Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP7B : Contribuciones : 308 Nuevo�-� Busque los documentos de la reuni�n
[308]� Report of the September 2011 meeting of Working Party 7B with a view to its next meeting (September 2012) - (Geneva, 26-30 September 2011)

Formato

Tama�o

Puesta a disposici�n

English

Word

106660 octetos 2011-10-27 [308]�Annex 06- Preliminary draft new Recommendation ITU-R SA.[EES/METSAT USAGE 401-403 MHz] - Basic general partitioning and sharing conditions for the band 401-403 MHz for future long-term coordinated use of data collection systems on geostationary and non-geostationar

Word

239520 octetos 2011-10-25 [308]�Annex 05- Preliminary draft new Recommendation ITU-R SA.[EES/MET DCS INTERF] - Protection criteria for non-GSO data collection platforms in the band 401-403 MHz

Word

150337 octetos 2011-10-27 [308]�Annex 04- Preliminary draft new Recommendation ITU-R SA.[EES/MET CHAR] - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies

Word

85577 octetos 2011-10-25 [308]�Annex 03- Preliminary draft new Recommendation ITU-R SA.[EES/MET METH] - Protection criteria for MetSat and EESS services

Word

391133 octetos 2011-10-25 [308]�Annex 02- Preliminary draft revision of Recommendation ITU-R SA.509 - Research earth station and radio astronomy reference antenna radiation pattern for use in interference calculations, including coordination procedures, for frequency bands less than 30 GHz

Word

217384 octetos 2011-10-25 [308]�Annex 01- Preliminary draft revision of Recommendation ITU-R SA.1414 - Characteristics of data relay satellite systems

Word

83058 octetos 2011-11-04 [308]�- Report on the September 2011 meeting of Working Party 7B with a view to its next meeting (September 2012)

Documento :

UIT-R�WP7B� Contribuci�n� 308

T�tulo :

Report of the September 2011 meeting of Working Party 7B with a view to its next meeting (September 2012) - (Geneva, 26-30 September 2011)

Recibido en :

2011-10-03

Origen :

Chairman, WP 7B

Disponibilidad :

Restringido a usuarios de TIES�[UIT-R]

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2011-11-07