Contributions
�[�Source:�Korea (Rep. of)�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 846 ]
�
� |
Proposal to use QR code and Blockchain technologies for the efficient reuse of used batteries from electric vehicles (EVs)
�
� |
Korea (Rep. of)
� |
Q7/5
� |
2021-11-16 |
|
[ 845 ]
�
� |
EMF strength analysis of the 5G NR base station using the Ray-Tracing Method
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2021-11-16 |
|
[ 844 ]
�
(Rev.1-2)� |
Draft of K-Series Supplement-" EMF strength inside and outside of OLEV"
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2021-11-16 |
|
[ 795 ]
�
(Rev.1)� |
Considerations on micro data centres for edge computing
�
� |
Korea (Rep. of)
� |
Q6/5
� |
2021-04-28 |
|
[ 726 ]
�
� |
A proposal for new work item on "Energy efficiency in micro data centre for edge computing"
�
� |
Korea (Rep. of)
� |
Q6/5
� |
2020-10-06 |
|
[ 718 ]
�
� |
EMF exposure evaluation on non-radiocommunication installations
�
� |
Korea (Rep. of)
� |
QALL/5
� |
2020-10-05 |
|
[ 712 ]
�
� |
Korea Green New Deal Initiative and ICT
�
� |
Korea (Rep. of)
� |
QALL/5
� |
2020-10-06 |
|
[ 624 ]
�
� |
KSTR.EMF_assess on "The assessment of electromagnetic field on medical and beauty treatment devices": Proposal for case study
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2020-04-27 |
|
[ 623 ]
�
� |
EMF strength measurements for the WPT system of electric vehicles and the measurement results
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2020-04-27 |
|
[ 622 ]
�
� |
L.SE_DC on "Smart energy solution for data centre and telecom centre": Proposal for updating clause 6
�
� |
Korea (Rep. of)
� |
Q6/5
� |
2020-04-27 |
|
[ 621 ]
�
(Rev.1)� |
K.peak: Rationale of the expression of spatial averaging for evaluating real exposure level
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2020-04-27 |
|
[ 578 ]
�
(Rev.1)� |
K-Series Supplement "EMF strength inside subway train"
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q3/5
� |
2019-09-03 |
|
[ 493 ]
�
(Rev.1-2)� |
Proposed new work item on K.STR.EMF_assess - "EMF strength inside the subway train"
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2019-04-30 |
|
[ 492 ]
�
� |
Proposal for updating baseline document of L.SES
�
� |
Korea (Rep. of)
� |
Q6/5
� |
2019-04-30 |
|
[ 491 ]
�
(Rev.1)� |
Proposal to conduct a survey on the Recycling of used EV Batteries
�
� |
Korea (Rep. of)
� |
Q7/5
� |
2019-04-30 |
|
[ 490 ]
�
(Rev.1-2)� |
K Suppl. 16 on "Electromagnetic field (EMF) compliance assessments for 5G wireless networks ": EMF extrapolation method for 5G NR radio station
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2019-04-30 |
|
[ 489 ]
�
� |
L.SES on "Use of ICT sites to support environmental sensing": Proposal for updating clause 8 and Bibliography
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q6/5
� |
2019-04-30 |
|
[ 424 ]
�
� |
Proposed Terms of Reference for new Focus Group on "Environmental Efficiency for Artificial Intelligence and other Emerging Technologies" (FG-AI4EE)
�
� |
Argentina
,
Brazil
,
China Unicom
,
China
,
Cisco Systems, Inc. (United States)
,
Colombia
,
Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT (Italy)
,
Dominican Rep.
,
Egypt
,
Greece
,
Huawei Technologies Co., Ltd. (China)
,
Italy
,
Kenya
,
Korea (Rep. of)
,
Nokia Corporation (Finland)
,
Orange (France)
,
Rwanda
,
Spain
,
Telecommunication and Postal Regulatory Authority (Sudan)
,
Telefon AB - LM Ericsson (Sweden)
,
Uganda Communications Commission (UCC)
� |
QALL/5
� |
2019-04-15 |
|
[ 369 ]
�
(Rev.1)� |
EMF extrapolation method of 5G radio stations for compliance assessment
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2018-08-28 |
|
[ 368 ]
�
(Rev.1)� |
EMF level monitoring and information platform for various radio stations
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2018-08-28 |
|
[ 367 ]
�
� |
Introduction on the RF EMF warning signage applied in Korea
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2018-08-28 |
|
[ 364 ]
�
(Rev.1-2)� |
Evaluation of the EMF strength for verifying the compliance with guidelines inside the subway train
�
� |
Korea (Rep. of)
,
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q3/5
� |
2018-08-28 |
|
[ 363 ]
�
� |
Comparison of measurement and numerical prediction results of EMF strength in the vicinity of radiocommunication stations
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2018-08-28 |
|
[ 362 ]
�
� |
Proposal of updating L.green_mgm_DC with a control function
�
� |
Korea (Rep. of)
� |
Q6/5
� |
2018-08-28 |
|
[ 239 ]
�
(Rev.1)� |
Proposal for Appendix II of K.121 on the Shared Radiocommunications Site
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Korea (Rep. of)
,
Ministry of Science and ICT
� |
Q3/5
� |
2018-05-03 |
|
[ 238 ]
�
(Rev.1)� |
Proposal for some issues regarding the Technical Report on 5G and EMF
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Korea (Rep. of)
,
Ministry of Science and ICT
� |
Q3/5
� |
2018-05-03 |
|
[ 158 ]
�
(Rev.1)� |
Updated draft document of L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities)
�
� |
Korea (Rep. of)
� |
Q9/5
� |
2017-10-31 |
|
[ 157 ]
�
(Rev.1)� |
Contribution for Clause 9 and 10 of L.CCRisk
�
� |
Korea (Rep. of)
� |
Q9/5
� |
2017-10-31 |
|
[ 156 ]
�
(Rev.1)� |
Draft baseline document for L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities)
�
� |
Korea (Rep. of)
� |
Q9/5
� |
2017-10-31 |
|
[ 155 ]
�
� |
Consideration topics in preparation for the Technical Report concerning 5G and EMF
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2017-10-31 |
|
[ 154 ]
�
� |
Proposal of updating L.green_mgm_DC
�
� |
Korea (Rep. of)
� |
Q6/5
� |
2017-10-31 |
|
[ 153 ]
�
� |
Proposal of the operational procedure of the energy-saving management system in L.green_mgm_DC
�
� |
Korea (Rep. of)
� |
Q6/5
� |
2017-10-31 |
|
[ 52 ]
�
� |
Proposed initial text for L.CC Risk (Framework of climate change risk assessment for telecommunication and electrical facilities)
�
� |
Korea (Rep. of)
� |
Q8/5
� |
2017-05-02 |
|
[ 50 ]
�
� |
Proposed text for clause 6 in L.CC Risk (Framework of climate change risk assessment for telecommunication and electrical facilities)
�
� |
Korea (Rep. of)
� |
Q8/5
� |
2017-05-02 |
|
[ 48 ]
�
� |
Proposal for changing a Figure in Annex III of K.100
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2017-05-02 |
|
[ 47 ]
�
� |
Proposal for adding a scientific paper in bibliography of K.100
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2017-05-02 |
Results:36 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):