International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2023-04-17�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2023-04-17)�

ITU-T�SG15

Transport, access and home

Study Period 2022

Meeting� from 2023-04-17 to 2023-04-28

held in Switzerland [Geneva]

Other Meetings : 2024-07-012023-11-202022-09-19

Results:57 total items.
Result page:� 1 - 2 �-�Next Next
Contributions �[�AI/Question:�Q13/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 569 ]
(Rev.1)
Initial End-to-End Network Jitter and Wander Simulation Results for sub1G CBR Transport via OSUs over ODU � Futurewei Technologies Inc. (United States) , Huawei Technologies Co., Ltd. (China) , Microchip Technology Inc. (United States) Q13/15, Q11/15 2023-04-04
[ 561 ]
OSU Hypothetical Reference Model � China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China) Q13/15, Q11/15 2023-04-04
[ 557 ]
Validation of the Principle of the Simplified OSU(CBR) Clock Solution without Low-Pass Filtering at Intermediate Nodes � China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) Q13/15, Q11/15 2023-04-04
[ 513 ]
Holdover Clock Class for G.8275.2 T-BC acting as T-GM � Ciena Canada Q13/15 2023-04-04
[ 511 ]
(Rev.1)
Modelling of generic time recovery block � China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies D�sseldorf GmbH (Germany) Q14/15, Q13/15 2023-04-04
[ 510 ]
Proposal on GNSS-PTP monitoring function � China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies D�sseldorf GmbH (Germany) , ZTE Corporation (China) Q14/15, Q13/15 2023-04-04
[ 508 ]
Proposal on enhanced accuracy TLV � China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q13/15 2023-04-04
[ 502 ]
(Rev.1-2)
PTP message delays [G.781.1] � China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) Q13/15 2023-04-04
[ 485 ]
Proposal on enhanced BMCA for path accuracy selection � China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q13/15 2023-04-04
[ 481 ]
Proposal for attributes with enumeration data type � ZTE Corporation (China) Q13/15 2023-04-04
[ 480 ]
Proposals for SyncPhy attributes � ZTE Corporation (China) Q13/15 2023-04-04
[ 476 ]
Proposal for port data set � ZTE Corporation (China) Q13/15 2023-04-04
[ 467 ]
The attribute member "PTP Enable/Disable" for PTP dataset [G.8275.1] � China Information Communication Technologies Group Q13/15 2023-04-04
[ 466 ]
Further considerations on transport layer to SD-p layer adaption functions [G.781.1] � China Information Communication Technologies Group Q13/15 2023-04-04
[ 465 ]
Proposed text of synchronization interfaces in G.781 � China Information Communication Technologies Group Q13/15 2023-04-04
[ 462 ]
PTP Network Security � Meinberg Funkuhren GmbH & Co.KG (Germany) Q13/15 2023-04-03
[ 459 ]
G.8273.2 SyncE transients for congruent networks � Nokia Corporation (Finland) Q13/15 2023-04-03
[ 455 ]
G.8275.1 Passive state using new accumulated-Time-Error ABMCA � Nokia Corporation (Finland) Q13/15 2023-04-03
[ 454 ]
G.8264 No VLAN for ESMC � Nokia Corporation (Finland) Q13/15 2023-04-03
[ 453 ]
(Rev.1)
G.8272 text for appendix: GNSS usage in PRTC � Calnex Solutions plc. (United Kingdom) , Deutsche Telekom AG (Germany) , Microchip Technology Inc. (United States) Q13/15 2023-04-03
[ 452 ]
G.8275.1 editorials � Nokia Corporation (Finland) Q13/15 2023-04-03
[ 451 ]
G.8275.1 Annex K enhancements � Nokia Corporation (Finland) Q13/15 2023-04-03
[ 449 ]
G.8275.1 Annex G enhancements � Nokia Corporation (Finland) Q13/15 2023-04-03
[ 448 ]
G.8275.1 PTSF enhancements � Nokia Corporation (Finland) Q13/15 2023-04-03
[ 446 ]
(Rev.1)
Further Verification of OSU CBR Mapping without Low-Pass Filtering at Intermediate Nodes while Preserving Traditional OTN Level of Jitter/Wander � China Mobile Communications Co. Ltd. , China Unicom , Huawei Technologies Co., Ltd. (China) , Microchip Technology Inc. (United States) , Ministry of Industry and Information Technology (MIIT) (China) Q13/15, Q11/15 2023-04-03
