Contributions
�[�AI/Question:�Q13/15�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 893 ]
�
� |
Challenges in Meeting Time Transfer Requirements for 5G Networks
�
� |
Net Insight AB (Sweden)
,
T�rk Telekom A.S. (T�rkiye)
� |
Q13/15
� |
2023-11-07 |
|
[ 860 ]
�
� |
SyncPhy management model in G.7721
�
� |
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
� |
Q14/15, Q13/15
� |
2023-11-07 |
|
[ 858 ]
�
� |
GNSS and PTP time difference reporting
�
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
T�rk Telekom A.S. (T�rkiye)
� |
Q13/15
� |
2023-11-07 |
|
[ 856 ]
�
� |
Proposed text for fgMTN [G.mtn-sync]
�
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2023-11-07 |
|
[ 851 ]
�
� |
fgMTN CBR requirements
�
� |
China Mobile Communications Co. Ltd.
� |
Q13/15, Q11/15
� |
2023-11-07 |
|
[ 829 ]
�
(Rev.1)� |
Considerations on SyncOAM standardization
�
R1 only adds Q14/15 as a related Question
� |
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
� |
Q14/15, Q13/15
� |
2023-11-07 |
|
[ 826 ]
�
(Rev.1)� |
Proposals for G.781 Annex B
�
R1 only adds Q14/15 as a related Question
� |
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
� |
Q14/15, Q13/15
� |
2023-11-07 |
|
[ 813 ]
�
� |
Analysis of CBR services' bidirectional delay difference of differential protection in power grid communication network
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
State Grid Corporation of China
� |
Q13/15, Q11/15
� |
2023-11-07 |
|
[ 801 ]
�
� |
Ubiquitous Precision Time (G.8271, G.8271.1)
�
� |
Calnex Solutions plc. (United Kingdom)
,
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2023-11-07 |
|
[ 786 ]
�
� |
PTN technology standardization proposal
�
� |
Net Insight AB (Sweden)
,
T�rk Telekom A.S. (T�rkiye)
� |
Q13/15
� |
2023-11-07 |
|
[ 784 ]
�
� |
Extensive Verification of the fgOTN(CBR) Clock Solution for Preserving the Traditional OTN Level of Jitter/Wander with Practical DA Arrival Time Variation
�
� |
China Mobile Communications Co. Ltd.
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Microchip Technology Inc. (United States)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
State Grid Corporation of China
� |
Q13/15, Q11/15
� |
2023-11-07 |
|
[ 757 ]
�
� |
Considerations on automatic deployment of frequency synchronization
�
� |
China Information Communication Technologies Group
� |
Q13/15
� |
2023-11-06 |
|
[ 756 ]
�
� |
Further considerations and text proposal for SD-p layer to transport layer adaption functions [G.781.1]
�
� |
China Information Communication Technologies Group
� |
Q13/15
� |
2023-11-06 |
|
[ 702 ]
�
� |
Correction of an apparent inconsistency in G.8271.1
�
� |
Intel Corporation (United States)
� |
Q13/15
� |
2023-11-05 |
|
[ 693 ]
�
(Rev.1-2)� |
Network Synchronization Architectures for Supporting CBR Clients in fgMTN
�
R2 only adds Q13/15 as a related Question
� |
Microchip Technology Inc. (United States)
� |
Q13/15, Q11/15
� |
2023-11-03 |
|
[ 691 ]
�
� |
Discussion regarding 50ppb requirement in wireless deployments
�
� |
Intel Corporation (United States)
� |
Q13/15
� |
2023-11-03 |
|
[ 688 ]
�
� |
Proposed New Appendix for G.8251 Describing Jitter/Wander Accumulation Simulation Analyses for Transport of Sub1G CBR Clients over fgOTN
�
� |
Futurewei Technologies Inc. (United States)
,
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2023-11-03 |
|
[ 684 ]
�
� |
PTP wait-to-restore [G.8275.1/2]
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2023-11-03 |
|
[ 683 ]
�
� |
Changes to PMref to address G.8275.1 monitoring use-cases
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2023-11-03 |
|
[ 682 ]
�
� |
PMref proposed changes [G.8275]
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2023-11-03 |
|
[ 681 ]
�
� |
Detection of OTN devices by Packet devices
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15, Q11/15
� |
2023-11-03 |
|
[ 680 ]
�
� |
PTP Security [G.8275.1]
�
� |
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q13/15
� |
2023-11-03 |
|
[ 679 ]
�
� |
Figure replacement and Editorial changes [G.8251]
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2023-11-03 |
|
[ 678 ]
�
� |
Priority table in G.8275.1/ G.Suppl-FTS
�
� |
China Unicom
,
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2023-11-03 |
|
[ 677 ]
�
(Rev.1)� |
Improvement of SyncPhy dataset [G.781]
�
R1 only adds Q14/15 as a related Question
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
� |
Q14/15, Q13/15
� |
2023-11-03 |
|
[ 676 ]
�
� |
fgOTN clock specification [G.8251]
�
� |
China Mobile Communications Co. Ltd.
