Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP7D : Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-R�WP7D� C�

UIT-R�WP7D

Radio-astronom�a

Resultados :156 documentos
Resultados :� 1 - 2 - 3 - 4 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 156 ]
Liaison statement to Working Parties 6B and 9D - System characteristics of television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the mobile service for use in sharing studies � WP 8A 2007-08-01
[ 155 ]
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B � WP 4-9S 2007-06-29
[ 154 ]
Liaison statement to Working Parties 6E, 7A, 7B, 7C, 7D, 8A, 8B, 8F, 9A and 9C - Interference protection requirements from power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF and VHF bands below 80 MHz � WP 1A 2007-06-19
[ 153 ]
Response to the liaison statement of Working Party 3J (copy to WPs 4A, 6E, 6M, 6S, 7B, 7C, 7D 8A, 8B, 8D, 8F and 9B) - Radio noise � WP 1A 2007-06-18
[ 152 ]
Liaison statement to WP 1B - Study of Software Defined Radio and cognitive radio systems in WP 1B � WP 4A 2007-06-08
[ 151 ]
Liaison statement to ITU-R Working Party 7D � ITU-T SG 5 2007-05-30
[ 150 ]
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B � WP 9B and 9D 2007-05-21
[ 149 ]
Reply to Liaison statement from 1B on the study of software defined radio and cognitive radio systems � WP 6S 2007-05-08
[ 148 ]
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B - (Copy for information to ITU-R WPs 1A, 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 9B and 9D) � WP 8F 2007-02-16
[ 147 ]
+Ann.1-3
Report on the February 2007 Meeting of Working Party 7D � Chairman, WP 7D 2007-02-09
[ 146 ]
Lista final de participantes - Grupo de trabajo 7D (Ginebra, 6-9 de febrero de 2007) � Director, BR 2007-02-09
[ 145 ]
List of documents issued � BR Study Group Department 2007-02-05
[ 144 ]
Astronomical use of the frequency band 100 - 300 THz and coexistence with other applications � Canada 235/7 2007-01-26
[ 143 ]
Review of the Questions assigned to WP 7D � Vice-Chairman, SG 7 2007-01-23
[ 142 ]
Working document towards Preliminary Draft Report - Techniques for migration of radio frequency interference in radio astronomy � United States of America 237/7 2007-01-22
[ 141 ]
Preliminary draft new Recommendation ITU-R F. [HAPS- RAS 47GHz] - Protection of RAS in 48.94-49.04 GHz band from Out-of-Band emissions from HAPS in 47.2-47.5 GHz and 47.9-48.2 GHz bands � Australia 2007-01-15
[ 140 ]
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database � Coordination Committee for Vocabulary (CCV) 2007-01-11
[ 139 ]
Liaison statement to WPs 1A, 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F, 9B and 9D - The study of software defined radio and cognitive radio systems in Working Party 1B � WP 1B 2006-11-09
[ 138 ]
Liaison statement to Working Parties 6J and 9D copy to 4B, 6E, 7C, 7D, 8B, 8F, 9B, and ITU-T Study Group 9 - System characteristics of television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the mobile service � WP 8A 2006-11-03
[ 137 ]
Recommendation to be brought to the attention of Working Party 7D � BR, Study Group Department 2006-10-30
[ 136 ]
+Corr.1
Liaison statement to Working Parties 1A, 1C, 4A, 4-9S, 6E, 7B, 7C, 7D, 8A, 8B, 8F, 9A and 9D - Spreadsheet implementation of the clear-air portion of Recommendation ITU-R P.452-12 � WP 3M 2006-10-06
[ 135 ]
Liaison statement to WP 7D � ITU-T SG 5 2006-09-27
[ 134 ]
+Ann.1-3
Chairman's report - meeting 28-31 August 2006 � Chairman, WP 7D 2006-09-04
[ 133 ]
Final List of Participants � Director, BR 2006-08-30
[ 132 ]
List of documents issued � BR Study Group Department 2006-08-25
[ 131 ] �
Preliminary Draft New Report - The impact on the radio astronomy service of unwanted emissions in excess of the levels defined by Recommendation ITU-R RA.769 � IUCAF 145/7 2006-08-18
[ 130 ]
Proposed revision to draft text for the CPM report on WRC-07 Agenda Item 1.7 � Russian Federation 2006-08-18
