International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2013-07-01�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2013-07-01)�

ITU-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting� from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-192016-02-152015-06-222014-11-242014-03-242013-12-062013-02-01

Results:18 total items.
Contributions �[�Source:�Fujitsu�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 341 ]
Proposed AAP period for consented terminology Recommendations � Hitachi, Ltd. , Fujitsu Q3/15 2013-06-18
[ 164 ]
Ethernet PM Terminologies in G.8013/Y.1731 and G.8052 � Fujitsu Limited Q14/15, Q10/15 2013-06-17
[ 163 ]
Proposed solution for SP#26 in G.8013/Y.1731 Living List � Fujitsu Limited Q10/15 2013-06-17
[ 162 ]
Usage for MI_GAL_ENABLE in PW � Fujitsu Limited Q14/15, Q12/15, Q10/15 2013-06-17
[ 161 ]
Comments and Proposed update OAM Process descriptions for draft G.8121.2 � Fujitsu Limited Q10/15 2013-06-17
[ 160 ]
Proposed re-structure of Clause 8.8.3 for draft G.8121.2 � Fujitsu Limited Q10/15 2013-06-17
[ 159 ]
Proposed update items to draft G.8121.1 (Clause 8 and 9) � Fujitsu Limited Q10/15 2013-06-17
[ 158 ]
(Rev.1)
Proposed Definitions and Abbreviations to draft G.8121.1 � Fujitsu Limited Q10/15 2013-06-17
[ 157 ]
Comments and proposed update for draft revised G.8121 � Fujitsu Limited Q10/15 2013-06-17
[ 156 ]
Proposed MPLS-TP Linear protection models for Appendix in G.8121 � Fujitsu Limited Q9/15, Q10/15 2013-06-17
[ 155 ]
Comments on draft G.808.2 � Fujitsu Limited Q9/15 2013-06-17
[ 154 ]
Consideration on the notification of availability for ODU SMP � Fujitsu Limited Q9/15 2013-06-17
[ 103 ]
Proposed Revisions to the Current G.mdsp Draft � Fujitsu Network Communications, Inc. Q9/15 2013-06-14
[ 98 ]
Considerations on flexible ODU and OTU overhead [SP7] � Fujitsu Limited Q11/15 2013-06-14
[ 97 ]
Comparisons between single and multi OTUCm/OCh signal approaches [SP4, SP5] � Fujitsu Limited Q11/15 2013-06-14
[ 96 ]
Considerations on B100G OTN multiplexing hierarchy [SP23] � Fujitsu Limited Q11/15 2013-06-14
[ 95 ]
(Rev.1)
Consideration on B100G OTN multiplexing � Fujitsu Limited Q11/15 2013-06-14
[ 93 ]
Consideration on 400GE signal transmission over B100G OTN � Fujitsu Limited Q11/15 2013-06-14
Results:18 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11