Contributions
�[�AI/Question:�Q13/15�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 398 ]
�
� |
Comparison of PTP Monitoring Options of Annex G [G.8275.1]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 388 ]
�
� |
PLL Convergence of Unmonitored Connection: Start-Up or Switching [G.8275.1, G.8273.2]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 366 ]
�
� |
Impact of Timestamp Processing Delay [G.8275.1]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 354 ]
�
� |
G.8273.1 T-GM interfaces
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 353 ]
�
� |
G.8272 amendment number
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 352 ]
�
� |
ePRC phase discontinuity requirement
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 348 ]
�
(Rev.1)� |
GNSS document introduction
�
� |
Nokia Corporation
� |
Q13/15
� |
2017-06-06 |
|
[ 339 ]
�
� |
Misc Profile Clean-Up [G.8275.1]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 335 ]
�
� |
Alternate Master Time Information: Use Description [G.8275.1]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 333 ]
�
� |
Alternate Master Time Information: Splitting PASSIVE & MASTER/SLAVE [G.8275.1]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 331 ]
�
� |
Network Limits & Usefulness of Alignment [G.8271.2]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 329 ]
�
� |
Enhanced Holdover Reporting T-TSC-P &T-TSC-A [G.8275.2]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 328 ]
�
� |
Mapping clockClass to QL [G.8275.1, G.8275.2]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 327 ]
�
� |
PTP states [G.810, G.syncOAM]
�
� |
Microsemi Corporation (United States)
� |
Q13/15
� |
2017-06-06 |
|
[ 324 ]
�
� |
G.8271: Time-of-Day Checksum Field
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2017-06-06 |
|
[ 309 ]
�
� |
T-TC residence time measurement
�
� |
Huawei Technologies Co., Ltd. (China)
,
CAICT
,
MITT
� |
Q13/15
� |
2017-06-06 |
|
[ 307 ]
�
� |
Resolving GNSS Errors- WD_GNSS
�
� |
Orange (France)
� |
Q13/15
� |
2017-06-06 |
|
[ 306 ]
�
� |
Revision of structure/format of "Appendix for GNSS receiver usage"document
�
� |
Nokia USA
,
Orange (France)
� |
Q13/15
� |
2017-06-06 |
|
[ 305 ]
�
� |
Text clarifications on the clause "Short-term interruption" in G.8262/G.8262.1
�
� |
Calnex Solutions Limited
,
Orange (France)
� |
Q13/15
� |
2017-06-06 |
|
[ 304 ]
�
� |
Study of PTP transients in congruent/non-congruent scenario
�
� |
Orange (France)
� |
Q13/15
� |
2017-06-06 |
|
[ 303 ]
�
� |
Fronthaul network reference model
�
� |
Orange (France)
� |
Q13/15
� |
2017-06-06 |
|
[ 302 ]
�
� |
Fronthaul synchronization requirements
�
� |
Orange (France)
� |
Q13/15
� |
2017-06-06 |
|
[ 301 ]
�
� |
Impact of functional splits on synchronization requirements
�
� |
Orange (France)
� |
Q13/15
� |
2017-06-06 |
|
[ 300 ]
�
� |
APTS scenarios in 8271.2 and 8273.4
�
� |
Nokia Corporation
� |
Q13/15
� |
2017-06-06 |
|
[ 294 ]
�
(Rev.1-2)� |
Frequency Amplitude Estimation Method for G.8273.2 Appendix VI
�
� |
Calnex Solutions Limited
,
RAD Data Communications, Ltd.
� |
Q13/15
� |
2017-06-06 |
|
[ 289 ]
�
+Corr.1� |
Comments and Proposals for G.8273.2 Appendix VI Choice of Frequencies for Measuring Noise Transfer
�
� |
RAD Data Communications, Ltd.
� |
Q13/15
� |
2017-06-06 |
|
[ 271 ]
�
+Corr.1� |
Editorial Comments on G.8275.1
�
� |
RAD Data Communications, Ltd.
� |
Q13/15
� |
2017-06-06 |
|
[ 270 ]
�
+Corr.1� |
Editorial Comments on G.8275.2
�
� |
RAD Data Communications, Ltd.
� |
Q13/15
� |
2017-06-06 |
|
[ 269 ]
�
� |
Consideration on frequency selection and frequency recovery for the G.8273.2 noise transfer test
�
� |
China Unicom
� |
Q13/15
� |
2017-06-06 |
|
[ 268 ]
�
� |
Clarification on WD39 of Shanghai meeting
�
� |
China Unicom
,
ZTE Corporation (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 264 ]
�
� |
Monitoring Time Offset in PTP Connections [G.8275.1, G.Suppl.SyncOAM]
�
� |
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 263 ]
�
� |
PDV noise tolerance test of G.8263
�
� |
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
� |
Q13/15
� |
2017-06-06 |
|
[ 262 ]
�
� |
Title revision of Q13 recommendation
�
� |
Orange (France)
,
CAICT
,
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 261 ]
�
� |
Network limit of G.8271.2
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 260 ]
�
� |
Cable delay effects and correction in a GNSS receiver
�
� |
Nokia Corporation
� |
Q13/15
� |
2017-06-06 |
|
[ 259 ]
�
� |
Initial PTP simulation Results for HRMs containing eEECs, ePRTCs, and Class C T-BCs
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 258 ]
�
(Rev.1)� |
5G Sync Requirement [G.8271]
�
� |
Orange (France)
,
CAICT
,
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
MITT
� |
Q13/15
� |
2017-06-06 |
|
[ 257 ]
�
� |
Proposals for G.781 to address remaining items prior to planned consent [G.781]
�
� |
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 256 ]
�
� |
Clarification of T-TSC specification
�
� |
Huawei Technologies Co., Ltd. (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 255 ]
�
� |
T-TC residence time proposal
�
� |
Huawei Technologies Co., Ltd. (China)
,
CAICT
,
MITT
� |
Q13/15
� |
2017-06-06 |
|
[ 243 ]
�
(Rev.1)� |
Effect of thermal ramps on phase accuracy for APTS and PTS implementations
�
� |
Nokia Corporation
� |
Q13/15
� |
2017-06-06 |
|
[ 235 ]
�
� |
Considerations on Mobile Fronthaul and 5G Transport
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q13/15, Q11/15
� |
2017-06-06 |
|
[ 234 ]
�
� |
Editorial proposals for G.8271.1 Appendix VIII
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q13/15
� |
2017-06-06 |
|
[ 226 ]
�
� |
Simulation results on the influence of atomic clock group change on combinatorial clock output performance.
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 224 ]
�
� |
An implementation of ePRC based on optical clock
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 223 ]
�
� |
Some consideration for TDEV tolerance noise in G.812
�
� |
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 221 ]
�
� |
Some suggestions for the definition of phase discontinuity in G.811.1
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 220 ]
�
� |
A potential solution for combinatorial clock optimization in G.811.1
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q13/15
� |
2017-06-06 |
|
[ 204 ]
�
� |
Noise generation requirement in G.8262.1
�
� |
Qulsar, Inc.
� |
Q13/15
� |
2017-06-05 |
|
[ 202 ]
�
� |
Packet selection implication in G.8273.2
�
� |
Qulsar, Inc.
� |
Q13/15
� |
2017-06-05 |
Results:94 total items. Result page:�
1 -
2
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):