International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2016-02-15�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2016-02-15)�

ITU-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting� from 2016-02-15 to 2016-02-26

held in Switzerland [Geneva]

Other Meetings : 2016-09-192015-06-222014-11-242014-03-242013-12-062013-07-012013-02-01

Results:26 total items.
Contributions �[�Source:�FiberHome Technologies Group�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1784 ]
Proposal on dual rate PMD reference design for XGS-PON � FiberHome Technologies Group Q2/15 2016-02-02
[ 1781 ]
(Rev.1)
Consideration for upstream dual-rate XGS-PON � FiberHome Technologies Group Q2/15 2016-02-02
[ 1738 ]
Physical and logical node in G.MDSP � FiberHome Technologies Group Q9/15 2016-02-02
[ 1737 ]
(Rev.1)
ERP consideration in G.MDSP � FiberHome Technologies Group Q9/15 2016-02-02
[ 1736 ]
Protection method for DNI scenario in G.mdsp � FiberHome Technologies Group Q9/15 2016-02-02
[ 1735 ]
(Rev.1)
Proposals for Interconnection use case in Appendix I of G.MDSP � FiberHome Technologies Group Q9/15 2016-02-02
[ 1729 ]
Dual-rate support in XGS-PON � British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , Orange , ZTE Corporation Q2/15 2016-02-02
[ 1689 ]
Consideration of ERP Management in G.Sup52 � FiberHome Technologies Group Q9/15, Q14/15 2016-02-01
[ 1685 ]
Proposal on smoothly upgrade requirements in the new Rec. L.oxcon � FiberHome Technologies Group Q16/15 2016-02-01
[ 1684 ]
ERP Management Requirements of G.8032 � FiberHome Technologies Group Q9/15, Q14/15 2016-02-01
[ 1680 ]
Proposals on adding the definitions of two attributes in revision of Rec. G.650.1 � FiberHome Technologies Group Q5/15 2016-02-01
[ 1632 ]
Proposal of initial a new standardization for Port-based protection in OTN network � Bharti Airtel Limited , China Unicom , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation Q9/15 2016-02-01
[ 1631 ]
Proposal to study MPLS-TP service information model pruning and refactoring � China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation Q14/15, Q10/15 2016-02-01
[ 1630 ]
Proposal to restart working on G.8132 aligned with MPLS working group, IETF � China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation Q9/15 2016-02-01
[ 1622 ]
Proposal of new section "8.4 Common interaction between architectural components" of G.cca � FiberHome Technologies Group Q14/15, Q12/15 2016-02-01
[ 1621 ]
Proposal of move section 8.5 to 9.3 of G.asdtn � FiberHome Technologies Group Q14/15, Q12/15 2016-02-01
[ 1619 ]
Proposal of new appendix about network migration of SDTN in G.asdt � China Mobile Communications Corporation , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) Q14/15, Q12/15 2016-02-01
[ 1609 ]
Proposals about centralized recovery for SDN controlled transport network � China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation Q9/15, Q14/15, Q12/15 2016-02-01
[ 1604 ]
Field trials and proposal of G.654 for terrestrial application � China Unicom , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , OFS Fitel, LLC Q6/15, Q5/15 2016-02-01
[ 1603 ]
(Rev.1)
The requirement of Yang module in MPLS-TP �
C-1603 Rev.1 adds Q14/15 as a destination Question. There is no change to the content of the Contribution.
FiberHome Technologies Group Q14/15, Q10/15 2016-02-01
[ 1602 ]
The consideration of interworking between OTUC1 and OTU4 � FiberHome Technologies Group Q11/15 2016-02-01
[ 1600 ]
(Rev.1)
The suggestion about multichannel parallel interfaces in B100G �
C-1600 Rev.1 adds Q6/15 as a destination Question. There is no change to the content of the Contribution.
FiberHome Technologies Group Q6/15, Q11/15 2016-02-01
[ 1580 ]
Proposal of electrical performance for revision of recommendation L.60 � FiberHome Technologies Group Q16/15 2016-01-31
[ 1579 ]
Revision proposal for Appendix I Chinese experience of recommendation L.60 � FiberHome Technologies Group Q16/15 2016-01-31
[ 1578 ]
Propose to include pilot-tone auxiliary channel protocol as the G.ROF PON adaptation function � FiberHome Technologies Group Q2/15 2016-01-31
[ 1577 ]
Comparison of three technical approaches of PON adaptation function in G.ROF � FiberHome Technologies Group Q2/15 2016-01-31
Results:26 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10