Contributions
�[�Source:�ZTE Corporation (China)�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 589 ]
�
(Rev.1)� |
Proposed second draft of ITU-T K.emc_satellite "Electromagnetic compatibility requirements and test methods for satellite communication terminal equipment"
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q4/5
� |
2024-06-04 |
|
[ 587 ]
�
(Rev.1)� |
New technical report proposal on L.TR_GLC_manufacturing "General principles for the evaluation of green and low-carbon ICT manufacturing enterprises"
�
� |
China Mobile Communications Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q7/5
� |
2024-06-04 |
|
[ 538 ]
�
� |
Draft K.Suppl_tov "Protection of ICT equipment with DC power supply against transient overvoltage(TOV)"
�
� |
China Unicom
,
ZTE Corporation (China)
� |
Q2/5
� |
2024-06-04 |
|
[ 537 ]
�
� |
Proposed new ITU-T Technical Report on K.TR.RIS_EMC "Electromagnetic compatibility requirements and measurement methods for Reconfigurable Intelligent Surface"
�
� |
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q4/5
� |
2024-06-04 |
|
[ 533 ]
�
� |
Discussion on lightning surge test level of Ethernet port on K.21
�
� |
ZTE Corporation (China)
� |
Q2/5
� |
2024-06-04 |
|
[ 529 ]
�
� |
Proposed new work item on ITU-T L.CFA_BSE "Guidelines for Carbon Footprint Assessment of 5G Base Station Equipment"
�
� |
China Unicom
,
ZTE Corporation (China)
� |
Q9/5
� |
2024-06-04 |
|
[ 512 ]
�
� |
Updated baseline text of draft Recommendation of ITU-T L.soft_ES "The functional requirements and test methods of software energy-saving for 5G network"
�
� |
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
ZTE Corporation (China)
� |
Q6/5
� |
2024-06-03 |
|
[ 394 ]
�
� |
Proposed first draft of ITU-T K.emc_satellite "Electromagnetic compatibility requirements and test methods for satellite communication terminal equipment"
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q4/5
� |
2023-10-30 |
|
[ 356 ]
�
� |
Proposed new work item on K.repeater "Electromagnetic compatibility requirements and measurement methods for NR repeater"
�
� |
China Information Communication Technologies Group
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q4/5
� |
2023-10-25 |
|
[ 355 ]
�
� |
Discussion on insulation test requirement of Ethernet
�
� |
ZTE Corporation (China)
� |
Q2/5
� |
2023-10-25 |
|
[ 304 ]
�
� |
Proposed new work item on ITU-T K.satelite"Electromagnetic compatibility requirements and test methods for satellite communication terminal equipment"
�
� |
China Information Communication Technologies Group
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q4/5
� |
2023-05-31 |
|
[ 265 ]
�
� |
Draft Recommendation ITU-T K.93 "Immunity of home network devices to electromagnetic disturbances"
�
� |
ZTE Corporation (China)
� |
Q4/5
� |
2023-05-30 |
|
[ 263 ]
�
� |
Proposed new work item on revising ITU-T K.93 "Immunity of home network devices to electromagnetic disturbances"
�
� |
ZTE Corporation (China)
� |
Q4/5
� |
2023-05-30 |
|
[ 260 ]
�
� |
Proposed new work item on revising K.21 "Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents"
�
� |
ZTE Corporation (China)
� |
Q2/5
� |
2023-05-30 |
|
[ 259 ]
�
� |
Proposed new work item on revising K.20 "Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents"
�
� |
ZTE Corporation (China)
� |
Q2/5
� |
2023-05-30 |
|
[ 214 ]
�
� |
Updated Baseline text of draft Recommendation of L.5G_sharing-"Specification of 5G network sharing and co-construction adapting to climate change mitigation"
�
� |
China Telecommunications Corporation
,
ZTE Corporation (China)
� |
Q12/5
� |
2023-05-25 |
|
[ 63 ]
�
� |
Discussion on conducted emission limit from 9 kHz to 150 kHz
�
� |
ZTE Corporation (China)
� |
Q4/5
� |
2022-06-08 |
|
[ 39 ]
�
(Rev.1)� |
Proposal on Creation of new Question " Green and Low-carbon Deployment and Operation for Information and Communication Network"
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
QALL/5
� |
2022-06-07 |
Results:18 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):