International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 11 : Meeting�2017-11-08�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 11� C�(2017-11-08)�

ITU-T�SG 11

Protocols and test specifications

Study Period 2017

Meeting� from 2017-11-08 to 2017-11-17

held in Switzerland [Geneva]

Other Meetings : 2021-12-012021-07-152021-03-172020-12-182020-12-042020-11-192020-07-222020-03-042019-10-162019-06-262019-03-062018-10-312018-07-182017-07-122017-02-06

Results:25 total items.
Contributions �[�Source:�China�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 133 ]
Proposal to add description of separation of control/forwarding plane architecture in ITU-T Q.BNG-CFS � China Unicom Q5/11 2017-10-26
[ 132 ]
Proposal to add description of function description in ITU-T Q.BNG-DBOD � China Unicom Q5/11 2017-10-26
[ 131 ]
Proposal to add description of architecture in ITU-T Q.BNG-IAP � China Unicom Q5/11 2017-10-26
[ 130 ]
Proposal to revise ITU-T Q.BNG-DBOD and add reference point description � China Unicom Q5/11 2017-10-26
[ 129 ]
Proposal for technical and editorial changes of Q.PVMapping � China Unicom , Huawei Technologies Co., Ltd. Q4/11 2017-10-26
[ 128 ]
(Rev.1)
A new work item "Northbound API management Framework" � China Mobile Communications Corporation , China Telecommunications Corporation Q6/11 2017-10-26
[ 119 ]
(Rev.1)
Proposal for initiating a new work item on signalling requirements for VoLTE-based network and GSMUMTS network supporting Multi-device emergency telecommunications service � China Unicom Q3/11 2017-10-25
[ 118 ]
Propose to add reference signalling architecture for network slice lifecycle management to Q.NS-LCMP � China Telecommunications Corporation Q6/11 2017-10-25
[ 116 ]
Proposal for initiating a new work item on signalling collection, signalling synthesis and index system in VoLTE networks � China Mobile Communications Corporation Q2/11 2017-10-25
[ 115 ]
(Rev.1)
Proposal to provide the inner control plane interfaces in QSMO � China Unicom Q4/11 2017-10-25
[ 114 ]
Proposal on detail modification and consent of draft Q.infra-iop � China Telecommunications Corporation Q14/11 2017-10-25
[ 113 ]
Proposal on overview of draft Q.infra-iop � China Telecommunications Corporation Q14/11 2017-10-25
[ 112 ]
(Rev.1)
Proposal to start a new work item Q.SQM"signalling requirements of the Internet service quality monitoring system" � China Unicom Q13/11 2017-10-25
[ 110 ]
(Rev.1)
Modification of Draft recommendation Q.SCO � China Telecommunications Corporation Q4/11 2017-10-24
[ 109 ]
(Rev.1)
signalling requirement of SDWAN messages � China Telecommunications Corporation Q4/11 2017-10-24
[ 105 ]
(Rev.1)
Propose to initiate a new work item on vBRAS monitoring parameter set � China Telecommunications Corporation Q13/11 2017-10-24
[ 104 ]
(Rev.1)
Proposal to modify for draft Recommendation Q.SVDC � China Telecommunications Corporation Q4/11 2017-10-24
[ 99 ]
(Rev.1)
Propose to add clause 7.1.1,7.1.2,7.1.3,7.4 of Q.WA-IOP � China Telecommunications Corporation Q14/11 2017-10-23
[ 98 ]
(Rev.1)
Propose to update Section 3,4,6,8 of Q.WA-IOP � China Telecommunications Corporation Q14/11 2017-10-23
[ 91 ]
Proposals for editorial changes of Q.CCP � China Telecommunications Corporation Q2/11, Q13/11 2017-10-20
[ 90 ]
Proposal for modifications of actions of originating local exchange in Q.731 amendment � China Telecommunications Corporation Q2/11 2017-10-20
[ 89 ]
(Rev.1)
Propose to initiate a new work item on architecture and signalling requirement of calling identification authentication � China Telecommunications Corporation Q2/11 2017-10-20
[ 84 ]
Proposed modification for session 7 of Q.VCNSA � China Telecommunications Corporation Q1/11 2017-10-16
[ 83 ]
Proposed modification for section 8 of Q.suppl.VoLTE_ETS_Interconnection � China Telecommunications Corporation Q3/11 2017-10-16
[ 82 ]
Propose to initiate a new work item on signalling architecture of distributed ENUM networking for IMS � China Telecommunications Corporation Q1/11 2017-10-16
Results:25 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10