPR (copy to ITU-R Working Party 6A) - A database for the protection of radio services |
|
Word
�
|
50965 octetos |
2014-06-24 |
[166]�Annex 22- Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A, 7D) - ITU-R interest in K series Recommendations |
|
Word
�
|
52137 octetos |
2014-06-24 |
[166]�Annex 21- Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems |
|
Word
�
|
130039 octetos |
2014-06-24 |
[166]�Annex 20- Liaison statement to the broadband forum (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Specifications and performance of cabling intended for use with G.fast |
|
Word
�
|
50188 octetos |
2014-06-23 |
[166]�Annex 19- Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 6A and 7D) - Considerations on the G.9700 power spectral density (PSD) limit mask
|
|
Word
�
|
48992 octetos |
2014-06-23 |
[166]�Annex 18- Liaison statement to ITU-T Study Groups 5 and 15 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Excessive levels of radio frequency noise in the environment
|
|
Word
�
|
135174 octetos |
2014-06-24 |
[166]�Annex 17- Liaison statement to ITU-T Study Group 15 and CENELEC (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Ensuring that telecommunication systems that depend on the use of radio frequencies have been properly assessed for compatibility and the avoidance of harmful interference |
|
Word
�
|
2989715 octetos |
2014-06-19 |
[166]�Annex 16- Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] - WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT
NEW REPORT ITU-R SM.[CHAR-UNWANTED]
Characteristics of the unwanted emissions in the out-of-band
and spurious domains for digital modulation technology
used in broadband communication systems
|
|
Word
�
|
53478 octetos |
2014-07-01 |
[166]�Annex 15- Liaison statement to external Organizations - Working document towards a preliminary draft new ITU-R Report on the Smart Grid project |
|
Word
�
|
55439 octetos |
2014-07-01 |
[166]�Annex 14- Liaison statement to ITU-T Study Group 15 (copy for information to IEC (TC57 WG20)) - Cooperation on the narrow-band PLT component of the Smart Grid project
Cooperation on the narrow-band PLT component of the Smart Grid project
|
|
Word
�
|
460478 octetos |
2014-06-24 |
[166]�Annex 13- Working document towards a preliminary draft new Report ITU-R SM.[SMART_GRID] - Smart grid power management systems |
|
Word
�
|
49813 octetos |
2014-07-01 |
[166]�Annex 12- Reply liaison statement to Asia Pacific Telecommunity - Study on Question ITU-R 210-3/1 "Wireless power transmission" |
|
Word
�
|
52750 octetos |
2014-07-01 |
[166]�Annex 11- Liaison statement to external organizations - Study on Question ITU-R 210-3/1 "Wireless power transmission" related to wireless power transmission via radio frequency beam |
|
Word
�
|
51337 octetos |
2014-07-01 |
[166]�Annex 10- Liaison statement to external organizations - Study on Question ITU-R 210-3/1 "Wireless power transmission" |
|
Word
�
|
54873 octetos |
2014-07-01 |
[166]�Annex 09- Reply liaison statement to the Alliance for Wireless Power - Study on Question ITU-R 210-3/1 "Wireless power transmission" |
|
Word
�
|
50009 octetos |
2014-07-01 |
[166]�Annex 08- Reply liaison statement to Telecommunications Technology Association - Study on Question ITU-R 210-3/1 "Wireless power transmission" |
|
Word
�
|
51675 octetos |
2014-07-01 |
[166]�Annex 07- Reply liaison statement to IEC TC100 (Copy to ISO/IEC TC 69/JPT 61980-1 and ISO TC22) - Study on Question ITU-R 210-3/1 "Wireless power transmission" |
|
Word
�
|
60569 octetos |
2014-07-01 |
[166]�Annex 06- Reply liaison statement to CISPR (copy to ISO/IEC TC 69/JPT 61980-1 and ISO TC22) - Study on Question ITUR 210-3/1 "Wireless power transmission" |
|
Word
�
|
46831 octetos |
2014-06-24 |
[166]�Annex 05- Terms of reference (TOR) for a Correspondence Group (CG-WPT) on developing content for deliverables related to Question ITU-R 210-3/1 Wireless power transmission |
|
Word
�
|
47692 octetos |
2014-06-24 |
[166]�Annex 04- Working document towards a preliminary draft new Recommendation ITU-R SM.[WPT] - Wireless Power Transmission (WPT) systems |
|
Word
�
|
46623 octetos |
2014-06-30 |
[166]�Annex 03- Liaison statement to the Institute of Electrical and Electronics Engineers (IEEE) on the preliminary draft new Report ITU-R SM.[THZ_TREND] - Technology trends of active services in the bands above 275 GHz |
|
Word
�
|
845950 octetos |
2014-06-24 |
[166]�Annex 02- Preliminary draft new Report ITU-R SM.[THZ.TREND] - Technology trends of active services in the band above 275 GHz |
|
Word
�
|
153159 octetos |
2014-06-24 |
[166]�Annex 01- Preliminary draft revision of Recommendation ITU-R SM.1132-2 - General principles and methods for sharing between radiocommunication services |
|
Word
�
|
76689 octetos |
2014-07-03 |
[166]�- Report of the meeting of Working Party 1A (Geneva, 3-11 June 2014) |
|
|