International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2014-03-24�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2014-03-24)�

ITU-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting� from 2014-03-24 to 2014-04-04

held in Switzerland [Geneva]

Other Meetings : 2016-09-192016-02-152015-06-222014-11-242013-12-062013-07-012013-02-01

Results:12 total items.
Contributions �[�Source:�Iometrix, Inc.�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 731 ]
Update of the table listing the ITU-T Recommendations suitable for conformity/interoperability testing � Iometrix, Inc. Q13/15 2014-03-11
[ 730 ]
C&I pilot project for Synchronous Ethernet technology � Iometrix, Inc. Q13/15 2014-03-11
[ 729 ]
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - request for unicast transmission of multiple types of PTP messages using Signaling messages � Iometrix, Inc. Q13/15 2014-03-11
[ 728 ]
Guidance on the usage of the methods for PDV tolerance testing in G.8263 � Iometrix, Inc. , Orange Q13/15 2014-03-11
[ 727 ]
PTP GM performance specification in ITU-T � Iometrix, Inc. , Orange Q13/15 2014-03-11
[ 726 ]
Notion of Quality Level of local clock in G.8265.1 during master selection � Iometrix, Inc. Q13/15 2014-03-11
[ 725 ]
Review of G.8275.1 Latest Draft � Iometrix, Inc. Q13/15 2014-03-11
[ 724 ]
Use of G.8265.1 telecom profile for Assisted Partial Timing Support � Iometrix, Inc. Q13/15 2014-03-11
[ 722 ]
Clarification of PTP unicast communication for G.8275.1, G.8275.2 and G.8265.1 - modification of frequencyTraceable flag, timeTraceable flag, and clockClass � Iometrix, Inc. Q13/15 2014-03-11
[ 721 ]
Comments on methods 1 and 2 for PDV tolerance testing in G.8263 � Iometrix, Inc. Q13/15 2014-03-11
[ 720 ]
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - use of all 1's for targetPortIdentity � Iometrix, Inc. Q13/15 2014-03-11
[ 452 ]
G.8273.2 T-BC Maximum Time Error Spezification � Deutsche Telekom AG , Iometrix, Inc. Q13/15 2014-02-27
Results:12 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10