International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�

ITU-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:190 total items.
Result page:� 1 - 2 - 3 - 4 �-�Next Next
Contributions �[�Source:�ZTE�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 2127 ]
Proposal to add a new information model controller component to G.cca � ZTE Corporation Q14/15, Q12/15 2016-09-06
[ 2126 ]
Proposal to enhance the description of the NOSM in G.872 � ZTE Corporation Q6/15, Q12/15 2016-09-06
[ 2113 ]
Incremental Query in SDN � ZTE Corporation Q14/15, Q12/15 2016-09-06
[ 2112 ]
Alarm Processing in Virtual Network � ZTE Corporation Q14/15, Q12/15 2016-09-06
[ 2111 ]
Transport network batch query and processing solution in SDN environment � ZTE Corporation Q14/15, Q12/15 2016-09-06
[ 2110 ]
(Rev.1)
Transport synchronization message in FlexO interface � ZTE Corporation Q13/15, Q11/15 2016-09-06
[ 2109 ]
Overhead processing of FlexE and FlexO atomic function � ZTE Corporation Q11/15 2016-09-06
[ 2097 ]
(Rev.1)
Basic requirements for channel bonding of NG-PON2 � ZTE Corporation Q2/15 2016-09-06
[ 2095 ]
(Rev.1)
Channel bonding establishment for NGPON2 � ZTE Corporation Q2/15 2016-09-06
[ 2093 ]
(Rev.1)
Big channel scheme for channel bonding of NG-PON2 � ZTE Corporation Q2/15 2016-09-06
[ 2092 ]
(Rev.1)
proposal for 25G PON � ZTE Corporation Q2/15 2016-09-06
[ 2090 ]
Attributes for SyncE extended SSM � ZTE Corporation Q14/15, Q13/15 2016-09-06
[ 2088 ]
(Rev.1)
Synchronization OAM � ZTE Corporation Q14/15, Q13/15 2016-09-06
[ 2057 ]
Proposal on new Recommendation "Optical fibre cables for in-home directly wall surface applications" � China Unicom , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation Q16/15 2016-09-05
[ 2047 ]
Wavelength plan consideration of G.metro � China Unicom , ZTE Corporation Q6/15 2016-09-05
[ 2045 ]
Proposal to study OSNR related issues of beyond 100G physical interface � China Unicom , ZTE Corporation Q6/15 2016-09-05
[ 2039 ]
G.Fast: Application reference model(s) for coax � ZTE Corporation Q4/15 2016-09-05
[ 2038 ]
G.Fast: Indication of QoS queues status for DTA control � ZTE Corporation Q4/15 2016-09-05
[ 2037 ]
G.Fast: Requirements for DTA capability Negotiation and environment confirmation in the initialization stage for operation on twisted-pair cables � ZTE Corporation Q4/15 2016-09-05
[ 2036 ]
G.Fast: Consideration for signalling mechanism of DTA updates � ZTE Corporation Q4/15 2016-09-05
[ 2035 ]
G.fast: Considerations on pre-coding of 212MHz profile � ZTE Corporation Q4/15 2016-09-05
[ 1954 ]
Synchronization management model, comments on TD549/WP3 Rev.1 � ZTE Corporation Q14/15, Q13/15 2016-09-02
[ 1953 ]
(Rev.1)
Proposal for an information model for media � ZTE Corporation Q14/15, Q12/15 2016-09-02
[ 1952 ]
Proposals to update draft Recommendation G.cca to describe ODUflex � ZTE Corporation Q14/15, Q12/15 2016-09-02
[ 1951 ]
Proposed new text for clause 7.4 of G.cca � ZTE Corporation Q14/15, Q12/15 2016-09-02
[ 1950 ]
Proposal to add an appendix to G.872 to describe FlexE � ZTE Corporation Q12/15, Q11/15 2016-09-02
[ 1949 ]
Replacement text for Appendix II of G.872 � ZTE Corporation Q12/15 2016-09-02
[ 1948 ]
Proposal to update clause 11 "OTN survivability techniques" in G.872 � ZTE Corporation Q9/15, Q12/15, Q11/15 2016-09-02
[ 1947 ]
Replacement text for clause 10 of G.872 � ZTE Corporation Q12/15 2016-09-02
[ 1946 ]
Proposal to add a description of the use of FlexO in G.872 � ZTE Corporation Q12/15, Q11/15 2016-09-02
[ 1945 ]
Proposed modification to Clause 8 of G.872 � ZTE Corporation Q6/15, Q12/15 2016-09-02
[ 1940 ]
Proposal of a new supplement on 25 Gb/s transmission per wavelength � Broadcom Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , ZTE Corporation Q2/15 2016-09-02
[ 1933 ]
considerations about the wavelength plan of G.metro � ZTE Corporation Q6/15 2016-09-02
[ 1932 ]
Considerations on the EVM in the G.698.2 � ZTE Corporation , CAICT , Ministry of Industry and Information Technology (MIIT) Q6/15 2016-09-02
[ 1785 ]
Alarm processing in G.asdtn and G.gim � ZTE Corporation Q14/15, Q12/15 2016-02-02
[ 1766 ]
XGS-PON TC considerations on XGS-PON and XG-PON1 co-existence � ZTE Corporation , China Unicom Q2/15 2016-02-02
[ 1764 ]
Proposal for NG-PON2 amendment on channel bonding � ZTE Corporation Q2/15 2016-02-02
[ 1763 ]
Comments on G.988 Amendment 2 � ZTE Corporation Q2/15 2016-02-02
[ 1762 ]
Comments on G.988 Amendment 1 � ZTE Corporation Q2/15 2016-02-02
[ 1761 ]
Proposal of line coding for 25Gb channel rate � ZTE Corporation Q2/15 2016-02-02
[ 1758 ]
DNI protection method in G.MDSP � ZTE Corporation Q9/15 2016-02-02
[ 1729 ]
Dual-rate support in XGS-PON � British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , Orange , ZTE Corporation Q2/15 2016-02-02
[ 1686 ]
Eye diagram Mask for XGS-PON � Huawei Technologies Co., Ltd. , China Telecommunications Corporation , ZTE Corporation Q2/15 2016-02-01
[ 1683 ]
Text for clause 9 of G.872 � ZTE Corporation Q12/15 2016-02-01
[ 1682 ]
Text for clause 8 of G.872 � ZTE Corporation Q12/15 2016-02-01
[ 1681 ]
Text for clause 7 of G.872 � ZTE Corporation Q12/15 2016-02-01
[ 1679 ]
Proposal to modify the question text for Q12 in the next study period � ZTE Corporation Q12/15 2016-02-01
[ 1678 ]
Information model for the NE synchronization functions � ZTE Corporation Q14/15, Q13/15 2016-02-01
[ 1661 ]
G.Fast: Requirements for operation on copper lines extended to include coaxial cables � ZTE Corporation Q4/15 2016-02-01
[ 1660 ]
G.Fast: Requirements for Dynamic Bandwidth Allocation (DBA) in G.fast operation on coax � ZTE Corporation Q4/15 2016-02-01
Results:190 total items.
Result page:� 1 - 2 - 3 - 4 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-26