International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 2 : Meeting�2022-05-16�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 2� TD-PLEN�(2022-05-16)�

ITU-T�SG 2

Operational aspects

Study Period 2022

Meeting� from 2022-05-16 to 2022-05-20

held in Switzerland [Geneva]

Other Meetings : 2024-06-192024-03-112023-11-082023-03-13� [ 2022-05-16 ]�

Results:19 total items.
Temporary Documents �(PLEN) �[�AI/Question:�Q5/2�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 109-PLEN ]
Revised baselline text for M.rfmls: Management Requirements for Federated Machine Learning Systems � Editor, M.rfmls Q5/2 2022-05-18
[ 108-PLEN ]
Revised baseline text for M.rrsp: Requirements for robot-based on-site smart patrol of telecommunication network � Editor, M.rrsp Q5/2 2022-05-18
[ 89-PLEN ]
Revised baseline text for M.rmbs: Requirements for management of blockchain system � Editor, M.rmbs Q5/2 2022-05-17
[ 88-PLEN ]
Revised baseline text for M.rla-AI: Requirements for Log Analysis in telecom management with AI � Editor, M.rla-AI Q5/2 2022-05-17
[ 87-PLEN ]
Revised baseline text for M.rmnoc-AI: Requirements for the management of network operation cost within AITOM in telecom operational aspects � Editor, M.rmnoc-AI Q5/2 2022-05-17
[ 83-PLEN ]
Proposed new work item: Requirements for Optical Distribution Frame (ODF) On-Site Smart Maintenance � Rapporteur, Q5/2 Q5/2 2022-05-17
[ 82-PLEN ]
(Rev.1)
Proposed new work item M.rcpnm: Requirements for Computing Power Network Management � Rapporteur, Q5/2 Q5/2 2022-05-17
[ 81-PLEN ]
Proposed new work item M.rsmca: Requirements for smart maintenance of cell antenna � Rapporteur, Q5/2 Q5/2 2022-05-17
[ 80-PLEN ]
Proposed new work item M.rsca : Requirements for smart comprehensive analysis with AITOM � Rapporteur, Q5/2 Q5/2 2022-05-17
[ 79-PLEN ]
(Rev.1-2)
Revised baseline text for M.3382 (M.rwop-AI): "Requirements for work orders processing in telecom management with AI" (for consent) � Editor, M.rwop-AI Q5/2 2022-05-17
[ 53-PLEN ]
Meeting Report of Q5/2 (16 March 2022) � Rapporteur, Q5/2 Q5/2 2022-03-21
[ 52-PLEN ]
Revised baseline text for M.rmnoc-AI: "Requirements for the management of network operation cost within AITOM in telecom operational aspects" � Editor, M.rmnoc-AI Q5/2 2022-03-21
[ 44-PLEN ]
Revised baseline text for M.rla-AI "Requirements for Log Analysis with AI-enhanced Management System" (output of Q5/2 e-meeting, 22 February 2022) � Editor, rla-AI Q5/2 2022-03-21
[ 43-PLEN ]
Meeting Report for Question 5/2 (virtual, 22 February 2022) � Rapporteur, Q5/2 Q5/2 2022-03-21
[ 31-PLEN ]
(Rev.1-2)
Telecommunications management and OAM project plan � Rapporteur, Q5/2 Q5/2 2022-03-21
[ 30-PLEN ]
(Rev.1-4)
Draft report for the Question 5/2 meeting (Geneva, 16-20 May 2022) � Rapporteur, Q5/2 Q5/2 2022-03-21
[ 29-PLEN ]
(Rev.1)
Draft report for the Working Party 2/2 meeting (Geneva, 16-20 May 2022) � Chairman, WP2/2 Q7/2, Q6/2, Q5/2 2022-03-21
[ 28-PLEN ]
(Rev.1)
Draft agenda for the Question 5/2, 6/2 and 7/2 meetings, including Working Party 2/2 (Geneva, 16-20 May 2022) � Chairman, WP2/2 Q7/2, Q6/2, Q5/2 2022-03-21
[ 17-PLEN ]
(Rev.1)
Work Programme for Question 5/2 � TSB Q5/2 2022-03-15
Results:19 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25