International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 11 : Meeting�2017-07-12�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 11� TD�(2017-07-12)�

ITU-T�SG 11

Protocols and test specifications

Study Period 2017

Meeting� from 2017-07-12 to 2017-07-13

held in Switzerland [Geneva]

Other Meetings : 2021-12-012021-07-152021-03-172020-12-182020-12-042020-11-192020-07-222020-03-042019-10-162019-06-262019-03-062018-10-312018-07-182017-11-08� [ 2017-07-12 ]� 2017-02-06

Results:9 total items.
Temporary Documents �(WP2) �[�AI/Question:�Q7/11�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 22-WP2 ]
(Rev.1)
Draft report for Working Party 2/11 "Control and management protocols for IMT-2020" (Geneva, 13 July 2017) � Chairman WP2/11 Q8/11, Q7/11, Q6/11 2017-07-13
[ 21-WP2 ]
(Rev.1)
Agenda for WP2/11 "Control and management protocols for IMT-2020" � Chairman WP2/11 Q8/11, Q7/11, Q6/11 2017-07-13
[ 19-WP2 ]
(Rev.1-2)
Report of Q7/11 Rapporteur meeting "Signalling requirements and protocols for network attachment including mobility and resource management for future networks and IMT-2020" (Geneva, 3-12 July 2017) � Rapporteur Q7/11 Q7/11 2017-07-13
[ 18-WP2 ]
Output-Draft Recommendation Q.MEA-SRA "Signalling requirement and architecture for media service entity attachment" (Q7/11 Rapporteur meeting, Geneva, 3-12 July 2017) � Editors Q7/11 2017-07-13
[ 17-WP2 ]
(Rev.1)
Output - Draft Recommendation ITU-T Q.NEA-REQ, "Signalling requirements of NFV entity management for network attachment " (Geneva, 3-12 July 2017) � Editors Q7/11 2017-07-13
[ 16-WP2 ]
Output - draft Recommendation Q.IEC-REQ, "Signalling requirement of intelligent edge computing" (Q7/11 Rapporteur meeting, Geneva, 3-12 July 2017) � Editors Q7/11 2017-07-13
[ 15-WP2 ]
(Rev.1)
Output - Draft Recommendation Q.SAN-MIM "Signalling requirements of SDN-based access networks with media independent management capabilities" (Q7/11 Rapporteur meeting, Geneva, 3-12 July 2017) � Editors Q7/11 2017-07-13
[ 7-WP2 ]
Incoming LS for WP2/11 � TSB Q8/11, Q7/11, Q6/11 2017-06-29
[ 1-WP2 ]
(Rev.1-2)
Draft time plan of Rapporteur group meetings and WP1, WP2 meetings (Geneva, 3-13 July 2017) � TSB Q8/11, Q7/11, Q6/11 2017-05-15
Results:9 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10