Contributions
�[�AI/Question:�Q2/15�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2862 ]
�
� |
G.sup.slicing: General text on end-to-end network slicing
�
� |
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Switzerland
,
Maxlinear Inc (United States)
� |
Q2/15
� |
2021-11-23 |
|
[ 2860 ]
�
� |
G.9804: Flex-rate PON Downstream
�
� |
Nokia Corporation (Finland)
� |
Q2/15
� |
2021-11-23 |
|
[ 2858 ]
�
� |
G.988: An issue with references to PON Recommendations
�
� |
Maxlinear Inc (United States)
� |
Q2/15
� |
2021-11-23 |
|
[ 2830 ]
�
� |
G.9806 Higher Speed BiDi options
�
� |
Futurewei Technologies US R&D Center (United States)
� |
Q2/15
� |
2021-11-23 |
|
[ 2827 ]
�
(Rev.1)� |
G.sup.slicing Slicing Framework
�
� |
Futurewei Technologies US R&D Center (United States)
� |
Q2/15, Q12/15, Q11/15
� |
2021-11-23 |
|
[ 2826 ]
�
� |
Clarification of scope of ITU-T Rec. Series G Supplement Slicing
�
� |
Nokia Corporation (Finland)
,
Oki Electric Industry Company Ltd. (OKI) (Japan)
,
Vodafone Group Services Ltd (United Kingdom)
� |
Q2/15
� |
2021-11-23 |
|
[ 2819 ]
�
(Rev.1)� |
Miscellaneous updates for ITU-T Rec. Series G Supplement Slicing
�
� |
Nokia Corporation (Finland)
� |
Q2/15
� |
2021-11-23 |
|
[ 2818 ]
�
� |
Proposal to new ITU-T G.Sup.XRP "Passive optical network supporting extended reality service"
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Nokia Shanghai Bell Co. Ltd. (China)
,
ZTE Corporation (China)
� |
Q2/15
� |
2021-11-23 |
|
[ 2817 ]
�
� |
Proposal to new ITU-T G.Sup.eOLT " Enhanced optical line termination integrated with IT technology"
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Nokia Shanghai Bell Co. Ltd. (China)
,
ZTE Corporation (China)
� |
Q2/15
� |
2021-11-23 |
|
[ 2797 ]
�
� |
WRP management Ad-hoc progress
�
� |
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center (United States)
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
,
Maxlinear Inc (United States)
,
Orange (France)
,
ZTE Corporation (China)
� |
Q2/15
� |
2021-11-23 |
|
[ 2795 ]
�
� |
General description of slicing requirements for PON
�
� |
Vodafone Group Services Ltd (United Kingdom)
� |
Q2/15
� |
2021-11-23 |
|
[ 2778 ]
�
� |
Considerations on the semi-active WDM architecture for G.9802
�
� |
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
,
ZTE Corporation (China)
� |
Q2/15
� |
2021-11-23 |
|
[ 2760 ]
�
� |
Proposal of a new supplement on latency control and deterministic capability of ITU-T PON system
�
� |
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Nokia Corporation (Finland)
,
ZTE Corporation (China)
� |
Q2/15
� |
2021-11-23 |
|
[ 2721 ]
�
� |
CEx Penalty vs Crosstalk ratio Figure correction
�
� |
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q2/15
� |
2021-11-22 |
|
[ 2720 ]
�
� |
HSP 50G Upstream Link Simulations
�
� |
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q2/15
� |
2021-11-22 |
|
[ 2719 ]
�
� |
XG(S)-PON Out-of-Band PSD Specification
�
� |
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q2/15
� |
2021-11-22 |
|
[ 2701 ]
�
� |
Proposal of requirements for slicing in PON-based optical access networks
�
� |
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2021-11-22 |
|
[ 2665 ]
�
� |
OMCI mutual authentication enhancement
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2021-11-22 |
|
[ 2664 ]
�
� |
XG(S)-PON OOB crosstalk on GPON system
�
� |
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q2/15
� |
2021-11-22 |
|
[ 2650 ]
�
� |
Proposal on End-to-end Optical Network Slice Management
�
� |
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q2/15, Q14/15, Q12/15, Q11/15
� |
2021-11-21 |
|
[ 2649 ]
�
� |
Optical Network Slice: Review on Previous Work and Gap Analysis
�
� |
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q2/15, Q12/15, Q11/15
� |
2021-11-21 |
|
[ 2642 ]
�
� |
Slicing Use case in Industrial PON Scenario
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2021-11-19 |
|
[ 2641 ]
�
� |
Relationship between OMA, penalty, ER, and AVP for 50G downstream
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2021-11-19 |
|
[ 2640 ]
�
� |
CEx Isolation Equation Text for G.9805
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q2/15
� |
2021-11-19 |
|
[ 2639 ]
�
(Rev.1)� |
Proposed values for Isolation and Directivity for a generic 2-port CEx in G.9805
�
� |
British Telecommunications Public Ltd. Co. (BT Plc) (United Kingdom)
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies D�sseldorf GmbH (Germany)
� |
Q2/15
� |
2021-11-19 |
|
[ 2637 ]
�
� |
Use case for multi-service slices of VNOs
�
� |
ZTE Corporation (China)
� |
Q2/15
� |
2021-11-19 |
|
[ 2630 ]
�
� |
Revision of Figure 7-7-a of optical coherent detection technique with multi-tone local light in G Suppl.55 Rev1
�
� |
National Institute of Information and Communications Technology (NICT) (Japan)
� |
Q2/15
� |
2021-11-19 |
|
[ 2619 ]
�
� |
G.Sup45 Rev proposed guidelines for OLT power savings
�
� |
Orange (France)
� |
Q2/15
� |
2021-11-15 |
|
[ 2615 ]
�
� |
Text proposal for Annex A of G.9803 Amd.2
�
� |
KDDI Corporation (Japan)
,
National Institute of Information and Communications Technology (NICT) (Japan)
� |
Q2/15
� |
2021-11-12 |
Results:29 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):