Temporary Documents
�(GEN)
�[�AI/Question:�Q2/5�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 784-GEN ]
�
� |
Revised text for draft revised Recommendation ITU-T K.21 including comments received during the LC period
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-09-21 |
|
[ 783-GEN ]
�
� |
Revised text for draft revised Recommendation ITU-T K.20 including UK and Japan comments received during the LC period
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-09-21 |
|
[ 782-GEN ]
�
� |
Revised text and figures for draft revised Recommendation ITU-T K.44 including UK comments received during the LC period
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-09-21 |
|
[ 760-GEN ]
�
� |
Draft LS/o/r on the new version of the Home Network Transport (HNT) Standards Overview and Work Plan (reply to SG15 - LS 92 -E) [to ITU-T SG15] (reply to TD603)
�
� |
ITU-T Study Group 5
� |
Q4/5, Q2/5, Q1/5
� |
2018-09-19 |
|
[ 757-GEN ]
�
� |
Raw meeting notes of Q2/5 (Geneva, 11-21 September 2018)
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-09-19 |
|
[ 748-GEN ]
�
� |
Intra-system ports for K.45 (maximum cable length of 6 meters) - Agreed Adtran-NTT text from Q2/5 September 2018 meeting
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-09-19 |
|
[ 747-GEN ]
�
� |
Recommendation ITU-T K.rcd "Technical parameters for residual current operated protective devices with automatic reclosing feature for telecom applications" for consent
�
� |
Co-rapporteur Q2/5 and Editor
� |
Q2/5
� |
2018-09-19 |
|
[ 740-GEN ]
�
� |
New work item on Supplement to K.45 "Technical rationale of resistibility of telecommunication equipment installed in the access and trunk networks against lightning"
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-09-18 |
|
[ 739-GEN ]
�
� |
New work item on Supplement to K.20 "Technical rationale of resistibility of telecommunication equipment installed in a telecommunication centre against lightning"
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-09-18 |
|
[ 738-GEN ]
�
� |
New work item on Supplement to K.21 "Technical rationale of resistibility of telecommunication equipment installed in customer premises against lightning"
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-09-18 |
|
[ 735-GEN ]
�
� |
Baseline text for new K.Supplement on Internal DC powering interface surge testing factors
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-09-18 |
|
[ 726-GEN ]
�
� |
Proposal for a new work item on Supplement for K.20, K.21 and K.44 "Internal DC powering interface surge testing factors"
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-09-17 |
|
[ 706-GEN ]
�
� |
Proposed fourth draft of new Recommendation K.spdsafe "Guidance on safety relating to the use of surge protective devices and surge protective components in telecommunication terminal equipment"
�
� |
Editor
� |
Q2/5
� |
2018-09-14 |
|
[ 684-GEN ]
�
� |
Revised K.64 Base Text to align with new safety standards
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-09-11 |
|
[ 660-GEN ]
�
� |
Report of ACEC meeting held on 11-12 April 2018 in Paris (St. Denis) France
�
� |
Liaison Rapporteur to ACEC
� |
Q5/5, Q4/5, Q3/5, Q2/5, Q1/5
� |
2018-09-05 |
|
[ 619-GEN ]
�
� |
LS/i/r on collaboration (reply to ITU-T SG5-LS50) [from ITU-D SG1]
�
� |
ITU-D Study Group 1
� |
Q6/5, Q4/5, Q3/5, Q2/5
� |
2018-06-20 |
|
[ 590-GEN ]
�
(Rev.1-3)� |
Draft Report of Working Party 1/5 (Geneva, 11-21 September 2018)
�
� |
Chairman WP1/5
� |
Q5/5, Q4/5, Q3/5, Q2/5, Q1/5
� |
2018-06-14 |
|
[ 582-GEN ]
�
(Rev.1)� |
Draft Report of Question 2/5 (Geneva, 11-21 September 2018)
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-06-14 |
|
[ 572-GEN ]
�
(Rev.1-4)� |
Draft agenda for Question 2/5 meeting (Geneva, 11-21 September 2018)
�
� |
Co-rapporteur Q2/5
� |
Q2/5
� |
2018-06-14 |
|
[ 569-GEN ]
�
(Rev.1-3)� |
Draft agenda for Working Party 1/5 meeting (Geneva, 11-21 September 2018)
�
� |
Chairman WP1/5
� |
Q5/5, Q4/5, Q3/5, Q2/5, Q1/5
� |
2018-06-14 |
Results:20 total items.
� |