Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP4A : Contribuciones : 78 Nuevo�-� Busque los documentos de la reuni�n
[78]� Chairman's Report from the meeting of Working Party 4A (Geneva, 14-23 April 2004)

Formato

Tama�o

Puesta a disposici�n

English

Word

50176 octetos 2004-05-24 [78]�Annex 36

Word

48640 octetos 2004-05-24 [78]�Annex 35

Word

66048 octetos 2004-05-11 [78]�Annex 34- Liaison statement to Working Party 1B - Comments regarding PDNR SM.[ REML]

Word

59904 octetos 2004-05-11 [78]�Annex 33- Liaison statement to Working Party 3M - Use of Recommendation ITU-R P.452

Word

66048 octetos 2004-05-11 [78]�Annex 32- Draft liaison statement to WP 7B - Compatibility studies for geostationary meteorological satellite systems operating in the space-to-earth direction and the fixed-satellite service in the 18.0-18.1 GHz and/or 18.3-18.4 GHz bands

Word

50688 octetos 2004-05-11 [78]�Annex 31- Liaison statement to Working Party 7D - Broadband satellite systems for internet applications

Word

97280 octetos 2004-05-10 [78]�Annex 30- Response to liaison statement from WP 4-9S - Request for additional information on the characteristics of HEO fixed-satellite service systems in the 4, 11/12, and 18 GHz bands

Word

56320 octetos 2004-05-10 [78]�Annex 29- Liaison statement from WP 4A to the Special Committee - WRC-07 agenda item 1.10 - Studies leading towards a review of Appendix 30B

Word

58368 octetos 2004-05-10 [78]�Annex 28- Liaison statement to Working Party 6S - Draft revision to Recommendation ITU-R S.1503 and BO.1443-1

Word

61440 octetos 2004-05-10 [78]�Annex 27- Liaison statement to Working Party 8D - Satellite frequency allocations that could support the modernization of civil aviation telecommunication systems

Word

675328 octetos 2004-05-10 [78]�Annex 26- Liaison statement to Task Group 1/8 - Interference caused by ultra-wideband devices into the fixed-satellite service below 30 GHz

Word

60928 octetos 2004-05-10 [78]�Annex 25- Liaison statement to Working Parties 1A and 8D - Unwanted emission control for feeder links of the mobile-satellite service in bands near 1.4 GHz

Word

52224 octetos 2004-05-10 [78]�Annex 24- Liaison statement to Workin Party 1A - Bands above 275 GHz

Word

60416 octetos 2004-05-10 [78]�Annex 23- Liaison statement to WP 7B - Sharing between the space research service (space very long baseline interferometry telemetry) and the fixed-satellite service in the 37.5-38 GHz band

Word

583680 octetos 2004-05-10 [78]�Annex 22- Working document towards a PDR to Rec. ITU-R S.731 - Reference earth-station cross-polarized radiation pattern for use in frequency coordination and interference assessment in the frequency range from 2 to about 30 GHz

Word

196608 octetos 2004-05-10 [78]�Annex 21- Working document - Analysis of interference from HEO system TT&C transmissions into GSO/FSS networks

Word

50688 octetos 2004-05-10 [78]�Annex 20- WRC-03 agenda item 1.19 - Element for the Chairman Report

Word

57856 octetos 2004-05-10 [78]�Annex 19- Sharing between BSS and FSS in the 12 GHz frequency range

Word

58368 octetos 2004-05-10 [78]�Annex 18- Discussion on methods to ensure that the pfd limits at country borders in the band 13.75-14 GHz are met

Word

271872 octetos 2004-05-24 [78]�Annex 17- Working document on the orbital arc value for triggering the inter-service coordination between BSS in Region 2 and FSS (space-to-Earth) in Region 1 in the band 17.3-17.7 GHz

Word

301056 octetos 2004-05-10 [78]�Annex 16- Global broadband systems for internet applications - Elements for the Chairman's Report

Word

914432 octetos 2004-05-10 [78]�Annex 15- Working document - Characteristics of HEO systems and definition of HEO

Word

247808 octetos 2004-05-10 [78]�Annex 14- Draft elements for WP 4A's Chairman's Report - Guidelines for protection of FSS satellite networks using the geostationary satellite orbit (GSO) from interference caused by HEO satellite systems in highly inclined orbits in the frequency band 19.7-20.2 GH

Word

58368 octetos 2004-05-10 [78]�Annex 13- Element for the Chairman's Report

Word

99328 octetos 2004-05-7 [78]�Annex 12- Working document towards a PDNR on earth station antenna patterns based on measured antenna data

Word

116736 octetos 2004-05-7 [78]�Annex 11- Working Document towards a preliminary draft rev. of Rec. ITU-R S.524-8 - Maximum permissible levels of off-axis e.i.r.p. density from earth stations in geostationary-satellite orbit networks operating in the fixed-satellite service

Word

316416 octetos 2004-05-7 [78]�Annex 10- Possible exemple of the use of the 10-11/13 GHz band by ultra-small aperture terminals

Word

128512 octetos 2004-05-17 [78]�Annex 9- Working document - Studies leading towards a review of Appendix 30B (WRC-07 agenda item 1.10)

Word

339456 octetos 2004-05-7 [78]�Annex 8- PDNR - Methodology for determining whether an FSS earth station at a given location could transmit in the band 13.75-14 GHz without exceeding the pdf limit in RR No. 5.502

Word

76288 octetos 2004-05-7 [78]�Annex 7 Part 1- PDNR ITU-R S.[AAA] - Methodology to calculate the minimum separation angles at the Earth's surface between the direction of a satellite in a HEO "active" arc and the direction of a satellite in the GSO, and thus to find the maximum DT/T that...

Word

378368 octetos 2004-05-7 [78]�Annex 7 Part 2- PDNR ITU-R S.[AAA] - Methodology to calculate the minimum separation angles at the Earth's surface between the direction of a satellite in a HEO "active" arc and the direction of a satellite in the GSO, and thus to find the maximum DT/T that...

Word

342528 octetos 2004-05-7 [78]�Annex 6- Proposed draft revision to Rec. ITU-R BO.1443-1 - Reference BSS earth station antenna patterns for use in interference assessment involving non-GSO satellites in frequency bands covered by RR Appendix 30

Word

248832 octetos 2004-05-7 [78]�Annex 5- Preliminary draft revision of Rec. ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Art. S22 of the RR

Word

325120 octetos 2004-05-7 [78]�Annex 4- Revision of a PDNR - Static methodology for calculating epfd to trigger very large antenna coordination under Nos. 9.7A and 9.7B of the RR

Word

282624 octetos 2004-05-7 [78]�Annex 3- Preliminary revision of Recommendation ITU-R S.1587 to include new parameters and additional ESV systems

Word

148992 octetos 2004-05-7 [78]�Annex 2- Preliminary draft new Recommendation - Practical levels of unwanted emissions

Word

102912 octetos 2004-05-7 [78]�Annex 1- Preliminary draft revision of Recommendation ITU-R S.1427

Word

148992 octetos 2004-05-21 [78]�- Chairman's report on the meeting of Working Party 4A, Geneva, 14-23 April 2004

Documento :

UIT-R�WP4A� Contribuci�n� 78

T�tulo :

Chairman's Report from the meeting of Working Party 4A (Geneva, 14-23 April 2004)

Recibido en :

2004-05-04

Origen :

Chairman, WP 4A

Disponibilidad :

Restringido a usuarios de TIES�[UIT-R]

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2004-05-24