International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 11 : Meeting�2022-07-06�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 11� TD�(2022-07-06)�

ITU-T�SG 11

Protocols and test specifications

Study Period 2022

Meeting� from 2022-07-06 to 2022-07-15

held in Switzerland [Geneva]

Other Meetings : 2024-05-012024-02-072023-10-102023-05-102022-12-07� [ 2022-07-06 ]�

Results:13 total items.
Temporary Documents �(GEN) �[�AI/Question:�Q5/11�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 167-GEN ]
LS/o on new work items Q.BNG-CA "Signalling requirements of virtual Broadband Network Gateway for cloud access" and Q.BNG-PUP "Signalling requirements for cloud-based control plane and pooled user plane of vBNG (Broadband Network Gateway)" [to ITU-T SG13, BBF] � ITU-T Study Group 11 Q5/11 2022-07-11
[ 166-GEN ]
LS/o on the consent of draft Recommendation ITU-T Q.3721(ex Q.BNG-P4switch) [to ITU-T SG13, BBF] � ITU-T Study Group 11 Q5/11 2022-07-11
[ 165-GEN ]
Consent - draft new Recommendation ITU-T Q.3721 (ex Q.BNG-P4switch) "Procedures for Programming Protocol-Independent Packet Processors(p4) Switch-based vBNG" (Geneva, 6-15 July 2022) � Editors Q5/11 2022-07-11
[ 164-GEN ]
Output - baseline text for a new work item Q.BNG-PUP "Signalling requirements for cloud-based control plane and pooled user plane of vBNG (Broadband Network Gateway)" (Geneva, 6-15 July 2022) � Editors Q5/11 2022-07-11
[ 163-GEN ]
Output - baseline text for a new work item Q.BNG-CA "Signalling requirements of virtual Broadband Network Gateway for cloud access" (Geneva, 6-15 July 2022) � Editors Q5/11 2022-07-11
[ 162-GEN ]
Output - draft new Recommendation ITU-T Q.CNCG-IC "Signalling requirements for intelligent control of cloud-network-converged networks gateway "(Geneva, 6-15 July 2022) � Editors Q5/11 2022-07-11
[ 160-GEN ]
Output - draft new Recommendation Q.BNG-INC "Requirements and signalling of intelligence control for the border network gateway in computing power network" (Geneva, 6-15 July 2022) � Editors Q5/11 2022-07-11
[ 136-GEN ]
A.5 justification information for draft new Q.BNG-P4switch "Procedures for Programming Protocol-Independent Packet Processors(p4) Switch-based vBNG" � Editors Q5/11 2022-06-27
[ 109-GEN ]
(Rev.1)
Draft Report of Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (Geneva, 6-15 July 2022) � Chairman WP1/11 Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2022-05-27
[ 99-GEN ]
(Rev.1)
Draft Report of Q5/11 meeting "Signalling requirements and protocols for border network gateway in the context of network virtualization and intelligentization" (Geneva, 6-15 July 2022) � Rapporteur Q5/11 Q5/11 2022-05-27
[ 90-GEN ]
Draft agenda for Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (Geneva, 6-15 July 2022) � Chairman WP1/11 Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2022-05-27
[ 80-GEN ]
Draft agenda for Q5/11 meeting "Signalling requirements and protocols for border network gateway in the context of network virtualization and intelligentization" (Geneva, 6-15 July 2022) � Rapporteur Q5/11 Q5/11 2022-05-27
[ 54-GEN ]
LS/i on new work item - Technical Report: Security consideration of collaboration of multiple computing power networks [from ITU-T SG17] � ITU-T Study Group 17 Q7/11, Q5/11, Q4/11 2022-05-25
Results:13 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10