Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP4/9S : Contribuciones : 22 Nuevo�-� Busque los documentos de la reuni�n
[22]� Chairman's report on the meeting of Working Party 4-9S, Geneva, 9-17 February 2004

Formato

Tama�o

Puesta a disposici�n

English

Word

83456 octetos 2004-03-24 [22]�Annex 16- List of output documents (temps)

Word

51712 octetos 2004-02-18 [22]�Annex 15- List of documents issued

Word

49152 octetos 2004-02-18 [22]�Annex 14- List of participants

Word

60928 octetos 2004-02-18 [22]�Annex 13- Liaison statement to WP 1B - Response to WP 1B liaison statement to WP 4-9S on the application of a uniform criterion of evaluating interference between radio communication networks

Word

55808 octetos 2004-02-17 [22]�Annex 12- Liaison statement to Working Party 4A - Request for comments on a preliminary draft revision of Recommendation ITU-R SF.1649

Word

59904 octetos 2004-02-18 [22]�Annex 11- Liaison statement to Working Parties 9B and 9D - Request for information concerning fixed service characteristics in the band 17.7-19.7 GHz with regard to sharing with FSS systems using highly inclined orbits (HIO)

Word

59392 octetos 2004-02-17 [22]�Annex 10- Liaison statement to WP 3M - FS protection criteria to be considered with respect to satellites using highly inclined orbits in the 18 GHz band

Word

69120 octetos 2004-02-17 [22]�Annex 9- Liaison statement to WP 4A - Request for additional information on the characteristics of fixed-satellite service systems using highly inclined orbits in the 18 GHz band

Word

56832 octetos 2004-02-17 [22]�Annex 8- Liaison statement to Working Parties 3J and 3M - Acknowledgement and response to request for additional information concerning rain fade statistics in the bands 37.5-40.0 GHz and 42.0-42.5 GHz

Word

64000 octetos 2004-02-17 [22]�Annex 7- Element for Chairman's Report on WRC-07 Agenda item 1.18 (Resolution 141 (WRC-03))

Word

61952 octetos 2004-02-17 [22]�Annex 6- Working document towards a preliminary draft new Recommendation ITU-R SF.[HAPS-GSO 28 GHz] - Maximum allowable value of interference from the downlink of the fixed service using high altitude platform stations to the uplink of the fixed-satellite service

Word

186880 octetos 2004-02-18 [22]�Annex 5- Preliminary draft new Recommendation ITU-R SF.[4-9S/COORDINATION-multiES] - Methods to facilitate the implementation of large numbers of earth stations in the FSS in areas where terrestrial services are also deployed

Word

69632 octetos 2004-02-18 [22]�Annex 4- Preliminary draft revision of Recommendation ITU-R SF.1649 - Guidance for determination of interference from earth stations on board vessels to stations in the fixed service when the earth station on board vessels is within the minimum distance

Word

257536 octetos 2004-02-18 [22]�Annex 3- Preliminary draft revision of Recommendation ITU-R SF.1601 - Methodologies for interference evaluation from the downlink of the fixed service using high altitude platform stations to the uplink of the FSS using the geostationary satellites within the b

Word

67584 octetos 2004-02-18 [22]�Annex 2- Status of Questions assigned to WP 4-9S - Fixed service sharing with the fixed-satellite service

Word

72192 octetos 2004-02-18 [22]�Annex 1- Structure of Sub-Working Parties and allocation of documents

Word

111104 octetos 2004-03-25 [22]�- Chairman's Report

Documento :

UIT-R�WP4/9S� Contribuci�n� 22

T�tulo :

Chairman's report on the meeting of Working Party 4-9S, Geneva, 9-17 February 2004

Recibido en :

2004-02-17

Origen :

Chairman, WP 4-9S

Disponibilidad :

Restringido a usuarios de TIES�[UIT-R]

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2004-03-25