,
Futurewei Technologies Inc. (United States)
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
State Grid Corporation of China
� |
Q13/15
� |
2023-11-03 |
|
[ 667 ]
�
� |
G.8271.1 follow up on SyncE transients
�
� |
Nokia Corporation (Finland)
� |
Q13/15
� |
2023-11-02 |
|
[ 666 ]
�
� |
Increasing ITU-T G.8261reference chain length compared to ITU-T G.803
�
� |
Nokia Corporation (Finland)
,
Orange (France)
� |
Q13/15
� |
2023-11-02 |
|
[ 665 ]
�
� |
ITU-T G.8275.1 instance and port enable/disable
�
� |
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
� |
Q13/15
� |
2023-11-02 |
|
[ 664 ]
�
� |
G.8275.1 clockclass value 135 duration for "within specification" holdover
�
� |
Nokia Corporation (Finland)
,
Orange (France)
,
Swisscom SA (Switzerland)
� |
Q13/15
� |
2023-11-02 |
|
[ 662 ]
�
� |
Correct processing of alternateTimeTransmitterFlag (G.8275.1)
�
� |
Nokia Corporation (Finland)
� |
Q13/15
� |
2023-11-02 |
|
[ 659 ]
�
� |
Switch port PTP T-BC port miss-match
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q13/15
� |
2023-11-01 |
|
[ 658 ]
�
� |
Mapping Ptp Profile to Network Budget
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q13/15
� |
2023-11-01 |
|
[ 657 ]
�
� |
Adjusting time when offset detected
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q13/15
� |
2023-11-01 |
|
[ 656 ]
�
� |
Suppl-FTS Editorial
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q13/15
� |
2023-11-01 |
|
[ 655 ]
�
� |
Clarification in G.8275 Annex F
�
� |
Calnex Solutions plc. (United Kingdom)
,
Telefon AB - LM Ericsson (Sweden)
� |
Q13/15
� |
2023-11-01 |
|
[ 642 ]
�
� |
G.8275.1 PTP Clock Output during frequency rearrangement
�
� |
Ciena Canada
� |
Q13/15
� |
2023-10-30 |
|
[ 641 ]
�
� |
G.8275.2 BMCA revertive mode
�
� |
Ciena Canada
� |
Q13/15
� |
2023-10-30 |
|
[ 626 ]
�
� |
PTP Only Case in ITU-T Rec. G.8273.2
�
� |
Intel Corporation (United States)
� |
Q13/15
� |
2023-10-29 |
|
[ 625 ]
�
� |
PAM4 interfaces in the clock recommendations (G.8262, G.8273.2, G.8273.3)
�
� |
Calnex Solutions plc. (United Kingdom)
� |
Q13/15
� |
2023-10-27 |
|
[ 624 ]
�
� |
FlexE interfaces in the clock recommendations (G.8273.2, G.8273.3)
�
� |
Calnex Solutions plc. (United Kingdom)
� |
Q13/15
� |
2023-10-27 |
|
[ 623 ]
�
� |
Synchronization requirements for applications connected via the 5G system (G.8271, G.8271.1)
�
� |
Calnex Solutions plc. (United Kingdom)
� |
Q13/15
� |
2023-10-27 |
|
[ 619 ]
�
� |
G.8272.2 cnPRTC phase discontinuity
�
� |
Microchip Technology Inc. (United States)
� |
Q13/15
� |
2023-10-24 |
|
[ 618 ]
�
� |
G.8272.2 cnPRTC jitter performance
�
� |
Microchip Technology Inc. (United States)
� |
Q13/15
� |
2023-10-20 |
|
[ 617 ]
�
� |
G.8272.2 Text for Appendix II
�
� |
Deutsche Telekom AG (Germany)
� |
Q13/15
� |
2023-10-20 |
|
[ 616 ]
�
(Rev.1)� |
G.8272.2 Text for Chapter 9 Interfaces
�
� |
Deutsche Telekom AG (Germany)
,
Microchip Technology Inc. (United States)
� |
Q13/15
� |
2023-10-20 |
|
[ 615 ]
�
(Rev.1)� |
G.8272.2 Text for Chapter 8 Transient response and holdover
�
� |
Deutsche Telekom AG (Germany)
,
Microchip Technology Inc. (United States)
� |
Q13/15
� |
2023-10-20 |
|
[ 614 ]
�
� |
G.8272.2 Text for Chapter 1 - Scope
�
� |
Deutsche Telekom AG (Germany)
� |
Q13/15
� |
2023-10-20 |
|
[ 611 ]
�
� |
Additional Consideration of PTP communication path on Appendix XIV of G.8275.1
�
� |
Skyworks Solutions, Inc. (United States)
� |
Q13/15
� |
2023-10-03 |
|
[ 610 ]
�
� |
Performance estimation for cascaded media converters mixing T-TC with T-BC/T-T-TSC using G.8275.1 profile
�
� |
Skyworks Solutions, Inc. (United States)
� |
Q13/15
� |
2023-10-03 |
Results:50 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):