[ 129 ]
Calculation of interference to spaceborne receivers of the Space Research Service (passive) from mobile Earth station (E-s) in the frequency band 1 668-1 668.4 MHz � Russian Federation 2006-08-18
[ 128 ]
Sharing study for High Altitude Platform Stations in 47.2-47.5 GHz and 47.9-48.2 GHz bands to protect Radio Astronomy Services in 48.94-49.04 GHz band � Australia 146/7 2006-08-11
[ 127 ]
Misprint in ITU-R RA Handbook-2nd Edition � Korea (Republic of) 2006-08-18
[ 126 ]
A preliminary Draft Revision of Recommendation ITU-R RA.1031 � Korea (Republic of) 145/7 2006-08-18
[ 125 ] �
Interim report of the current results of computer simulations in relation to WRC-07 Agenda item 1.7 � Coord of Corresp Grp of WRC-07 Agenda Item 1.7 2006-08-16
[ 124 ]
Information document on sharing between the radio astronomy service and the fixed service in the bands 71-76 GHz, 81-86 GHz and 92-95 GHz � United States of America 226/7 2006-08-10
[ 123 ]
Working document towards PDN Report - Radio observations of pulsars for precision timekeeping � United States of America 205/7 2006-08-10
[ 122 ]
Liaison statement to WP's 6J, 4B, 6E, 7C, 7D, 8A, 8B, 8D, 8F, 9B, JTG 6-8-9 and ITU-T SG9 - System characteristics for use in sharing studies with television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the fixed service � WP 9D 2006-07-19
[ 121 ]
Liaison statement to WP's 1A, 1B, 4A, 4-9S, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and TG 1/9, and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336 � WP 9D 2006-07-19
[ 120 ]
ITU-R study Group 8 Question to be brought to the attention of Working Parties 4A, 7D, 9B, 9C and 9D � BR Study Group Department 2006-05-11
[ 119 ]
ITU-R Study Group 6 Question to be brought to the attention of Working Parties 4A, 7B, 7C, 7D, 8D and 9D � BR Study Group Department 2006-05-01
[ 118 ]
Liaison statement to Working Parties 7B, 7C, 7D and 8D - Additional information regarding sharing studies in bands between 16 and 30 GHz for aeronautical mobile telemetry applications � WP 8B 2006-04-28
[ 117 ]
Liaison statement to Working Party 7D - Compatibility studies between aeronautical mobile telemetry systems and the radio astronomy service in the 4 825-4 835 MHz band � WP 8B 2006-04-28
[ 116 ]
(Rev.1)
Liaison statement - Result of the study under Recommendation 723 (WRC-03) � WP 8A 2006-04-21
[ 115 ] �
LS to WP's 7D and 8D - Revision of Recommendation ITU-R S.1586 � WP 4A 2006-04-19
[ 114 ]
Liaison statement to Working Party 7D - Sharing between the MSS and SRS (passive) services in the band 1 668-1 668.4 MHz � WP 8D (SWG 8D3) 2006-03-20
[ 113 ]
Liaison statement to WP 7D - CPM text sections related to compatibility between non-GSO MSS feeder links in frequencies near 1 400 MHz and the radio astronomy service in the band 1 400-1 427 MHz � WP 8D 2006-03-17
[ 112 ]
Liaison statement to WPs 4B, 6E, 7C, 7D, 8A, 8D, 8F, 9B, 9D, JTG 6-8-9 and ITU-T SG 9 - Spectrum usage and operational characteristics of terrestrial electronic news gathering systems (ENG), television outside broadcast (TVOB) and electronic field production (EFP) � WP 6J 2006-03-16
[ 111 ]
Liaison statement to WP 7D (Copy to WP 4A for information) - Proposed corrections on Recommendations ITU-R S.1586 and ITU-R M.1583 � WP 8D 236/4 2006-03-14
[ 110 ]
ABU Views on WRC-07 Agenda item 1.21 � Asia-Pacific Broadcasting Union (ABU) 2006-02-28
[ 109 ]
Liaison statement to 4A, 4B, 4-9S, 6S, 7B, 7C, 7D - NGN and satellite work; and intersector coordination group on satellite (ICG-SAT) matters � ITU-T Study Group 13 10/13, ITU-T 2006-02-07
[ 108 ]
Liaison statement from WP 1B to SG 7 � WP 1B 2006-02-03
[ 107 ]
Liaison statement to WPs 1A, 1B, 4A, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and to TG 1/9 and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336 � WP 9D 2005-12-21
Resultados :156 documentos
Resultados :� 1 - 2 - 3 - 4 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2005-03-23