Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 275 ]
�
� |
Liaison statement to Working Parties 4C, 5D and 7C - Status of studies on the harmonization/rationalization of frequency bands/tuning ranges for cross-border deployment of electronic news gathering (ENG) systems
�
� |
WP 5C
� |
� |
2011-11-18 |
|
[ 274 ]
�
� |
Liaison statement to Working Parties 7C and 7D - Coexistence between fixed service operating in 71-76 GHz, 81-86 GHz and 92-94 GHz bands and -passive services
�
� |
WP 5C
� |
� |
2011-11-17 |
|
[ 273 ]
�
� |
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 7B and 7C - Studies in support of WRC-12 Agenda item 1.20
�
� |
WP 5C
� |
� |
2011-11-16 |
|
[ 272 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Draft revision of Recommendation ITU-R F.758-4
�
� |
WP 5C
� |
� |
2011-11-16 |
|
[ 271 ]
�
� |
Liaison statement to Working Parties 5B, 7C and 7D - Draft revision of Report ITU-R F.2107-1 - Characteristics and applications of fixed wireless systems operating in frequency ranges between 57 GHz and 134 GHz
�
� |
WP 5C
� |
� |
2011-11-16 |
|
[ 270 ]
�
� |
ITU-R Study Group 1 Recommendation to be brought to the attention of Study Groups 4, 5, 6 and 7
�
� |
BR Study Group Department
� |
� |
2011-11-03 |
|
[ 269 ]
�
� |
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Handbook on "Propagation information for the prediction of interference and coordination distance"
�
� |
SG 3
� |
� |
2011-10-31 |
|
[ 268 ]
�
+Ann.1-11� |
Report of the meeting of Working Party 7C - (Geneva, 26-30 September 2011)
�
� |
Chairman, WP 7C
� |
� |
2011-10-03 |
|
[ 267 ]
�
� |
Final List of Participants - Working Party 7C (Geneva, 26-30 September 2011)
�
� |
Director, BR
� |
� |
2011-09-30 |
|
[ 266 ]
�
� |
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Party 1A) - A database for the protection of radio services
�
� |
WP 4A
� |
� |
2011-09-29 |
|
[ 265 ]
�
� |
Liaison statement to Working Party 7C - Updated documents on pulsed interference to RNSS receivers
�
� |
WP 4C
� |
� |
2011-09-26 |
|
[ 264 ]
�
� |
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working parties 1A, 4A) - A database for the protection of radio services
�
� |
WP 4C
� |
� |
2011-09-28 |
|
[ 263 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2011-09-23 |
|
[ 262 ]
�
� |
Sharing studies between EESS (passive) and fixed service in the band 31.5-31.8 GHz
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
232/7
� |
2011-09-19 |
|
[ 261 ]
�
� |
Draft revision of Recommendation ITU-R RS.515-4 - Frequency bands and bandwidths used for satellite passive remote sensing
�
� |
Korea (Republic of)
� |
� |
2011-09-19 |
|
[ 260 ]
�
� |
Proposed modifications to Annex 3 of Doc. 7C/214 - PDR of Recommendation ITU-R RS.1347 - Feasibility of sharing between radionavigation-satellite service receivers and the Earth exploration-satellite (active) and space research (active) services in the 1 215-1 300 MHz band
�
� |
United States of America
� |
� |
2011-09-15 |
|
[ 259 ]
�
� |
Draft new Report ITU-R RS.[3.15 GHZ SHARE] - Sharing the 31.5-31.8 GHz band by the fixed and mobile services and the Earth exploration-satellite service (passive)
�
� |
United States of America
� |
232-1/7
� |
2011-09-15 |
|
[ 258 ]
�
� |
Draft liaison statement to ITU-R Working Party 5C - Studies regarding WRC-12 Agenda item 1.8 involving FS OOB emissions into EESS (passive) systems in the 86-92 GHz band
�
� |
United States of America
� |
129-2/7
� |
2011-09-15 |
