International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 11 : WP 1,2,3,4/11�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 11� TD�(2013-11-07)�

ITU-T�SG 11

Protocols and test specifications

Study Period 2013

Meeting� from 2013-11-07 to 2013-11-20

held in Uganda [Kampala]

Other Meetings : 2016-06-272016-04-292016-03-242015-12-022015-04-222014-11-212014-07-092014-02-212013-11-14� [ 2013-11-07 ]� 2013-06-212013-02-25

Results:24 total items.
Temporary Documents �(GEN) �[�AI/Question:�Q11/11�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 318-GEN ]
(Rev.1-2)
Agenda WP4 Plenary � Chairman WP4 Q15/11, Q14/11, Q13/11, Q12/11, Q11/11, Q10/11 2013-11-20
[ 317-GEN ]
(Rev.1)
Working Party 4/11 Draft Meeting Report (Geneva, 14-20 November 2013) � Chairman WP4/11 Q15/11, Q14/11, Q13/11, Q12/11, Q11/11, Q10/11 2013-11-20
[ 315-GEN ]
(Rev.1-2)
Report of Question 11/11 meeting (Geneva, 14-20 November 2013) � Rapporteur Q11/11 Q11/11 2013-11-19
[ 307-GEN ]
Output - New draft Recommendation Q.test_app "ITU-T's general approaches of testing of ICT products"[revised Q.3900] � Editor Q11/11 2013-11-18
[ 306-GEN ]
(Rev.1-2)
Scope of the new work item Q.TL-rec-pro "Testing Laboratories recognition procedure" � Rapporteur Q11/11 Q11/11 2013-11-18
[ 295-GEN ]
(Rev.1)
LS/o on Correspondence Group on collaboration between ITU-T and testing laboratories for ITU C&I programme [to ITU-T Study Groups and TSAG] � Rapporteur Q11/11 Q11/11 2013-11-18
[ 294-GEN ]
(Rev.1)
Output - ToR for Correspondence Group (CG) on collaboration between ITU-T and testing laboratories for ITU C&I programme � Rapporteur Q11/11 Q11/11 2013-11-18
[ 292-GEN ]
Conformance assessment of Synchronous Ethernet technology � Chairman WP4/11 Q11/11 2013-11-18
[ 287-GEN ]
Presentation slides provided for information (Geneva, 14 November 2013) � Chairman WP4/11 Q11/11, Q10/11 2013-11-15
[ 284-GEN ]
Output - draft new Recommendation ITU-T Q.3942.3 "Conformance test specification for the terminating identification restriction using IP multimedia core network subsystem - Part 3: User side; Test Suite Structure and Test Purposes (TSS&TP)" � Editor Q11/11 2013-11-15
[ 283-GEN ]
Output - draft new Recommendation ITU-T Q.3942.2: "Conformance test specification for the terminating identification restriction using IP multimedia core network subsystem - Part 2: Network side ; Test Suite Structure and Test Purposes (TSS&TP) " � Editor Q11/11 2013-11-15
[ 257-GEN ]
LS/i/r on request to all Study Groups to update the reference table of ITU-T Recommendations to be tested for conformity/interoperability, parameters and available test suites (COM11-LS-10) [from ITU-T SG16] � ITU-T SG16 Q11/11 2013-11-11
[ 251-GEN ]
Work-programme of Q11/11 as of 10 November 2013 � TSB Q11/11 2013-11-11
[ 246-GEN ]
Information about new approach and test strategy for User Equipment testing in the IMS-based PSTN/ISDN Emulation subsystem � Chairman WP4/11 Q11/11 2013-11-08
[ 243-GEN ]
(Rev.1)
Draft agenda of Q11/11 "Protocols and Networks Test Specifications" � Rapporteur Q11/11 Q11/11 2013-11-08
[ 241-GEN ]
(Rev.1)
Draft Agenda for WP 4/11 "Test specifications" � Chairman WP4/11 Q15/11, Q14/11, Q13/11, Q12/11, Q11/11, Q10/11 2013-11-08
[ 237-GEN ]
LS/i on GSMA and 3GPP security testing of mobile infrastructure equipment [from GSMA] � GSMA Q8/11, Q11/11 2013-11-07
[ 215-GEN ]
LS/i on consent of draft Recommendation ITU-T M.3710 (ex. M.oast) [from ITU-T SG2] � ITU-T SG2 Q11/11 2013-10-24
[ 214-GEN ]
LS/i on M.3170 series of Recommendations conformance testing pilot project [from ITU-T SG2] � ITU-T SG2 Q11/11 2013-10-24
[ 210-GEN ]
Draft Technical Report on Y.phys-arch "the Physical Realisation of NGN" � Editor Q8/11, Q11/11 2013-10-09
[ 209-GEN ]
(Rev.1)
Draft meeting plan, WP4/11: Geneva, 14-20 November 2013 � TSB Q15/11, Q14/11, Q13/11, Q12/11, Q11/11, Q10/11 2013-09-17
[ 206-GEN ]
LS/i/r on Conformance and Interoperability (reply to SG11-LS13 and SG11-LS10) [from ITU-T SG15] � ITU-T SG15 Q11/11 2013-08-08
[ 205-GEN ]
LS/i/r on Conformance and Interoperability Testing (CIT) activities for WP1/15 Recommendations (reply to SG11-LS10) [from ITU-T SG15] � ITU-T SG15 Q11/11 2013-08-08
[ 204-GEN ]
LS/i on Conformance and Interoperability (reply to JCA-CIT-LS14) [from ITU-T SG15] � ITU-T SG15 Q11/11 2013-08-08
Results:24 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25