International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2013-07-01�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2013-07-01)�

ITU-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting� from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-192016-02-152015-06-222014-11-242014-03-242013-12-062013-02-01

Results:40 total items.
Contributions �[�AI/Question:�Q10/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 422 ]
(Rev.1)
MAC DA setting for Ethernet OAM frames � Alcatel-Lucent Italia S.p.A. Q9/15, Q10/15 2013-06-18
[ 421 ]
(Rev.1)
Considerations regarding ETH-VSP and ETH-EXP OAM functions � Alcatel-Lucent Italia S.p.A. Q10/15 2013-06-18
[ 420 ]
Proposed update to ITU-T Y.1731 TLVs registry � Telecom Italia S.p.A. Q10/15 2013-06-18
[ 416 ]
Recent progress and discussion on MPLS-TP P2MP � Nippon Telegraph and Telephone Corporation (NTT) Q12/15, Q10/15 2013-06-18
[ 391 ]
Version of ring APS PDUs in Y.1731 and editorial comments on Y.1731 � Alcatel-Lucent USA Inc. Q10/15 2013-06-18
[ 349 ]
Proposal to support OAM on rooted-multipoint connection in G.8013 � Electronics and Telecommunications Research Institute (ETRI) Q10/15 2013-06-18
[ 348 ]
Comments on the draft revised G.8011.4 � Electronics and Telecommunications Research Institute (ETRI) Q10/15 2013-06-18
[ 343 ]
Proposal for developing a new draft for EP-Tree � Hitachi, Ltd. Q10/15 2013-06-18
[ 300 ]
Proposal to add an appendix for MPLS-TP packet data throughput to G.8112 � Electronics and Telecommunications Research Institute (ETRI) , SK Telecom Q10/15 2013-06-17
[ 290 ]
(Rev.1)
Proposal to update Figure 9-1 of G.8021 � NEC Corporation Q14/15, Q10/15 2013-06-17
[ 289 ]
(Rev.1)
Proposed modification of PM terminologies in G.8021 � NEC Corporation Q10/15 2013-06-17
[ 288 ]
(Rev.1)
Proposed correction of MAC DA specification in G.8013 � NEC Corporation Q9/15, Q10/15 2013-06-17
[ 232 ]
Proposal on adding bandwidth degradation message in Y.1731 � Huawei Technologies Co. Ltd. Q10/15 2013-06-17
[ 227 ]
Enhancements of OTN hybrid equipment � China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd. Q11/15, Q10/15 2013-06-17
[ 214 ]
Proposal to add HAO capable ODUflex to MPLS-TP adaptation function � Huawei Technologies Co. Ltd. Q11/15, Q10/15 2013-06-17
[ 204 ]
Proposal to modify clause 7.1.2 for an Amendment to G.8113.1 � Korea (Rep. of) Q10/15 2013-06-17
[ 164 ]
Ethernet PM Terminologies in G.8013/Y.1731 and G.8052 � Fujitsu Limited Q14/15, Q10/15 2013-06-17
[ 163 ]
Proposed solution for SP#26 in G.8013/Y.1731 Living List � Fujitsu Limited Q10/15 2013-06-17
[ 162 ]
Usage for MI_GAL_ENABLE in PW � Fujitsu Limited Q14/15, Q12/15, Q10/15 2013-06-17
[ 161 ]
Comments and Proposed update OAM Process descriptions for draft G.8121.2 � Fujitsu Limited Q10/15 2013-06-17
[ 160 ]
Proposed re-structure of Clause 8.8.3 for draft G.8121.2 � Fujitsu Limited Q10/15 2013-06-17
[ 159 ]
Proposed update items to draft G.8121.1 (Clause 8 and 9) � Fujitsu Limited Q10/15 2013-06-17
[ 158 ]
(Rev.1)
Proposed Definitions and Abbreviations to draft G.8121.1 � Fujitsu Limited Q10/15 2013-06-17
[ 157 ]
Comments and proposed update for draft revised G.8121 � Fujitsu Limited Q10/15 2013-06-17
[ 156 ]
Proposed MPLS-TP Linear protection models for Appendix in G.8121 � Fujitsu Limited Q9/15, Q10/15 2013-06-17
[ 76 ]
Proposal to change the approval process for G.8113.1 and G.8113.2 from TAP to AAP � Canada Q10/15 2013-06-13
[ 60 ]
(Rev.1-3)
Comments on CCCV mode in G.8121.2 � FiberHome Technologies Group Q10/15 2013-06-13
[ 18 ]
Text Changes in G.8021 for At Risk signalling � Cisco Systems, Inc. Q9/15, Q14/15, Q10/15 2013-05-31
[ 17 ]
Text changes in Y.1731 for At Risk signalling � Cisco Systems, Inc. Q9/15, Q10/15 2013-05-31
[ 16 ]
"At Risk" signalling in Y.1731 Ethernet OAM � Cisco Systems, Inc. Q9/15, Q14/15, Q10/15 2013-05-31
[ 14 ]
LCK/AIS Reception Process in G.8121.2 � Cisco Systems, Inc. Q9/15, Q10/15 2013-05-29
[ 12 ]
Clarification regarding Dataplane Loopback in G.8121.2 � Cisco Systems, Inc. Q9/15, Q10/15 2013-05-29
[ 11 ]
Clarification regarding Dataplane Loopback in G.8121 � Cisco Systems, Inc. Q9/15, Q10/15 2013-05-29
[ 10 ]
Definition of Diagnostic Adapted Information in G.8121 � Cisco Systems, Inc. Q9/15, Q12/15, Q10/15 2013-05-29
[ 9 ]
Description of Sub-processes in G.8121.2 � Cisco Systems, Inc. Q9/15, Q10/15 2013-05-29
[ 8 ]
Comparison of sub-process in Clause 8.8 between G.8121.1 and G.8121.2 � Cisco Systems, Inc. Q9/15, Q10/15 2013-05-29
[ 7 ]
Proposed Text for Clauses 3 and 5 in G.8121.2 � Cisco Systems, Inc. Q9/15, Q10/15 2013-05-29
[ 6 ]
Minor corrections in Y.1731 Clause 9 � Cisco Systems, Inc. Q10/15 2013-05-28
[ 5 ]
Allocation of Y.1731 TLV Types for MEF Control Protocols � Alcatel-Lucent USA Inc. , Cisco Systems, Inc. Q9/15, Q10/15 2013-05-28
[ 4 ]
Assigning Y.1731 OpCodes for MEF Control Protocols � Alcatel-Lucent USA Inc. , Cisco Systems, Inc. Q9/15, Q10/15 2013-05-28
Results:40 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10