|
[ 257 ]
�
� |
Draft liaison statement to ITU-R Working Party 5C - Studies regarding WRC-12 Agenda item 1.20 involving EESS (passive) and HAPS gateway stations
�
� |
United States of America
� |
� |
2011-09-15 |
|
[ 256 ]
�
� |
Working document towards a preliminary draft new Report - Potential interference between the Earth exploration satellite (active) and space research (active) in the 1 215-1 300 MHz and the Air-Route surveillance radars in the 1 215-1 400 MHz band
�
� |
United States of America
� |
� |
2011-09-15 |
|
[ 255 ]
�
� |
Potential impact to EESS (passive) systems operating near 6 GHz from HAPS gateway systems
�
� |
United States of America
� |
� |
2011-09-15 |
|
[ 254 ]
�
� |
Evaluation of fixed service OOB interference to EESS (passive) systems in 86-92 GHz
�
� |
United States of America
� |
129-2/7
� |
2011-09-15 |
|
[ 253 ]
�
� |
Working document toward a draft new Report RS.[MITIG_RNSS-EESS] "Compatibility measurements and possible mitigation measures between EESS (active) systems and RNSS systems in the band 1 215-1 300 MHz"
�
� |
United States of America
� |
288/4, 217-2/4
� |
2011-09-15 |
|
[ 252 ]
�
� |
Typical technical and operating characteristics and preferred frequency bands of spaceborne radar sounder systems in EESS (active)
�
� |
United States of America
� |
� |
2011-09-15 |
|
[ 251 ]
�
� |
Draft liaison statement to ITU-D Study Group 2 and the World Meteorological Organization - Additional information in support of ITU-D Study Group 2 Question 22-1/2
�
� |
United States of America
� |
� |
2011-09-15 |
|
[ 250 ]
�
� |
Proposed draft new Recommendation ITU-R RS.[PERF_INTERF], performance and interference criteria for satellite passive remote sensing
�
� |
United States of America
� |
� |
2011-09-15 |
|
[ 249 ]
�
� |
Analysis and proposed revision to Report ITU-R F.[FS/PASSIVE - 70-80 GHz]
�
� |
France
� |
� |
2011-09-16 |
|
[ 248 ]
�
� |
Technical and operational characteristics of the space station "Spektr-R" passive sensors
�
� |
Russian Federation
� |
221/7
� |
2011-09-16 |
|
[ 247 ]
�
� |
Preliminary analysis of the impact of unwanted emissions of SAR operating at 9 GHz into SRS deep space stations operating in the band 8.4-8.5 GHz and radioastronomy stations operating in the band 10.6-10.7 GHz
�
� |
France
,
Germany (Federal Republic of)
� |
� |
2011-09-16 |
|
[ 246 ]
�
� |
Report of RAG activities
�
� |
Chairman, SG 7
� |
� |
2011-09-05 |
|
[ 245 ]
�
� |
Modification to preliminary draft revision of Recommendation ITU-R RS.1347 - Feasibility of sharing between radionavigation-satellite service receivers and the Earth exploration-satellite (active) and space research (active) services in the 1 2515-1 300 MHz band
�
� |
Japan
� |
234/7
� |
2011-09-01 |
|
[ 244 ]
�
� |
ITU-R Study Group 5 Recommendation ITU-R F.1107-2 - Probabilistic analysis for assessing interference into the fixed service from satellites using the geostationary orbit
�
� |
BR Study Group Department
� |
� |
2011-08-09 |
|
[ 243 ]
�
� |
Questions assigned to Radiocommunication Study Group 7 - Science services
�
� |
Chairman, SG 7
� |
� |
2011-07-28 |
|
[ 242 ]
�
� |
Liaison statement to Working Party 4C and Working Party 7C regarding sharing in the frequency bands 5 150-5 250 MHz, 10.5-10.6 GHz and 13.25-13.4 GHz
�
� |
WP 5B
� |
� |
2011-07-01 |
|
[ 241 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5B, 5C, 7B, 7C and 7D - On proposed revisions to Recommendation ITU-R M.1732
�
� |
WP 5A
� |
� |
