Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2213 ]
�
� |
Consideration on Functional Requirements for Transport SDN CPI
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
� |
Q14/15, Q12/15
� |
2016-09-07 |
|
[ 2212 ]
�
� |
Considerations on L.nrr-frm
�
� |
Italy
� |
Q17/15
� |
2016-09-07 |
|
[ 2211 ]
�
� |
Average power, ER and OMA proposals in NG-PON2
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q2/15
� |
2016-09-06 |
|
[ 2210 ]
�
� |
G.fast: Maximal Ratio Transmission over FEXT channels
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2016-09-06 |
|
[ 2209 ]
�
� |
G.fast: On mixed sampling frequency G.fast vector groups
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2016-09-06 |
|
[ 2208 ]
�
� |
G.fast: Zero Forcing Pre-coder optimisation
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2016-09-06 |
|
[ 2207 ]
�
� |
XGS-PON: Proposal for Optional Wavelength Set Range
�
� |
ADTRAN
,
Calix Networks, Inc.
,
Nokia Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2206 ]
�
(Rev.1)� |
XGS-PON: Proposal for Optional Wavelength Set PMD parameters
�
� |
ADTRAN
,
Calix Networks, Inc.
,
Nokia Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2205 ]
�
(Rev.1)� |
NGPON2 and XGS-PON: Use of PLOAM to Reboot ONU
�
� |
ADTRAN
,
Calix Networks, Inc.
� |
Q2/15
� |
2016-09-06 |
|
[ 2204 ]
�
� |
T-TSC-X Tolerance & Harmonized PTS/APTS limits
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2203 ]
�
� |
Evolution of G.hn: New coding scheme proposal
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2016-09-06 |
|
[ 2202 ]
�
� |
Evolution of G.hn: On the Forward Error Correction
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2016-09-06 |
|
[ 2201 ]
�
� |
Evolution of G.hn: Full Duplex MAC
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2016-09-06 |
|
[ 2200 ]
�
� |
Evolution of G.hn: Full Duplex PHY Framing
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2016-09-06 |
|
[ 2199 ]
�
� |
NG-PON2 TC layer interoperability items
�
� |
ADTRAN
,
Broadcom Corporation
,
Calix Networks, Inc.
,
Verizon Communication Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2198 ]
�
� |
G.989.2: Relationship between ER and Receive Sensitivity for APD and PIN
�
� |
ADTRAN
� |
Q2/15
� |
2016-09-06 |
|
[ 2197 ]
�
(Rev.1)� |
State of Current Technology for Temperature Compensated X'tal Oscillators (TCXO)
�
� |
Epson Electronics America
� |
Q13/15
� |
2016-09-06 |
|
[ 2196 ]
�
� |
G989.3 PLOAM corrections
�
� |
Alcatel-Lucent USA Inc.
� |
Q2/15
� |
2016-09-06 |
|
[ 2195 ]
�
� |
Comments to the new baselined clause 18 in G.989.3A1
�
� |
ADTRAN
,
Calix Networks, Inc.
,
Nokia Corporation
,
Orange
,
Verizon Communication Corporation
� |
Q2/15
� |
2016-09-06 |
|
[ 2194 ]
�
� |
Vendor Survey: XGS-PON on GPON Wavelengths
�
� |
Calix Networks, Inc.
� |
Q2/15
� |
2016-09-06 |
|
[ 2193 ]
�
� |
MPLS-TP OAM Updates
�
� |
Alcatel-Lucent USA Inc.
� |
Q10/15
� |
2016-09-06 |
|
[ 2192 ]
�
� |
RPR in G.8021
�
� |
Alcatel-Lucent USA Inc.
� |
Q10/15
� |
2016-09-06 |
|
[ 2191 ]
�
� |
Ring port forwarding state
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15, Q14/15, Q10/15
� |
2016-09-06 |
|
[ 2190 ]
�
� |
Review of, and comments on draft G.Sup-ELPDNI
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2016-09-06 |
|
[ 2189 ]
�
� |
Equipment reflections in NG-PON2
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q2/15
� |
2016-09-06 |
|
[ 2188 ]
�
� |
100G interoperability measurements up to 1600 km as in input to G.698.2
�
� |
Deutsche Telekom AG
� |
Q6/15
� |
2016-09-06 |
|
[ 2187 ]
�
� |
G.8273.2: Limits to use when cascading Boundary Clocks
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2016-09-06 |
|
[ 2186 ]
�
� |
xPON Access HRMs and Performance for LTE and CA Applications
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q2/15, Q13/15
� |
2016-09-06 |
|
[ 2185 ]
�
� |
GPON Time Error Transfer performance for a loaded Access System
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q13/15
� |
2016-09-06 |
|
[ 2184 ]
�
� |
GPON Time Error increase when adding more ONUs
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q13/15
� |
2016-09-06 |
|
[ 2183 ]
�
� |
G.9903 to consent
�
� |
ERDF
� |
Q15/15
� |
2016-09-06 |
|
[ 2182 ]
�
� |
VDSL: Long Reach VDSL2
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2016-09-06 |
|
[ 2181 ]
�
� |
Practical Access Model of T-BC from Protocol View Update [G.8271, G.8273.2]
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2180 ]
�
� |
Practical Access Model of T-BC from Performance View Update [G.8271, G.8273.2]
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2179 ]
�
� |
Various correction to G.9903
�
� |
ERDF
� |
Q15/15
� |
2016-09-06 |
|
[ 2178 ]
�
� |
Generic Virtual PTP Port Updates [G.8275]
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2177 ]
�
� |
Cross-Profile Generic IWF Updates [G.8275]
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2176 ]
�
� |
Updates to Appendix III Monitoring Figures [G.8275.2]
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2175 ]
�
� |
Use of G.8275.2 with Full On-Path Networks [G.8275.2]
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2174 ]
�
� |
Various corrections to G.9901
�
� |
ERDF
� |
Q15/15
� |
2016-09-06 |
|
[ 2173 ]
�
� |
Copy G.8275.1 Appendix V to G.8275.2 [G.8275.2]
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2172 ]
�
� |
Various corrections for G.9901
�
Duplicate of C2174
� |
ERDF
� |
Q15/15
� |
2016-09-06 |
|
[ 2171 ]
�
� |
Monitoring PTP connections with alternateMasterFlag [G.8275.1]
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2170 ]
�
� |
G.fast: Mobile backhaul use cases
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2016-09-06 |
|
[ 2169 ]
�
� |
Update to Appendix V tables for Synchronization Uncertain [G.8275.1]
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2168 ]
�
� |
G.8266: Noise Transfer
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2016-09-06 |
|
[ 2167 ]
�
� |
G.8262: Correction to Long-Term Phase Transient
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2016-09-06 |
|
[ 2166 ]
�
(Rev.1)� |
Typo fix seconds/bit [G.8271]
�
� |
Microsemi Corporation
� |
Q13/15
� |
2016-09-06 |
|
[ 2165 ]
�
(Rev.1)� |
ODU SMP Operations Considerations
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/15, Q14/15
� |
2016-09-06 |
|
[ 2164 ]
�
� |
Considerations on 'Lockout of Protection (LoP)' for G.odusmp
�
� |
China Unicom
,
Huawei Technologies Co., Ltd.
� |
Q9/15
� |
2016-09-06 |
Results:2210 total items. Result page:�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):