International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2018-10-08�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2018-10-08)�

ITU-T�SG 15

Transport, access and home

Study Period 2017

Meeting� from 2018-10-08 to 2018-10-19

held in Switzerland [Geneva]

Other Meetings : 2021-12-062021-04-122020-09-072020-01-272019-07-012018-01-292017-06-19

Results:16 total items.
Contributions �[�Source:�Orange (France)�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1133 ]
(Rev.1)
FEC for 200G/300G/400G FlexO-L � Acacia Communications, Inc (United States) , AT&T, Inc. (United States) , Cisco Systems, Inc. (United States) , Coriant GmbH & Co. KG (Germany) , Deutsche Telekom AG (Germany) , Juniper Networks (United States) , Nippon Telegraph and Telephone Corporation (NTT) (Japan) , Orange (France) Q11/15 2018-09-25
[ 1132 ]
(Rev.1)
300G FlexO-LR � Acacia Communications, Inc (United States) , AT&T, Inc. (United States) , Cisco Systems, Inc. (United States) , Coriant GmbH & Co. KG (Germany) , Deutsche Telekom AG (Germany) , Juniper Networks (United States) , Nippon Telegraph and Telephone Corporation (NTT) (Japan) , Orange (France) Q11/15 2018-09-25
[ 1062 ]
Proposal for failure scenarios of fronthaul network [G.8271.1] � Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , Orange (France) Q13/15 2018-09-25
[ 1061 ]
Proposal for PTP function of PRTC-B and eRPTC � China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , Orange (France) Q13/15 2018-09-25
[ 934 ]
G.8275 Fronthaul Architectures � Orange (France) Q13/15 2018-09-24
[ 933 ]
G.8271 Synchronization requirements for Inter-operator TDD operation � Orange (France) Q13/15 2018-09-24
[ 932 ]
G.8271: GNSS extended status message � Orange (France) Q13/15 2018-09-24
[ 931 ]
Measurement of Relative Time Error (TER) : G.8271.1 Appendix XI � Orange (France) Q13/15 2018-09-24
[ 930 ]
Text modification to G.8271.1 Appendix VII � Orange (France) Q13/15 2018-09-24
[ 929 ]
Fronthaul Architectures and Network Budgeting, G.8271.1 Appendix � Orange (France) Q13/15 2018-09-24
[ 928 ]
G.8272: Refinement of duplicated text in Appendix I (I.1) and Clause 6.1. � Orange (France) Q13/15 2018-09-24
[ 927 ]
G.8271 Table II.2: 5G Phase and Time requirements update � Orange (France) Q13/15 2018-09-24
[ 926 ]
(Rev.1)
G.8271.1 Appendix: Phase and Time sync requirements for fronthaul transport � Orange (France) Q13/15 2018-09-24
[ 925 ]
G.8271: Synchronization requirements for E-UTRA-NR Dual Connectivity � Orange (France) , Huawei Technologies Co., Ltd. (China) Q13/15 2018-09-24
[ 810 ]
Defining relative time error [G.8260] � Calnex Solutions Limited (United Kingdom) , Nokia Corporation (Finland) , Orange (France) Q13/15 2018-09-20
[ 749 ]
(Rev.1)
T-BC Class C/D performance specification for G.8273.2 � A1 Telekom Austria AG , China Mobile Communications Corporation , Deutsche Telekom AG (Germany) , Orange (France) Q13/15 2018-09-02
Results:16 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10