Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP4A : Contribuciones : 300 Nuevo�-� Busque los documentos de la reuni�n
[300]� On the use of simulation techniques to verify compliance of non-GSO FSS satellite systems with the additional operational limits to epfd down and proposed modification of PDNR S.[4A/TEMP/100]

Formato

Tama�o

Puesta a disposici�n

English

Zip (Document)

1078356 octetos 0001-10-3 [300]�- [4A/300] On the use of simulation techniques to verify compliance of non-GSO FSS satellite systems with the additional operational limits to epfd down and proposed modification of PDNR S.[4A/TEMP/100]

Documento :

UIT-R�WP4A� Contribuci�n� 300

T�tulo :

On the use of simulation techniques to verify compliance of non-GSO FSS satellite systems with the additional operational limits to epfd down and proposed modification of PDNR S.[4A/TEMP/100]

Recibido en :

2001-10-03

Origen :

United Kingdom of Great Britain and Northern Ireland

Reuni�n :

2001-10-03

Disponibilidad :

Restringido a usuarios de TIES�[UIT-R]

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2002-07-19