International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 5 : Meeting�2018-09-11�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 5� TD�(2018-09-11)�

ITU-T�SG 5

Environment, climate change and circular economy

Study Period 2017

Meeting� from 2018-09-11 to 2018-09-21

held in Switzerland [Geneva]

Other Meetings : 2021-11-302021-05-112020-10-192020-05-112019-09-162019-05-13� [ 2018-09-11 ]� 2018-05-212018-03-052017-11-132017-05-15

Results:23 total items.
Temporary Documents �(GEN) �[�AI/Question:�Q3/5�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 758-GEN ]
(Rev.1)
Draft LS/o/r on collaboration in RF EMF, EMC and particle radiation effects (reply to LS ITU-DSG2-2/111-E -E) [to ITU-T SG2] (reply to TD622) � ITU-T Study Group 5 Q5/5, Q4/5, Q3/5 2018-09-19
[ 741-GEN ]
Deletion of Supplement 2 to ITU-T K.52 Calculator for equivalent isotropic radiated power as described in Recommendation ITU-T K.52 � Rapporteur Q3/5 Q3/5 2018-09-18
[ 734-GEN ]
(Rev.1)
Draft LS/o/r on work being carried out under study in ITU-T Q3/5 (reply to LS ITU-R WP 1C - 1C/169 (Annex 10) -E and ITU-DSG2-2/116-E -E) [to ITU-R and ITU-D] (reply to TD634 and TD620) � ITU-T Study Group 5 Q3/5 2018-09-18
[ 733-GEN ]
(Rev.1)
A.1 justification for a new work item on KSTR.EMF_assess - "Case studies of RF-EMF assessments" � Rapporteur Q3/5 Q3/5 2018-09-18
[ 727-GEN ]
(Rev.1)
Draft new Appendix IX to Recommendation ITU-T K.91 � Rapporteur Q3/5 Q3/5 2018-09-17
[ 725-GEN ]
Draft new Appendix VIII to ITU-T Recommendation K.91 � Rapporteur Q3/5 Q3/5 2018-09-17
[ 724-GEN ]
(Rev.1)
Revisions of the Supplement 4 to ITU-T K-series Recommendations � Rapporteur Q3/5 Q3/5 2018-09-17
[ 723-GEN ]
Draft new Supplement x to ITU-T K-series of Recommendations "Radiofrequency Electromagnetic Field (RF-EMF) compliance assessments for 5G wireless networks" � Rapporteur Q3/5 Q3/5 2018-09-17
[ 722-GEN ]
New Appendix V to ITU-T Recommendation K.52 with new version of the software K.52 calculator � Rapporteur Q3/5 Q3/5 2018-09-17
[ 721-GEN ]
Revision of the Appendix I to ITU-T Recommendation K.70: new versions v 8.32 and 8.64 of the software "EMF-estimator" � Rapporteur Q3/5 Q3/5 2018-09-17
[ 720-GEN ]
Presentation "Planning 5G Networks under EMF Constraints", University of Rome Tor Vergata � Rapporteur Q3/5 Q3/5 2018-09-17
[ 719-GEN ]
Presentation "Electromagnetic Energy (EME) Exposure assessment of Telstra's 5G trial network on the Gold Coast, Australia" that was presented by Mike Wood, Telstra Corporation Limited � Rapporteur Q3/5 Q3/5 2018-09-17
[ 718-GEN ]
Revision of the A.1 justification: Work item K.workers (modification of the work item K.Dosimeter) � Rapporteur Q3/5 Q3/5 2018-09-14
[ 696-GEN ]
(Rev.1)
Draft LS/o on ITU Intersectorial Response to "ICNIRP Public Consultation of the Draft ICNIRP Guidelines on Limiting EMF Exposure (100 kHz to 300 GHz)" [to ICNIRP] � ITU-T Study Group 5 Q3/5 2018-09-13
[ 660-GEN ]
Report of ACEC meeting held on 11-12 April 2018 in Paris (St. Denis) France � Liaison Rapporteur to ACEC Q5/5, Q4/5, Q3/5, Q2/5, Q1/5 2018-09-05
[ 634-GEN ]
LS/i/r on Preliminary Draft New Report ITU-R SM.[EMF-MON] - Electromagnetic field measurements to assess human exposure (reply to SG5 - LS60) [from ITU-R SG1] � ITU-R Study Group 1 WP1C Q3/5 2018-06-29
[ 622-GEN ]
LS/i on collaboration [from ITU-D SG2] � ITU-D Study Group 2 Q7/5, Q4/5, Q3/5 2018-06-20
[ 620-GEN ]
LS/i/r on collaboration in the 2018-2021 study period (reply to ITU-T SG5-LS4, SG5-LS24, SG5-LS40) [from ITU-D SG2] � ITU-D Study Group 2 Q3/5 2018-06-20
[ 619-GEN ]
LS/i/r on collaboration (reply to ITU-T SG5-LS50) [from ITU-D SG1] � ITU-D Study Group 1 Q6/5, Q4/5, Q3/5, Q2/5 2018-06-20
[ 590-GEN ]
(Rev.1-3)
Draft Report of Working Party 1/5 (Geneva, 11-21 September 2018) � Chairman WP1/5 Q5/5, Q4/5, Q3/5, Q2/5, Q1/5 2018-06-14
[ 583-GEN ]
(Rev.1-2)
Draft Report of Question 3/5 (Geneva, 11-21 September 2018) � Rapporteur Q3/5 Q3/5 2018-06-14
[ 573-GEN ]
(Rev.1-2)
Draft agenda for Question 3/5 meeting (Geneva, 11-21 September 2018) � Rapporteur Q3/5 Q3/5 2018-06-14
[ 569-GEN ]
(Rev.1-3)
Draft agenda for Working Party 1/5 meeting (Geneva, 11-21 September 2018) � Chairman WP1/5 Q5/5, Q4/5, Q3/5, Q2/5, Q1/5 2018-06-14
Results:23 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10