International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG05 : Meeting�2024-06-17�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG05� C�(2024-06-17)�

ITU-T�SG05

EMF, environment, climate action, sustainable digitalization, and circular economy

Study Period 2022

Meeting� from 2024-06-17 to 2024-06-21

held in Poland [Wroclaw]

Other Meetings : 2023-11-132023-06-132023-02-092022-12-052022-10-172022-06-21

Results:18 total items.
Contributions �[�AI/Question:�Q6/5�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 601 ]
(Rev.1)
Proposals for draft Supplement ITU-T L.Sup.MDEE "Study of Multi-dimensional network energy efficiency metrics" � Huawei Technologies Co., Ltd. (China) , Huawei Technologies D�sseldorf GmbH (Germany) Q6/5 2024-06-04
[ 600 ]
(Rev.1)
Proposals for draft new Recommendation ITU-T L.FNEE "Assessment of Fixed Network Energy Efficiency" � Huawei Technologies D�sseldorf GmbH (Germany) , Huawei Technologies Co., Ltd. (China) Q6/5 2024-06-04
[ 599 ]
Proposal for draft new Recommendation L.Cooling_DC - "Guidelines on the selection of cooling technologies for data centres in multiple scenarios" � Huawei Technologies D�sseldorf GmbH (Germany) Q6/5 2024-06-04
[ 598 ]
Proposals for draft revised Recommendation ITU-T L.1310rev "Energy efficiency metrics and measurement methods for telecommunication equipment" � Cisco Systems, Inc. (United States) , Huawei Technologies Co., Ltd. (China) , Telefon AB - LM Ericsson (Sweden) Q6/5 2024-06-04
[ 597 ]
(Rev.1)
Proposed new work item on "Design of Sustainable AI-based and XR-based Systems" � Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT (Italy) , Huawei Technologies Co., Ltd. (China) , Huawei Technologies D�sseldorf GmbH (Germany) , Telecom Italia S.p.A. (Italy) Q6/5 2024-06-04
[ 593 ]
(Rev.1)
Proposal Baseline text of draft Recommendation ITU-T L.MCI_BAT: "Monitoring and control interface for infrastructure equipment (Power, Cooling and environment systems used in telecommunication networks) - Battery system with integrated control and monitoring information model � Huawei Technologies Co., Ltd. (China) , Huawei Technologies D�sseldorf GmbH (Germany) Q6/5 2024-06-04
[ 582 ]
Proposal on First draft of Technical Report work item ITU-T L.TR_TA_GC "Testing and Assessment method of Green Computing Power" � Ministry of Industry and Information Technology (MIIT) (China) Q6/5 2024-06-04
[ 572 ]
Proposed first draft of Recommendation ITU-T L.MM_Computing power: "Computing power efficiency matrix and measurement methodology" � Ministry of Industry and Information Technology (MIIT) (China) Q6/5 2024-06-04
[ 566 ]
(Rev.1)
Proposal Baseline text of draft Recommendation ITU-T L.MCI_MIM: "Monitoring and Control Interface for Infrastructure Equipment (Power, Cooling and Building Environment Systems used in Telecommunication Networks) - ICT equipment power, energy and environmental parameters monitoring information model" � Huawei Technologies Co., Ltd. (China) , Huawei Technologies D�sseldorf GmbH (Germany) Q6/5 2024-06-04
[ 535 ]
(Rev.1)
Modification for ITU-T L.IEDL "Energy saving strategy for deep learning computing" � China Telecommunications Corporation , China Unicom , State Grid Corporation of China Q6/5 2024-06-04
[ 516 ]
(Rev.1)
Proposal Baseline draft Recommendation ITU-T L.MCI_Gen: "Monitoring and Control Interface for Infrastructure Equipment (Power, Cooling and Building Environment Systems used in Telecommunication Networks) - Generic Interface" � Huawei Technologies D�sseldorf GmbH (Germany) , Huawei Technologies Co., Ltd. (China) Q6/5 2024-06-03
[ 514 ]
A method for evaluating energy efficiency of RAN equipment to L.Sup.MDEE � China Telecommunications Corporation Q6/5 2024-06-03
[ 512 ]
Updated baseline text of draft Recommendation of ITU-T L.soft_ES "The functional requirements and test methods of software energy-saving for 5G network" � China Mobile Communications Co. Ltd. , China Telecommunications Corporation , ZTE Corporation (China) Q6/5 2024-06-03
[ 509 ]
Draft new Recommendation L.Cooling_DC - "Guidelines on the selection of cooling technologies for data centres in multiple scenarios" for consent � China Telecommunications Corporation Q6/5 2024-06-03
[ 489 ]
Proposed new work item L.DLEE "Deep Learning Computation Efficiency Evaluation framework and metrics" � China Telecommunications Corporation , China Unicom , State Grid Corporation of China Q6/5 2024-05-31
[ 483 ]
The latest updated draft Recommendation ITU-T L.FEMS "Reference Model of Factory Energy Management System" for consent � Korea (Rep. of) Q6/5 2024-05-30
[ 478 ]
(Rev.1-3)
Proposed new ITU-T technical report on L.EMDNS "Measurement methods for energy consumption of the Domain Name System in distributed data centres" � Afnic (France) Q6/5 2024-05-29
[ 469 ]
(Rev.1)
Proposed first baseline text of draft revised Recommendation L.1331rev "Assessment of mobile network energy efficiency" � Telecom Italia S.p.A. (Italy) Q6/5 2024-05-17
Results:18 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-24