International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Reports� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� R�

ITU-T�SG 15

Transport, access and home

Study Period 2017

Results:35 total items.
Reports��Documents / Contributions

Number
Title Source AI/Question
Date
[ 35 ]
Report of Working Party 3/15, Transport network characteristics (E-meeting, 6-17 December 2021) � Study Group 15 Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2022-01-31
[ 34 ]
Report of Working Party 2/15, Optical technologies and physical infrastructures (E-meeting, 6-17 December 2021) � Study Group 15 Q8/15, Q6/15, Q5/15, Q16/15 2022-01-31
[ 33 ]
Report of Working Party 1/15, Transport aspects of access, home and smart grid networks (E-meeting, 6-17 December 2021) � Study Group 15 Q4/15, Q2/15, Q18/15, Q1/15 2022-01-31
[ 32 ]
Report of the eighth meeting of Study Group 15, Networks, Technologies, and Infrastructure for Transport, Access and Home (E-meeting, 6-17 December 2021) � Study Group 15 QALL/15 2022-01-31
[ 31 ]
Report of Working Party 3/15, Transport network characteristics (E-meeting, 12-23 April 2021) � Study Group 15 Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2021-06-10
[ 30 ]
Report of Working Party 2/15, Optical technologies and physical infrastructures (E-meeting, 12-23 April 2021) � Study Group 15 Q8/15, Q6/15, Q5/15, Q16/15 2021-06-10
[ 29 ]
Report of Working Party 1/15, Transport aspects of access, home and smart grid networks (E-meeting, 12-23 April 2021) � Study Group 15 Q4/15, Q2/15, Q18/15, Q1/15 2021-06-10
[ 28 ]
Report of the seventh meeting of Study Group 15, Networks, Technologies, and Infrastructure for Transport, Access and Home (E-meeting, 12-23 April 2021) � Study Group 15 QALL/15 2021-06-10
[ 27 ]
Report of Working Party 3/15, Transport network characteristics (E-meeting, 7-18 September 2020) � Study Group 15 Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2020-11-12
[ 26 ]
Report of Working Party 2/15, Optical technologies and physical infrastructures (E-meeting, 7-18 September 2020) � Study Group 15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2020-11-12
[ 25 ]
Report of Working Party 1/15, Transport aspects of access, home and smart grid networks (E-meeting, 7-18 September 2020) � Study Group 15 Q4/15, Q2/15, Q18/15, Q15/15, Q1/15 2020-11-12
[ 24 ]
Report of the sixth meeting of Study Group 15, Networks, Technologies, and Infrastructure for Transport, Access and Home ((E-meeting, 7-18 September 2020) � Study Group 15 QALL/15 2020-11-12
[ 23 ]
Report of Working Party 3/15, Transport network characteristics (Geneva, 27 January-7 February 2020) � Study Group 15 Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2020-03-12
[ 22 ]
Report of Working Party 2/15, Optical technologies and physical infrastructures (Geneva, 27 January-7 February 2020) � Study Group 15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2020-03-12
[ 21 ]
Report of Working Party 1/15, Transport aspects of access, home and smart grid networks (Geneva, 27 January-7 February 2020) � Study Group 15 Q4/15, Q2/15, Q18/15, Q15/15, Q1/15 2020-03-12
[ 20 ]
Report of the fifth meeting of Study Group 15, Networks, Technologies, and Infrastructure for Transport, Access and Home (Geneva, 27 January-7 February 2020) � Study Group 15 QALL/15 2020-03-12
[ 19 ]
Determined draft Amendment 3 to Recommendation ITU-T G.9964 � Study Group 15 Q18/15 2019-07-22
[ 18 ]
Determined draft new Recommendation ITU-T G.9710 (ex. G.mgfast-PSD) � Study Group 15 Q4/15 2019-07-22
[ 17 ]
Report of Working Party 3/15, Transport network characteristics (Geneva, 1-12 July 2019) � Study Group 15 Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2019-07-22
[ 16 ]
Report of Working Party 2/15, Optical technologies and physical infrastructures (Geneva, 1-12 July 2019) � Study Group 15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2019-07-22
[ 15 ]
Report of Working Party 1/15, Transport aspects of access, home and smart grid networks (Geneva, 1-12 July 2019) � Study Group 15 Q4/15, Q2/15, Q18/15, Q15/15, Q1/15 2019-07-22
[ 14 ]
+Add.1
Report of the fourth meeting of Study Group 15, networks, technologies and infrastructures for transport, access and home (Geneva, 1-12 July 2019) � Study Group 15 QALL/15 2019-07-22
[ 13 ]
Determined draft revised Recommendation ITU-T G.9700, "Fast access to subscriber terminals (G.fast) - Power spectral density specification" � Study Group 15 Q4/15 2018-11-15
[ 12 ]
Report of Working Party 3/15, Transport network characteristics (Geneva, 8-19 October 2018) � Study Group 15 Q9/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2018-11-15
[ 11 ]
Report of Working Party 2/15, Optical technologies and physical infrastructures (Geneva, 8-19 October 2018) � Study Group 15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2018-11-15
[ 10 ]
Report of Working Party 1/15, Transport aspects of access, home and smart grid networks (Geneva, 8-19 October 2018) � Study Group 15 Q4/15, Q2/15, Q18/15, Q15/15, Q1/15 2018-11-15
[ 9 ]
+Add.1
Report of the third meeting of Study Group 15, networks, technologies and infrastructures for transport, access and home (Geneva, 8-19 October 2018) � Study Group 15 QALL/15 2018-11-15
[ 8 ]
Report of Working Party 3/15, Transport network characteristics (Geneva, 29 January-9 February 2018) � Study Group 15 Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2018-03-14
[ 7 ]
Report of Working Party 2/15, Optical technologies and physical infrastructures (Geneva, 29 January - 9 February 2018) � Study Group 15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2018-03-14
[ 6 ]
Report of Working Party 1/15, Transport aspects of access, home and smart grid networks (Geneva, 29 January - 9 February 2018) � Study Group 15 Q4/15, Q2/15, Q19/15, Q18/15, Q15/15, Q1/15 2018-03-14
[ 5 ]
+Add.1
Report of the second meeting of Study Group 15, networks, technologies and infrastructures for transport, access and home (Geneva, 29 January-9 February 2018) � Study Group 15 QALL/15 2018-03-14
[ 4 ]
Report of Working Party 3/15, Transport network characteristics (Geneva, 19-30 June 2017) � Study Group 15 Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2017-07-14
[ 3 ]
Report of Working Party 2/15, Optical technologies and physical infrastructures (Geneva, 19-30 June 2017) � Study Group 15 Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15 2017-07-14
[ 2 ]
Report of Working Party 1/15, Transport aspects of access, home and smart grid networks (Geneva, 19-30 June 2017) � Study Group 15 Q4/15, Q2/15, Q19/15, Q18/15, Q15/15, Q1/15 2017-07-14
[ 1 ]
Report of the first meeting of Study Group 15, Optical transport networks and access network infrastructures (Geneva, 19-30 June 2017) � Study Group 15 QALL/15 2017-07-14
Results:35 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2022-01-31