[ 442 ]
Telcos Experience and Challenges in Meeting Time Transfer Requirements for 5G Networks � T�rkiye Q13/15 2023-04-03
[ 441 ]
Consideration of performance monitoring � Huawei Technologies Co., Ltd. (China) Q13/15 2023-04-03
[ 440 ]
Discussion about reporting GNSS and PTP time difference [G.8275.1] � China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q13/15 2023-04-03
[ 439 ]
clockClass in locked mode (G.8275.1) � Huawei Technologies Co., Ltd. (China) Q13/15 2023-04-03
[ 438 ]
Editorial changes for G.8273.2 � Huawei Technologies Co., Ltd. (China) Q13/15 2023-04-03
[ 437 ]
A few items for G.8251 � Huawei Technologies Co., Ltd. (China) Q13/15 2023-04-03
[ 436 ]
SyncPhy dataset Proposal [G.781] � China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) Q13/15 2023-04-03
[ 435 ]
MTN/SD adaptation model [G.781] � Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q13/15, Q11/15 2023-04-03
[ 431 ]
Proposal of Performance Monitor Options [G.8275.1, G.8275.2] � NEC Corporation (Japan) Q13/15 2023-04-03
[ 373 ]
G.8272.2 cnPRTC performance � Microchip Technology Inc. (United States) Q13/15 2023-04-03
[ 372 ]
G.8272.1 ePRTC holdover appendix � Microchip Technology Inc. (United States) Q13/15 2023-04-03
[ 371 ]
G.8272.1 ePRTC holdover � Microchip Technology Inc. (United States) Q13/15 2023-04-03
[ 362 ]
Analysis of the OSU clock recovery method based on wd11-49 proposal � China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom Q13/15, Q11/15 2023-04-01
[ 357 ]
Sub1G CBR client frequency encoding and timing transparent transport over OSU networks with LPF function in intermediate nodes � China Information Communication Technologies Group , China Telecommunications Corporation Q13/15, Q11/15 2023-04-01
[ 349 ]
G.8260 text modification � Calnex Solutions plc. (United Kingdom) , Deutsche Telekom AG (Germany) , Microchip Technology Inc. (United States) Q13/15 2023-03-31
[ 344 ]
Simplified Example of CBR Mapping into OSU that Avoids Needing per Sub1G OTN Path DSP PLL Engines � Microchip Technology Inc. (United States) Q13/15, Q11/15 2023-03-31
[ 343 ]
Concept for CBR Mapping into OSU that Avoids Needing per Sub1G OTN Path DSP PLL Engines � Microchip Technology Inc. (United States) Q13/15, Q11/15 2023-03-31
[ 341 ]
(Rev.1)
Error Tolerance Considerations of the Relative Phase Offset Overhead between an OSU CBR Mapper and DeMapper Node � Microchip Technology Inc. (United States) Q13/15, Q11/15 2023-03-31
[ 334 ]
Proposal for clarifications/corrections of the PTP profiles for telecom � Telefon AB - LM Ericsson (Sweden) Q13/15 2023-03-29
[ 333 ]
Proposal for usage of enhanced accuracy TLV in G.8275.1 profile � Telefon AB - LM Ericsson (Sweden) Q13/15 2023-03-29
[ 332 ]
Proposal for an Alternate ABMCA considering the path inaccuracy in G.8275.1 profile � Telefon AB - LM Ericsson (Sweden) Q13/15 2023-03-29
[ 330 ]
Network limits in G.8271.1 based on enhanced syncE and clock class C [G.8271.1] � Calnex Solutions plc. (United Kingdom) , Huawei Technologies Co., Ltd. (China) , Nokia Corporation (Finland) Q13/15 2023-03-28
[ 328 ]
stepsRemoved for T-BC and T-BC-A with VirtualPort � Ciena Canada Q13/15 2023-03-27
[ 327 ]
Option for Performance Monitoring (G.8275, G.8275.1, G.8275.2) � Calnex Solutions plc. (United Kingdom) , Telefon AB - LM Ericsson (Sweden) Q13/15 2023-03-27
[ 326 ]
Transient response due to long term rearrangement of physical layer frequency transport: cTE component [G.8273.2] � Calnex Solutions plc. (United Kingdom) , Huawei Technologies Co., Ltd. (China) Q13/15 2023-03-22
Results:57 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10