International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2013-07-01�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2013-07-01)�

ITU-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting� from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-192016-02-152015-06-222014-11-242014-03-242013-12-062013-02-01

Results:440 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 440 ]
clockClass usage in G.8275.1 � Orange Q13/15 2013-06-19
[ 439 ]
(Rev.1)
[FAST] Proposal for improvements to draft text for G.fast-psd � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2013-06-18
[ 438 ]
Extended RAM and Retransmission in VDSL2 on Vector Capable Hardware � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2013-06-18
[ 437 ]
VDSL2 FTTdp annex � Orange Q4/15 2013-06-18
[ 436 ]
[FAST] On Aggregate Transmitter Power � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2013-06-18
[ 435 ]
G.hn: a mechanism to protect specified slots from neighbouring interfering nodes � Sigma Designs Israel S.D.I Ltd. Q18/15 2013-06-18
[ 434 ]
[FAST] On Power Budget � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2013-06-18
[ 433 ]
G.hn: Proposal to reduce the number of valid combinations in RCM � Sigma Designs Israel S.D.I Ltd. Q18/15 2013-06-18
[ 432 ]
+Add.1
10G Upstream Optical Parameters � Alcatel-Lucent Deutschland AG Q2/15 2013-06-18
[ 431 ]
(Rev.1)
[FAST] On VHF background noise assumptions for G.FAST � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2013-06-18
[ 430 ]
Proposed text for draft G.MDSP based on existing OTN material � Alcatel-Lucent Deutschland AG Q9/15 2013-06-18
[ 429 ]
Considerations regarding G.MDSP � Alcatel-Lucent Italia S.p.A. Q9/15 2013-06-18
[ 428 ]
Definition of the "local add/drop" criteria in G.672 � Deutsche Telekom AG Q7/15 2013-06-18
[ 427 ]
Comments on circulated draft version of G.808.2 � Alcatel-Lucent Deutschland AG Q9/15 2013-06-18
[ 426 ]
Proposed enhancement of G.873.2 � Alcatel-Lucent Deutschland AG Q9/15 2013-06-18
[ 425 ]
Priority1 parameter and Domain number in G.8275.1 � Nokia Siemens Networks GmbH & Co. KG Q13/15 2013-06-18
[ 424 ]
G.8261.1: PDV Network Limit � Nokia Siemens Networks GmbH & Co. KG Q13/15 2013-06-18
[ 423 ]
Clock classes and selection algorithm in G.8275.1 � Nokia Siemens Networks GmbH & Co. KG Q13/15 2013-06-18
[ 422 ]
(Rev.1)
MAC DA setting for Ethernet OAM frames � Alcatel-Lucent Italia S.p.A. Q9/15, Q10/15 2013-06-18
[ 421 ]
(Rev.1)
Considerations regarding ETH-VSP and ETH-EXP OAM functions � Alcatel-Lucent Italia S.p.A. Q10/15 2013-06-18
[ 420 ]
Proposed update to ITU-T Y.1731 TLVs registry � Telecom Italia S.p.A. Q10/15 2013-06-18
[ 419 ]
G.fast: Discontinuous operation is not always the way to minimize power � Sckipio Technologies S.I. Ltd. Q4/15 2013-06-18
[ 418 ]
Discussion and proposal on progress in MPLS-TP linear protection � Nippon Telegraph and Telephone Corporation (NTT) Q9/15 2013-06-18
[ 417 ]
Proposed text for G.mdsp � Alcatel-Lucent Italia S.p.A. , Telecom Italia S.p.A. Q9/15 2013-06-18
[ 416 ]
Recent progress and discussion on MPLS-TP P2MP � Nippon Telegraph and Telephone Corporation (NTT) Q12/15, Q10/15 2013-06-18
[ 415 ]
Proposal to continue security of optical infrastructure considerations � TELEKOMUNIKACJA POLSKA S.A. Q17/15 2013-06-18
[ 414 ]
Inputs on procedures for transport SDN discussion � Nippon Telegraph and Telephone Corporation (NTT) Q14/15, Q12/15 2013-06-18
[ 413 ]
[FAST] Low Power Mode Requirements for G.FAST � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2013-06-18
[ 412 ]
Way forward on PDV network limits in G.8261.1 � Orange Q13/15 2013-06-18
[ 411 ]
Updated text for the new Appendix "Evaluation of the Packet Delay Variation generation and asymmetry in a network node" in G.8261.1 � Orange Q13/15 2013-06-18
[ 410 ]
G.fast: OLR procedures during G.fast initialization � Lantiq Beteiligungs-GmbH & Co. KG Q4/15 2013-06-18
[ 409 ]
PTP attributes values in G.8275.1 � Orange Q13/15 2013-06-18
[ 408 ]
Text for Annex A of G.8275.1 � Orange Q13/15 2013-06-18
[ 407 ]
Phase/time network limits in G.8271.1 � Orange Q13/15 2013-06-18
[ 406 ]
G.fast: DRA primitives and interface requirements at the gamma reference point � Alcatel-Lucent Bell N.V. Q4/15 2013-06-18
[ 405 ]
G.fast: Energy Efficiency-performance trade-offs � Alcatel-Lucent Bell N.V. Q4/15 2013-06-18
[ 404 ]
G.fast: Vectoring Backchannel Encapsulation � Alcatel-Lucent Bell N.V. Q4/15 2013-06-18
[ 403 ]
Requirements for passive Metro DWDM interfaces � Deutsche Telekom AG Q6/15, Q11/15 2013-06-18
[ 402 ]
Requirements for Beyond 100G OTN � Nippon Telegraph and Telephone Corporation (NTT) Q11/15 2013-06-18
[ 401 ]
Application scenarios using new Metro DWDM interfaces � Deutsche Telekom AG Q6/15, Q11/15 2013-06-18
[ 400 ]
The difference of the trib and line side between the existing OTN and B100G OTN � FiberHome Technologies Group Q11/15 2013-06-18
[ 399 ]
The requirement of optical overhead extend at IrDI � China Unicom , FiberHome Technologies Group Q11/15 2013-06-18
[ 398 ]
G.fast: On Line Reconfiguration for Precoder Gain Scaling: working text figures � Alcatel-Lucent Bell N.V. Q4/15 2013-06-18
[ 397 ]
The discussion about OTM- n.m IaDI interface of B100G � China Mobile Communications Corporation , FiberHome Technologies Group Q11/15 2013-06-18
[ 396 ]
The suggestion about OTM-0.mvn IrDI interface of B100G � China Mobile Communications Corporation , China Mobile Communications Corporation Q11/15 2013-06-18
[ 395 ]
Support for Ethernet linear protection solutions applicable to DNI scenarios � Telecom Italia S.p.A. Q9/15 2013-06-18
[ 394 ]
Selection of protection transport entities in m1 SMP architecture � FiberHome Technologies Group Q9/15 2013-06-18
[ 393 ]
Editorial suggestions for G.8131.1 � FiberHome Technologies Group Q9/15 2013-06-18
[ 392 ]
G.mdsp proposed new network objectives � Telecom Italia S.p.A. Q9/15 2013-06-18
[ 391 ]
Version of ring APS PDUs in Y.1731 and editorial comments on Y.1731 � Alcatel-Lucent USA Inc. Q10/15 2013-06-18
Results:440 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25