International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG11 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG11� C�

ITU-T�SG11

Protocols and test specifications

Study Period 2022

Results:7 total items.
Contributions �[�Source:�SK Telecom (Korea (Rep. of))�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 394 ]
Proposed new work item on signalling requirements and architecture for artificial intelligence data centre � SK Telecom (Korea (Rep. of)) Q7/11 2024-04-16
[ 393 ]
Q.UAMS-SRA: Proposal for updating clause 3, 4, 7 and Appendix � SK Telecom (Korea (Rep. of)) Q7/11 2024-04-16
[ 323 ]
(Rev.1-2)
Q.UAMS-SRA: Proposal for adding signalling flows for reference point CA � SK Telecom (Korea (Rep. of)) Q7/11 2023-09-27
[ 322 ]
(Rev.1-2)
Q.UAMS-SRA: Proposal for updating clause 3, 4, and 7 � SK Telecom (Korea (Rep. of)) Q7/11 2023-09-27
[ 213 ]
(Rev.1)
Q.UAMS-SRA: Proposal for adding signalling flow and message format for reference point SC in clause 7 � SK Telecom (Korea (Rep. of)) Q7/11 2023-04-27
[ 212 ]
(Rev.1)
Q.UAMS-SRA: Proposal for adding signalling architecture and requirements in clause 7 � SK Telecom (Korea (Rep. of)) Q7/11 2023-04-27
[ 51 ]
(Rev.1-3)
Q.AIS-SRA: Proposal for adding signalling architecture and requirements in clause 7 � SK Telecom (Korea (Rep. of)) Q7/11 2022-06-22
Results:7 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11