International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2022-09-19�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2022-09-19)�

ITU-T�SG15

Transport, access and home

Study Period 2022

Meeting� from 2022-09-19 to 2022-09-30

held in Switzerland [Geneva]

Other Meetings : 2024-07-012023-11-202023-04-17

Results:21 total items.
Contributions �[�AI/Question:�Q6/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 283 ]
(Rev.1-2)
Coherent colorless flexible subcarrier allocation based PtMP topology � AT&T, Inc. (United States) Q6/15, Q2/15 2022-09-06
[ 282 ]
Single-lane OTU4 interfaces (OTL4.1) � Nokia Corporation (Finland) , Nokia USA (United States) Q6/15, Q11/15 2022-09-06
[ 268 ]
Considerations on standardizing interoperable coherent O-OFDM P2MP optical interfaces � British Telecommunications Plc. (BT Plc) (United Kingdom) , Infinera Corporation (United States) , Telecom Italia S.p.A. (Italy) , Verizon Communication Corporation (United States) Q6/15, Q2/15 2022-09-06
[ 258 ]
B400G discussion of the optics of a possible cross-digital and optical layer hitless rate adjustable OTN interface � China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China) Q6/15 2022-09-06
[ 243 ]
Amendment to G.959.1 for short-distance OTU4 interfaces of OTN � China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q6/15 2022-09-06
[ 242 ]
(Rev.1)
Automatic maintenance of optical media network � China Mobile Communications Co. Ltd. , ZTE Corporation (China) Q7/15, Q6/15, Q14/15, Q12/15 2022-09-06
[ 239 ]
(Rev.1)
Proposal to re-open G.807 to study maintenance of Optical Media Network � China Mobile Communications Co. Ltd. , China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q7/15, Q6/15, Q14/15, Q12/15 2022-09-06
[ 226 ]
(Rev.1-2)
Proposal to consider the spectrum schedule of optical fibre for ultra-high capacity optical transmission system � China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q6/15 2022-09-06
[ 224 ]
(Rev.1-2)
Proposal to consider the transmission distance beyond 450 km � China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China) Q6/15 2022-09-06
[ 219 ]
(Rev.1-2)
Discussion of the adoption of maximum spectral excursion into G.owdm2 � China Mobile Communications Co. Ltd. Q6/15 2022-09-06
[ 208 ]
(Rev.1)
Updated Proposal for G.owdm2 Specifications � China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China) , ZTE Corporation (China) Q6/15 2022-09-06
[ 198 ]
Proposal to revise G.959.1 and G.695 to add 100G per lambda based application codes for OTN application � China Unicom Q6/15 2022-09-06
[ 118 ]
Considerations for Next Generation Fronthaul � China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) Q6/15 2022-09-05
[ 84 ]
Proposal to establish a standard on the research of FSO link in 4G/5G back haul and front haul � China Unicom , Hengtong Optic-electric Co., Ltd. (China) , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China) Q6/15 2022-09-03
[ 49 ]
Impact of probabilistic constellation shaping on management/control systems � China Mobile Communications Co. Ltd. , ZTE Corporation (China) Q6/15, Q14/15, Q12/15, Q11/15 2022-09-01
[ 39 ]
B400G Coherent Point-to-Multipoint (P2MP) Requirements � China Information Communication Technologies Group , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , Infinera Corporation (United States) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China) Q6/15 2022-09-01
[ 28 ]
Proposal for remote performance monitoring of optical modules. � ADVA Optical Networking SE (Germany) , China Unicom , Lumentum (United States) , Telefon AB - LM Ericsson (Sweden) Q6/15 2022-08-30
[ 25 ]
(Rev.1)
Updated Proposal for G.owdm Specifications � Ministry of Industry and Information Technology (MIIT) (China) , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China) , ZTE Corporation (China) Q6/15 2022-08-30
[ 24 ]
Proposals�for�bit�rate�and�FEC�applied�in�G.owdm � China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) Q6/15 2022-08-30
[ 23 ]
Considerations of spectrum excursion and channel width for black link in G.owdm � China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) Q6/15 2022-08-30
[ 13 ]
Proposals�for�bit�rate�and�FEC�applied�in�G.owdm �
Duplicate of C24
China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) Q6/15 2022-08-30
Results:21 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10