2011-06-27 |
|
[ 240 ]
�
� |
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 7B and 7C - Status of studies in support of WRC-12 Agenda item 1.20
�
� |
WP 5C
� |
� |
2011-06-24 |
|
[ 239 ]
�
� |
Liaison statement to relevant Working Parties of ITU-R Study Groups 4, 5, 6 and 7 - Status of studies in support of WRC-12 Agenda item 1.5
�
� |
WP 5C
� |
� |
2011-06-24 |
|
[ 238 ]
�
� |
Liaison statement to Working Parties 7C and 7D - Coexistence between fixed service operating in 71-76 GHz, 81-86 GHz and 92-94 GHz bands and passive services
�
� |
WP 5C
� |
� |
2011-06-23 |
|
[ 237 ]
�
� |
Liaison statement to ITU-R Working Parties 1A, 1B, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Revisions of F-Series Recommendations on the interference criteria (Recommendations ITU-R F.758-4 and ITU-R F.1495-1)
�
� |
WP 5C
� |
� |
2011-06-22 |
|
[ 236 ]
�
� |
Liaison statement to Working Parties 7C and 7D - Development of new ITU-R Recommendations on radio frequency arrangements for fixed service systems in frequency arrangements for fixed service systems in frequency ranges 40.5-43.5 GHz, 71-86 GHz and 92-95 GHz
�
� |
WP 5C
� |
� |
2011-06-22 |
|
[ 235 ]
�
� |
Liaison statement to Working Parties 7C and 7D - Proposed modifications to preliminary draft revision of Report ITU-R F.2107-1 - Characteristics and applications of fixed wireless systems operating in frequency range between 57 GHz and 134 GHz
�
� |
WP 5C
� |
� |
2011-06-22 |
|
[ 234 ]
�
� |
Liaison statement to Working Party 7C - Regarding studies under Question ITU-R 232-1/7
�
� |
WP 5C
� |
232/7
� |
2011-06-22 |
|
[ 233 ]
�
� |
Liaison statement to Study Groups 4, 5, 6 and 7 and relevant Working Parties (copy to ITU-T Study Group 15) - Activities regarding the protection range calculation between inductive systems and radiocommunication services using frequencies below 30 MHz
�
� |
WP 1A
� |
� |
2011-06-10 |
|
[ 232 ]
�
� |
Liaison statement to Study Groups 4, 5, 6 and 7 and relevant Working Parties - Protection of radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment
�
� |
WP 1A
� |
� |
2011-06-10 |
|
[ 231 ]
�
� |
Liaison statement to Study Groups 4, 6 and 7 and Working Parties 5A, 5B, 5C and 5D on a database for the protection of radio services
�
� |
SG 1
� |
� |
2011-06-08 |
|
[ 230 ]
�
� |
Reply liaison statement to Working Party 7C (copy to ICAO for information) - Feasibility of sharing between the radionavigation-satellite service (space-to-Earth and space-to-space) and the Earth exploration-satellite (active) and space research (active) services in the band 1 215-1 300 MHz
�
� |
WP 4C
� |
� |
2011-05-24 |
|
[ 229 ]
�
� |
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 7 and copy to ITU-T Study Groups 9 and 15 for information) Further work on power line telecommunications
�
� |
WP 6A
� |
� |
2011-05-20 |
|
[ 228 ]
�
� |
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 7 and copy to ITU-T Study Groups 9 and 15 for information) - Further work on power line telecommunications
�
� |
WP 6A
� |
� |
2011-05-20 |
|
[ 227 ]
�
� |
Progress of the studies requested by WRC Resolutions and Recommendations (except those related to WRC-12 Agenda items)
�
� |
Chairman, SG 7
� |
� |
2011-05-16 |
|
[ 226 ]
�
� |
Initial review of ITU-R Resolutions of specific concern to the scope of Study Group 7
�
� |
Chairman, SG 7
� |
� |
2011-05-16 |
Resultados :275 documentos Resultados :�
1 -
2 -
3 -
4 -
5 -
6
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):