International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : WP SG11.1 : Meeting�2019-06-26�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�WP SG11.1� TD-WP2�(2019-06-26)�

ITU-T�WP SG11.1

SG11 Working Parties 1

Study Period 2017

Meeting� from 2019-06-26 to 2019-06-26

held in Switzerland [Geneva]

Other Meetings : 2021-12-012021-07-152021-03-172020-12-182020-12-042020-11-192020-07-222020-03-042019-10-16� [ 2019-06-26 ]� 2019-03-062018-10-312018-07-182017-11-082017-07-122017-02-06

Results:10 total items.
Temporary Documents �(WP2) �[�AI/Question:�Q7/11�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 70-WP2 ]
List of outgoing liaison statements for WP2/11 � TSB Q8/11, Q7/11, Q6/11 2019-06-26
[ 68-WP2 ]
Draft Report for Working Party 2/11 "Control and management protocols for IMT-2020" (Geneva, 26 June 2019) � Chairman WP2/11 Q8/11, Q7/11, Q6/11 2019-06-26
[ 63-WP2 ]
Draft report of Q7/11 meeting "Signalling requirements and protocols for network attachment including mobility and resource management for future networks and IMT-2020" (Geneva, 17-26 June 2019) � Rapporteur Q7/11 Q7/11 2019-06-25
[ 57-WP2 ]
Output - draft Recommendation ITU-T Q.IEC-PRO "Protocols for microservices based intelligent edge computing" (Geneva, 17-26 June 2019) � Editors Q7/11 2019-06-21
[ 56-WP2 ]
Output - draft recommendation Q.MEA-SRA "Signalling requirement and architecture for media service entity attachment" (Geneva, 17-26 June 2019) � Editors Q7/11 2019-06-21
[ 54-WP2 ]
LS/i on Work progress on Quantum Key Distribution (QKD) network in SG13 [from ITU-T SG13] � ITU-T SG13 Q8/11, Q7/11, Q6/11 2019-05-02
[ 52-WP2 ]
LS/i on information about consent of ITU-T Recommendation Y.3172 "Architectural framework for machine learning in future networks including IMT-2020" [from ITU T SG13] � ITU-T SG13 Q7/11 2019-04-29
[ 51-WP2 ]
LS/i on "ITU's Focus Group on Machine Learning for Future Networks including 5G (FG ML5G): Results, ongoing work and future directions" {from FG ML5G Management Team] � FG ML5G Management Team Q7/11 2019-04-29
[ 49-WP2 ]
(Rev.1-9)
Draft time plan of Rapporteur group meetings and WP1/11, WP2/11 and WP3/11 meetings (Geneva, 17-26 June 2019) � TSB Q8/11, Q7/11, Q6/11 2019-04-15
[ 48-WP2 ]
(Rev.1)
Draft agenda for WP2/11 "Control and management protocols for IMT-2020" (Geneva, 26 June 2019) � TSB Q8/11, Q7/11, Q6/11 2019-04-15
Results:10 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10