International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 5 : Meeting�2018-09-11�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 5� C�(2018-09-11)�

ITU-T�SG 5

Environment, climate change and circular economy

Study Period 2017

Meeting� from 2018-09-11 to 2018-09-21

held in Switzerland [Geneva]

Other Meetings : 2021-11-302021-05-112020-10-192020-05-112019-09-162019-05-132018-05-212018-03-052017-11-132017-05-15

Results:20 total items.
Contributions �[�Source:�Bourns Limited�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 394 ]
Variants of IEEE 802.3 Ethernet Standard implementations � Bourns Limited Q2/5 2018-08-29
[ 386 ]
MOV terms - Annotated IEC 61051-1 ed. 3 review � Bourns Limited Q2/5 2018-08-29
[ 321 ]
(Rev.1)
2nd draft of K.rcd "Technical parameters for residual current operated protective devices with automatic reclosing feature for telecom applications" � Bourns Limited (United Kingdom) , China Telecommunications Corporation Q2/5 2018-08-24
[ 319 ]
Pluggable equipment Type A IEC 62368-1 protection circuit examples for possible inclusion in K.128 � Bourns Limited Q2/5 2018-08-11
[ 309 ]
(Rev.1)
Review of IEC 62368-1 varistor requirements for possible inclusion in K.77 � Bourns Limited Q2/5 2018-07-29
[ 307 ]
LTspice simulation of metal oxide varistors, MOVs, and the definition of an MOV � Bourns Limited Q2/5 2018-07-23
[ 305 ]
Clauses applicable to external circuits in IEC 62368-1 Edition 3 � Bourns Limited Q2/5 2018-07-17
[ 303 ]
DC power interface surge analysis - tests 7.8 and 7.9 of K.20 and K.21 � Bourns Limited Q2/5 2018-07-13
[ 302 ]
(Rev.1)
Re-review of C261 (K.21 contribution) � Bourns Limited Q2/5 2018-07-06
[ 301 ]
(Rev.1)
Re-review of C244 (K.20 contribution) � Bourns Limited Q2/5 2018-07-06
[ 300 ]
Re-review of C243 (K.44 contribution) � Bourns Limited Q2/5 2018-07-06
[ 299 ]
Testing equipment-powering ports that are not connected to the AC mains supply - Part 9: Proposal consolidation of C291 to C298 � Bourns Limited Q2/5 2018-07-05
[ 298 ]
Testing equipment-powering ports that are not connected to the AC mains supply - Part 8: Updating K.44 for 400 V d.c. powering � Bourns Limited Q2/5 2018-07-04
[ 297 ]
Testing equipment-powering ports that are not connected to the AC mains supply - Part 7: Test circuit figure to replace K.44 Figure A.6.6-2, Figure A.6.6-1a and Figure A.6.6-1b. � Bourns Limited Q2/5 2018-07-03
[ 296 ]
Testing equipment-powering ports that are not connected to the AC mains supply - Part 6: Review of 7.8 and 7.9 test entries (K.20 and K.21) � Bourns Limited Q2/5 2018-07-03
[ 295 ]
Testing equipment-powering ports that are not connected to the AC mains supply - Part 5: Review of DC power feed surge test figures of Table 1b (K.20, K.21 and K.45) � Bourns Limited Q2/5 2018-07-02
[ 294 ]
Testing equipment-powering ports that are not connected to the AC mains supply - Part 4: DC power feed tests of Tables 1a and 1b (K.20, K.21 and K.45) � Bourns Limited Q2/5 2018-07-01
[ 293 ]
Testing equipment-powering ports that are not connected to the AC mains supply - Part 3: Powering supply configurations � Bourns Limited Q2/5 2018-06-30
[ 292 ]
Testing equipment-powering ports that are not connected to the AC mains supply - Part 2: Grid terms review � Bourns Limited Q2/5 2018-06-30
[ 291 ]
Testing equipment-powering ports that are not connected to the AC mains supply - Part1 Background � Bourns Limited Q2/5 2018-06-29
Results:20 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25